[{"name":"S2-2406758","title":"Update the user plane positioning","source":"CATT","contact":"Yunjing Hou","contact-id":46707,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If the LMF determines to select the user plane for the positioning procedure, all the supplementary services messages and LPP messages related to the positioning procedure are transferred via the user plane. To support the limitation, the UE and LMF behaviour is described. During the positioning procedure for which the user plane connection is used to transfer supplementary services messages and LPP messages, if the user plane positioning dedicated PDU Session is released based on the triggers described in clause 4.3.4.2 in TS 23.502[19], the LMF and UE behaviour to support the limitation in bullet 1 is also described.","secretary_remarks":"Not Handled","agenda_item_sort_order":78,"ainumber":"9.6.2","ainame":"5GC LoCation Services Phase 3 (eLCS_Ph3)","tdoc_agenda_sort_order":11340,"status":"not treated","reservation_date":"2024-05-17 16:42:08","uploaded":"2024-05-17 16:56:52","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.273","crspecversion":"18.5.0","workitem":[{"winame":"5G_eLCS_Ph3"}],"crnumber":531.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_163_Jeju_2024-05\/Docs\/S2-2406758.zip","group":"S2","meeting":"S2-163","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.10","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2406759","title":"Add description for immediate location request cancellation","source":"CATT","contact":"Yunjing Hou","contact-id":46707,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Update functional description for AMF and LMF and LMF service operation to complete the description related to cancellation of 5GC-MT-LR and 5GC-MO-LR during UE mobility from 5GS to EPS with N26 interface.","secretary_remarks":"Not Handled","agenda_item_sort_order":78,"ainumber":"9.6.2","ainame":"5GC LoCation Services Phase 3 (eLCS_Ph3)","tdoc_agenda_sort_order":11350,"status":"not treated","reservation_date":"2024-05-17 16:42:09","uploaded":"2024-05-17 16:56:52","revisionof":"S2-2401117","revisedto":"","release":"Rel-18","crspec":"23.273","crspecversion":"18.5.0","workitem":[{"winame":"5G_eLCS_Ph3"}],"crnumber":494.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_163_Jeju_2024-05\/Docs\/S2-2406759.zip","group":"S2","meeting":"S2-163","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.3.7, 4.3.8, 8.3.2.1, 8.3.2.4","crsinpack":null,"crsinpacknumber":0}]