[{"name":"S2-2405843","title":"LS from CT WG1: LS on identifiers of 5G ProSe end UEs for 5G ProSe UE-to-UE relay discovery","source":"CT WG1","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"LS in","for":"Action","abstract":"CT WG1 has the following understanding regarding the identifier(s) of the 5G ProSe end UE(s) in 5G ProSe UE-to-UE relay discovery procedures: The application layer ID(s) of the 5G ProSe end UE(s) are the identifiers included in the protected direct discovery set, for the following reasons: - the direct discovery set is for end-to-end discovery between the 5G ProSe end UEs; - the 5G ProSe end UE cannot know the provisioned\/configured user info ID(s) of other 5G ProSe end UE(s) for 5G ProSe UE-to-UE relay discovery, e.g. if the user info ID is provided by the PCF, provisioned in the ME or configured in the UICC. Based on the above understanding, the provisioned\/configured user info ID in the 5G ProSe end UE for 5G ProSe UE-to-UE relay discovery is not needed and CT WG1 has decided to remove it. Action: CT WG1 kindly asks SA WG2 and SA WG3 to take the above information into consideration, and update their specifications accordingly or provide feedback if any.","secretary_remarks":"Revision of Postponed S2-2403872 from S2#162. Noted in parallel session","agenda_item_sort_order":79,"ainumber":"9.7.2","ainame":"Proximity-based Services in 5GS Phase 2 (5G_ProSe_Ph2)","tdoc_agenda_sort_order":11360,"status":"noted","reservation_date":"2024-04-24 06:41:40","uploaded":"2024-04-24 06:43:27","revisionof":"S2-2403872","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, SA WG3","Cc":"","lsoriginalls":"C1-241787","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_163_Jeju_2024-05\/Docs\/S2-2405843.zip","group":"S2","meeting":"S2-163","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2406302","title":"Alignment with stage 3 specification on End UE user info and Direct discovery set","source":"CATT, Samsung","contact":"Qiang Deng","contact-id":74437,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the provisioned\/configured User Info ID of End UE and clarify user info of End UE is Application Layer ID. Clarify that the Direct Discovery Set includes a list of protected user info.","secretary_remarks":"Revised in parallel session to S2-2406892.","agenda_item_sort_order":79,"ainumber":"9.7.2","ainame":"Proximity-based Services in 5GS Phase 2 (5G_ProSe_Ph2)","tdoc_agenda_sort_order":11380,"status":"revised","reservation_date":"2024-05-17 02:12:19","uploaded":"2024-05-17 08:37:52","revisionof":"","revisedto":"S2-2406892","release":"Rel-18","crspec":"23.304","crspecversion":"18.5.1","workitem":[{"winame":"5G_ProSe_Ph2"}],"crnumber":443.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_163_Jeju_2024-05\/Docs\/S2-2406302.zip","group":"S2","meeting":"S2-163","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2406859","title":"LS from SA WG3: Reply LS on identifications of 5G ProSe End UEs for 5G ProSe UE-to-UE relay discovery","source":"SA WG3","contact":" Anonymous","contact-id":4132,"tdoctype":"LS in","for":"Action","abstract":"SA WG3 thanks CT WG1 for their LS on identifiers of 5G ProSe end UEs for 5G ProSe UE-to-UE relay discovery. SA WG3 has agreed the attached CR (S3-242403) to align with CT WG1's specification. Action: SA WG3 kindly asks CT WG1 and SA WG2 to take above information into account.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":79,"ainumber":"9.7.2","ainame":"Proximity-based Services in 5GS Phase 2 (5G_ProSe_Ph2)","tdoc_agenda_sort_order":11370,"status":"noted","reservation_date":"2024-05-24 07:46:09","uploaded":"2024-05-24 07:46:42","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1, SA WG2","Cc":"","lsoriginalls":"S3-242404","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_163_Jeju_2024-05\/Docs\/S2-2406859.zip","group":"S2","meeting":"S2-163","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2406892","title":"Alignment with stage 3 specification on End UE user info and Direct discovery set","source":"CATT, Samsung, Qualcomm Incorporated","contact":"Qiang Deng","contact-id":74437,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the provisioned\/configured User Info ID of End UE and clarify user info of End UE is Application Layer ID. Clarify that the Direct Discovery Set includes a list of protected user info.","secretary_remarks":"Revision of S2-2406302. Agreed in parallel session. Block approved","agenda_item_sort_order":79,"ainumber":"9.7.2","ainame":"Proximity-based Services in 5GS Phase 2 (5G_ProSe_Ph2)","tdoc_agenda_sort_order":11390,"status":"agreed","reservation_date":"2024-05-30 05:19:28","uploaded":"2024-06-03 05:31:13","revisionof":"S2-2406302","revisedto":"","release":"Rel-18","crspec":"23.304","crspecversion":"18.5.1","workitem":[{"winame":"5G_ProSe_Ph2"}],"crnumber":443.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-240588","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_163_Jeju_2024-05\/Docs\/S2-2406892.zip","group":"S2","meeting":"S2-163","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]