[{"name":"S2-2409571","title":"LS from CT WG3: Reply LS on UPSI handling at the UE","source":"CT WG3","contact":"Hanna Lim","contact-id":95574,"tdoctype":"LS in","for":"Action","abstract":"CT WG3 thanks SA WG2 on their reply LS on UPSI handling at the UE and their request to CT WG3 to discuss this topic further and resolve. Based on the LSs which have been exchanged among CT WG3 (C3-224697), SA WG2 (C3-230022 \/ S2-2211347), CT WG1 (C3-233020 \/ C1-234389) and again SA WG2 (C3-240022 \/ S2-2313760), it is considered that the case when 'the PCF may provide full list of PSIs to the UE and there may be a potential misalignment between the list of PSIs provisioned at the UE and those sent by the PCF, given that the UE may have removed some or all PSIs', exists when serving PCF changes. CT WG3 has concluded that the problem can be solved without impacting interfaces if the PCF first removes all the UE Policies in the UE as per the list of UPSI(s) stored in UDR\/PCF and then provide to the UE all determined UE Policies and decided to make a NOTE in TS 29.525 as attached. Action: CT WG3 kindly asks SA WG2 to take above information into account.","secretary_remarks":"Revision of S2-2407444 from SA2#164. Response drafted in S2-2410276. Noted in parallel session","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13740,"status":"noted","reservation_date":"2024-09-23 09:35:13","uploaded":"2024-09-23 09:36:47","revisionof":"S2-2407444","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"CT WG1","lsoriginalls":"C3-243450","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409571.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409792","title":"Correction on the misalignment on Policy control based on URSP awareness","source":"Huawei, HiSilicon, CATT, Oracle","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align with TS 23.288 on the terms.","secretary_remarks":"Revision of (revised and postponed) S2-2407915. Revised in parallel session to S2-2410888.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13760,"status":"revised","reservation_date":"2024-09-30 08:11:44","uploaded":"2024-10-04 05:14:09","revisionof":"S2-2407915","revisedto":"S2-2410888","release":"Rel-18","crspec":"23.503","crspecversion":"18.7.0","workitem":[{"winame":"eUEPO"}],"crnumber":1338.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409792.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.1.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409793","title":"Correction on the misalignment on Policy control based on URSP awareness","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: Align with TS 23.288 on the terms.","secretary_remarks":"Revision of (revised and postponed) S2-2407916. Revised in parallel session to S2-2410889.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13790,"status":"revised","reservation_date":"2024-09-30 08:11:44","uploaded":"2024-10-04 05:14:09","revisionof":"S2-2407916","revisedto":"S2-2410889","release":"Rel-19","crspec":"23.503","crspecversion":"19.1.0","workitem":[{"winame":"eUEPO"}],"crnumber":1339.0,"crrevision":3.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2409793.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"6.1.1.5.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410114","title":"URSP provisioning in EPS support indication at PDU Session Establishment","source":"Ericsson, Intel","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: A UE that supports URSP Rule provisioning in EPS provides in the ePCO at PDU Session establishment to the SMF. The SMF+PGW-C provides in the ePCO its supports for URSP Rule provisioning in EPS if it receives the indication that the UE also supports it. The UE and the SMF considers the PDU Session supporting URSP Rule provisioning in EPC. The UE stores the indication of support of URSP Rule provisining in EPS received during PDN connection establishment to cover the case of mobility to 5GS then back to EPC. References to 24.501 as it is defined in stage 3. Provisioning of the URSP Rule provisioning in EPS capability to the PCF for the PDU Session.","secretary_remarks":"Revision of (postponed) S2-2409504. Revised in parallel session to S2-2410890.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13810,"status":"revised","reservation_date":"2024-03-10 11:47:22","uploaded":"2024-10-04 22:00:02","revisionof":"S2-2409504","revisedto":"S2-2410890","release":"Rel-18","crspec":"23.501","crspecversion":"18.7.0","workitem":[{"winame":"eUEPO"}],"crnumber":5408.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410114.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410115","title":"URSP provisioning in EPS support indication at PDU Session Establishment","source":"Ericsson, Intel","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: A UE that supports URSP Rule provisioning in EPS provides in the ePCO at PDU Session establishment to the SMF. The SMF+PGW-C provides in the ePCO its supports for URSP Rule provisioning in EPS if it receives the indication that the UE also supports it. The UE and the SMF considers the PDU Session supporting URSP Rule provisioning in EPC. The UE stores the indication of support of URSP Rule provisioning in EPS received during PDN connection establishment to cover the case of mobility to 5GS then back to EPC. References to 24.501 as it is defined in stage 3. Provisioning of the URSP Rule provisioning in EPS capability to the PCF for the PDU Session.","secretary_remarks":"Revision of (withdraen) S2-2409505. Revised in parallel session to S2-2410891.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13840,"status":"revised","reservation_date":"2024-03-10 11:47:32","uploaded":"2024-10-04 22:00:02","revisionof":"S2-2409505","revisedto":"S2-2410891","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"eUEPO"}],"crnumber":5409.0,"crrevision":3.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410115.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410269","title":"[DRAFT] Reply LS on UPSI handling at the UE","source":"CATT","contact":"Xiaoyan Duan","contact-id":85499,"tdoctype":"LS out","for":"Approval","abstract":"Draft reply LS to CT WG3 on UPSI handling at the UE.","secretary_remarks":"Response to S2-2409571. Noted in parallel session","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13750,"status":"noted","reservation_date":"2024-04-10 04:57:49","uploaded":"2024-10-04 05:30:39","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_Ph1"},{"winame":" eUEPO"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG3","Cc":"CT WG1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410269.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410888","title":"Correction on the misalignment on Policy control based on URSP awareness","source":"Huawei, HiSilicon, CATT, Oracle","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align with TS 23.288 on the terms.","secretary_remarks":"Revision of S2-2409792. Revised in parallel session to S2-2411167.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13770,"status":"revised","reservation_date":"2024-10-18 02:10:22","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2409792","revisedto":"S2-2411167","release":"Rel-18","crspec":"23.503","crspecversion":"18.7.0","workitem":[{"winame":"eUEPO"}],"crnumber":1338.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410888.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410889","title":"Correction on the misalignment on Policy control based on URSP awareness","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: Align with TS 23.288 on the terms.","secretary_remarks":"Revision of S2-2409793. Agreed in parallel session. Block approved","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13800,"status":"agreed","reservation_date":"2024-10-18 02:10:23","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2409793","revisedto":"","release":"Rel-19","crspec":"23.503","crspecversion":"19.1.0","workitem":[{"winame":"eUEPO"}],"crnumber":1339.0,"crrevision":4.0,"crcategory":"A","tsg_crp":"SP-241475","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410889.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410890","title":"URSP provisioning in EPS support indication at PDU Session Establishment","source":"Ericsson, Intel","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: A UE that supports URSP Rule provisioning in EPS provides in the ePCO at PDU Session establishment to the SMF. The SMF+PGW-C provides in the ePCO its supports for URSP Rule provisioning in EPS if it receives the indication that the UE also supports it. The UE and the SMF considers the PDU Session supporting URSP Rule provisioning in EPC. The UE stores the indication of support of URSP Rule provisining in EPS received during PDN connection establishment to cover the case of mobility to 5GS then back to EPC. References to 24.501 as it is defined in stage 3. Provisioning of the URSP Rule provisioning in EPS capability to the PCF for the PDU Session.","secretary_remarks":"Revision of S2-2410114. Revised in parallel session to S2-2411168.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13820,"status":"revised","reservation_date":"2024-10-18 02:10:24","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410114","revisedto":"S2-2411168","release":"Rel-18","crspec":"23.501","crspecversion":"18.7.0","workitem":[{"winame":"eUEPO"}],"crnumber":5408.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410890.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2410891","title":"URSP provisioning in EPS support indication at PDU Session Establishment","source":"Ericsson, Intel","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: A UE that supports URSP Rule provisioning in EPS provides in the ePCO at PDU Session establishment to the SMF. The SMF+PGW-C provides in the ePCO its supports for URSP Rule provisioning in EPS if it receives the indication that the UE also supports it. The UE and the SMF considers the PDU Session supporting URSP Rule provisioning in EPC. The UE stores the indication of support of URSP Rule provisioning in EPS received during PDN connection establishment to cover the case of mobility to 5GS then back to EPC. References to 24.501 as it is defined in stage 3. Provisioning of the URSP Rule provisioning in EPS capability to the PCF for the PDU Session.","secretary_remarks":"Revision of S2-2410115. Revised in parallel session to S2-2411169.","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13850,"status":"revised","reservation_date":"2024-10-18 02:10:25","uploaded":"2024-10-20 10:31:14","revisionof":"S2-2410115","revisedto":"S2-2411169","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"eUEPO"}],"crnumber":5409.0,"crrevision":4.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2410891.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411167","title":"Correction on the misalignment on Policy control based on URSP awareness","source":"Huawei, HiSilicon, CATT, Oracle","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align with TS 23.288 on the terms.","secretary_remarks":"Revision of S2-2410888. Agreed in parallel session. Block approved","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13780,"status":"agreed","reservation_date":"2024-10-18 02:16:36","uploaded":"2024-10-20 10:31:15","revisionof":"S2-2410888","revisedto":"","release":"Rel-18","crspec":"23.503","crspecversion":"18.7.0","workitem":[{"winame":"eUEPO"}],"crnumber":1338.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-241475","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2411167.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411168","title":"URSP provisioning in EPS support indication at PDU Session Establishment","source":"Ericsson, Intel","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: A UE that supports URSP Rule provisioning in EPS provides in the ePCO at PDU Session establishment to the SMF. The SMF+PGW-C provides in the ePCO its supports for URSP Rule provisioning in EPS if it receives the indication that the UE also supports it. The UE and the SMF considers the PDU Session supporting URSP Rule provisioning in EPC. The UE stores the indication of support of URSP Rule provisining in EPS received during PDN connection establishment to cover the case of mobility to 5GS then back to EPC. References to 24.501 as it is defined in stage 3. Provisioning of the URSP Rule provisioning in EPS capability to the PCF for the PDU Session.","secretary_remarks":"Revision of S2-2410890. Agreed in parallel session. Block approved","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13830,"status":"agreed","reservation_date":"2024-10-18 02:16:37","uploaded":"2024-10-20 10:31:15","revisionof":"S2-2410890","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.7.0","workitem":[{"winame":"eUEPO"}],"crnumber":5408.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-241475","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2411168.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2411169","title":"URSP provisioning in EPS support indication at PDU Session Establishment","source":"Ericsson, Intel","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: A UE that supports URSP Rule provisioning in EPS provides in the ePCO at PDU Session establishment to the SMF. The SMF+PGW-C provides in the ePCO its supports for URSP Rule provisioning in EPS if it receives the indication that the UE also supports it. The UE and the SMF considers the PDU Session supporting URSP Rule provisioning in EPC. The UE stores the indication of support of URSP Rule provisioning in EPS received during PDN connection establishment to cover the case of mobility to 5GS then back to EPC. References to 24.501 as it is defined in stage 3. Provisioning of the URSP Rule provisioning in EPS capability to the PCF for the PDU Session.","secretary_remarks":"Revision of S2-2410891. Agreed in parallel session. Block approved","agenda_item_sort_order":97,"ainumber":"9.25.2","ainame":"Enhancement of 5G UE Policy (eUEPO)","tdoc_agenda_sort_order":13860,"status":"agreed","reservation_date":"2024-10-18 02:16:38","uploaded":"2024-10-20 10:31:15","revisionof":"S2-2410891","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.1.0","workitem":[{"winame":"eUEPO"}],"crnumber":5409.0,"crrevision":5.0,"crcategory":"A","tsg_crp":"SP-241475","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_165_Hyderabad_2024-10\/Docs\/S2-2411169.zip","group":"S2","meeting":"S2-165","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]