[{"name":"S2-2408378","title":"Clarification on PRU timer considering start of unavailability period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: AMF also considers the time at which it receives the Registration Request message from the UE in addition to the Start of Unavailability Period provided from the UE.","secretary_remarks":"Revised in parallel session to S2-2408853.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11590,"status":"revised","reservation_date":"2024-09-08 10:55:22","uploaded":"2024-08-09 16:41:32","revisionof":"","revisedto":"S2-2408853","release":"Rel-18","crspec":"23.501","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5569.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408378.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408379","title":"Clarification on PRU timer considering start of unavailability period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: AMF also considers the time at which it receives the Registration Request message from the UE in addition to the Start of Unavailability Period provided from the UE.","secretary_remarks":"Revised in parallel session to S2-2408854.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11620,"status":"revised","reservation_date":"2024-09-08 10:55:22","uploaded":"2024-08-09 16:41:32","revisionof":"","revisedto":"S2-2408854","release":"Rel-19","crspec":"23.501","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5570.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408379.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408645","title":"Applying UE determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify UE indicated unavailability period and start of unavailability values are final for AMF to .determine UE reachability, power saving parameter, Periodic Registration Update timer value and to constructing the 'Loss of Connectivity'","secretary_remarks":"","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11020,"status":"revised","reservation_date":"2024-09-08 19:21:36","uploaded":"2024-08-09 19:30:33","revisionof":"","revisedto":"S2-2408855","release":"Rel-18","crspec":"23.501","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5614.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408645.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408646","title":"Applying UE determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify UE indicated unavailability period and start of unavailability values are final for AMF to .determine UE reachability, power saving parameter, Periodic Registration Update timer value and to constructing the 'Loss of Connectivity'","secretary_remarks":"","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11030,"status":"revised","reservation_date":"2024-09-08 19:25:56","uploaded":"2024-08-09 19:30:33","revisionof":"","revisedto":"S2-2408856","release":"Rel-19","crspec":"23.501","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5615.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408646.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408650","title":"Applying UE determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE can update new values of unavailability information It is proposed to clarify UE indicated unavailability period and start of unavailability values are final for MME to .determine UE reachability, power saving parameter, Periodic TAU value","secretary_remarks":"","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11040,"status":"revised","reservation_date":"2024-09-08 20:04:53","uploaded":"2024-08-09 20:08:56","revisionof":"","revisedto":"S2-2408857","release":"Rel-18","crspec":"23.401","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3814.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408650.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408853","title":"Clarification on PRU timer considering start of unavailability period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: AMF also considers the time at which it receives the Registration Request message from the UE in addition to the Start of Unavailability Period provided from the UE.","secretary_remarks":"Revision of S2-2408378. Revised in parallel session to S2-2409116.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11600,"status":"revised","reservation_date":"2024-08-25 18:31:40","uploaded":"2024-08-25 18:41:06","revisionof":"S2-2408378","revisedto":"S2-2409116","release":"Rel-18","crspec":"23.501","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5569.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408853.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408854","title":"Clarification on PRU timer considering start of unavailability period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Rel-19 mirror CR: Summary of change: AMF considers the duration of time between when it receives the Registration Request message from the UE and the Start of Unavailability Period as well after the unavailability period as possible when determining the PRU timer duration.","secretary_remarks":"Revision of S2-2408379. Agreed in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11640,"status":"agreed","reservation_date":"2024-08-25 18:31:40","uploaded":"2024-08-25 18:41:06","revisionof":"S2-2408379","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5570.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"SP-241256","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408854.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408855","title":"Applying AMF determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify UE indicated unavailability period and start of unavailability values are final for AMF to .determine UE reachability, power saving parameter, Periodic Registration Update timer value and to constructing the 'Loss of Connectivity'","secretary_remarks":"Revision of S2-2408645. Revised in parallel session to S2-2409117.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11650,"status":"revised","reservation_date":"2024-08-25 18:31:41","uploaded":"2024-08-25 18:41:06","revisionof":"S2-2408645","revisedto":"S2-2409117","release":"Rel-18","crspec":"23.501","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5614.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408855.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408856","title":"Applying AMF determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify UE indicated unavailability period and start of unavailability values are final for AMF to .determine UE reachability, power saving parameter, Periodic Registration Update timer value and to constructing the 'Loss of Connectivity'","secretary_remarks":"Revision of S2-2408646. Revised in parallel session to S2-2409118.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11680,"status":"revised","reservation_date":"2024-08-25 18:31:42","uploaded":"2024-08-25 18:41:06","revisionof":"S2-2408646","revisedto":"S2-2409118","release":"Rel-19","crspec":"23.501","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5615.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408856.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2408857","title":"Applying AMF determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: UE can update new values of unavailability information It is proposed to clarify UE indicated unavailability period and start of unavailability values are final for MME to .determine UE reachability, power saving parameter, Periodic TAU value","secretary_remarks":"Revision of S2-2408650. Revised in parallel session to S2-2409119.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11710,"status":"revised","reservation_date":"2024-08-25 18:31:43","uploaded":"2024-08-25 18:41:06","revisionof":"S2-2408650","revisedto":"S2-2409119","release":"Rel-18","crspec":"23.401","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3814.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2408857.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409116","title":"Clarification on PRU timer considering start of unavailability period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: AMF considers the duration of time between when it receives the Registration Request message from the UE and the Start of Unavailability Period as well after the unavailability period as possible when determining the PRU timer duration.","secretary_remarks":"Revision of S2-2408853. Agreed in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11620,"status":"agreed","reservation_date":"2024-08-25 18:34:37","uploaded":"2024-08-25 18:41:10","revisionof":"S2-2408853","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5569.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-241256","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2409116.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409117","title":"Applying AMF determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify that: UE indicated values are final for SUECR reasons. AMF indicated values are final for Discontinuous coverage reasons.","secretary_remarks":"Revision of S2-2408855. Agreed in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11670,"status":"agreed","reservation_date":"2024-08-25 18:34:38","uploaded":"2024-08-25 18:41:10","revisionof":"S2-2408855","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5614.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-241256","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2409117.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409118","title":"Applying AMF determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify that: UE indicated values are final for SUECR reasons. AMF indicated values are final for Discontinuous coverage reasons.","secretary_remarks":"Revision of S2-2408856. Agreed in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11700,"status":"agreed","reservation_date":"2024-08-25 18:34:39","uploaded":"2024-08-25 18:41:10","revisionof":"S2-2408856","revisedto":"","release":"Rel-19","crspec":"23.501","crspecversion":"19.0.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5615.0,"crrevision":2.0,"crcategory":"A","tsg_crp":"SP-241256","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2409118.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2409119","title":"Applying AMF determined unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to clarify in above case the MME determined values are final to be used in the rest of the procedure","secretary_remarks":"Revision of S2-2408857. Agreed in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11730,"status":"agreed","reservation_date":"2024-08-25 18:34:39","uploaded":"2024-08-26 06:11:05","revisionof":"S2-2408857","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.6.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3814.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-241256","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_164_Maastricht_2024-08\/Docs\/S2-2409119.zip","group":"S2","meeting":"S2-164","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2","crsinpack":null,"crsinpacknumber":0}]