[{"name":"RP-260535","title":"Status report for NR demodulation performance: Phase 6; rapporteur; China Telecom, BT","source":"RAN4","contact":"Jianchi Zhu","contact-id":58216,"tdoctype":"WI status report","for":"","abstract":"WI 33%","secretary_remarks":"","agenda_item_sort_order":72,"ainumber":"9.3.4.5","ainame":"Perf. part: NR demodulation perf. Phase 6 [RAN4 led WI: NR_demod_Ph6-Perf]","tdoc_agenda_sort_order":5350,"status":"noted","reservation_date":"2026-02-26 08:46:38","uploaded":"2026-03-02 08:54:32","revisionof":"","revisedto":"","release":"Rel-20","crspec":"","crspecversion":"","workitem":[{"winame":"NR_demod_Ph6-Perf"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/TSG_RAN\/TSGR_111\/Docs\/RP-260535.zip","group":"RP","meeting":"RP-111","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]