[{"name":"S2-2403876","title":"LS from CT WG1: LS on providing unavailability configuration during initial registration (attach) procedure","source":"CT WG1","contact":"Amer Catovic","contact-id":39766,"tdoctype":"LS in","for":"Action","abstract":"As part of the work on 5GSAT_Ph2, CT WG1 has specified the Unavailability information IE and the Unavailability configuration IE, which the UE and the network can use to negotiate the parameters related to the unavailability period, respectively (see TS 24.301 sc. 9.9.3.69 and 9.9.3.70). CT WG1 has decided to: - allow the network to provide the Unavailability configuration IE to the UE during the initial registration (attach) procedure. The rationale is that the network may have the information about the discontinuous coverage during initial registration while the UE cannot provide unavailability information, if any, to the network before receiving the indication of the support for the unavailability period in the network. This decision is reflected in the attached CRs to TS 24.301 and TS 24.501; and - make the unavailability type a mandatory field in the Unavailability information IE provided by the UE to the network in the registration and de-registration procedure. The rationale is that the NW needs to know whether or not it should determine the unavailability period duration and the start of the unavailability period based on the discontinuous coverage available in the network. This is reflected in the encoding of the Unavailability information IE in TS 24.301 sc. 9.9.3.69. Action: CT WG1 kindly asks SA WG2 to take the above into consideration and align their specifications accordingly.","secretary_remarks":"Responses drafted in S2-2404310, S2-2404584, S2-2404670, S2-2404803. Noted in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11620,"status":"noted","reservation_date":"2024-03-26 09:41:10","uploaded":"2024-03-26 18:43:10","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"","lsoriginalls":"C1-241849","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2403876.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404192","title":"Corrections on Estimated Maximum Wait Time for Discontinuous Coverage for Satellite Access","source":"NEC, Samsung","contact":"Zonghui Xie","contact-id":91945,"tdoctype":"CR","for":"Decision","abstract":"Summary of change: Add Downlink Buffering Duration time for exchange between MME and SGW. Change reference clauses for High latency communication and MME behavior of adjusting the mobile reachable timer and\/or Implicit Detach timer.","secretary_remarks":"Revised in parallel session to S2-2405065.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11930,"status":"revised","reservation_date":"2024-03-04 09:13:35","uploaded":"2024-04-04 08:29:48","revisionof":"","revisedto":"S2-2405065","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3771.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404192.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.3.17.7, 4.13.8.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404310","title":"[DRAFT] Reply LS on providing unavailability configuration during initial registration (attach) procedures","source":"OPPO","contact":"Peng Tan","contact-id":105814,"tdoctype":"LS out","for":"Approval","abstract":"To: CT WG1. TS 23.501 CR5397, TS 23.502 CR4804, TS 23.401 CR3772","secretary_remarks":"Response to S2-2403876 Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11880,"status":"not treated","reservation_date":"2024-04-04 05:12:05","uploaded":"2024-04-05 20:56:50","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404310.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404311","title":"Unavailability configuration during attach","source":"OPPO","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Amend clause 4.13.8.2 in TS 23.401 to include that the MME shall provide a Start of Unavailability Period and\/or Unavailability Period Duration to the UE. Amend clause 4.13.8.4 in TS 23.401 to include that MME shall store the determined Start of Unavailability Period and\/or Unavailability Period Duration. Amend clause 5.3.2.1 in TS 23.401 to include Unavailability Period Duration and Start of Unavailability Period in the Attach Accept message, along with the corresponding requirement for step 17.","secretary_remarks":"Revised in parallel session to S2-2405063.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11740,"status":"revised","reservation_date":"2024-04-04 05:12:05","uploaded":"2024-04-05 20:57:01","revisionof":"","revisedto":"S2-2405063","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3772.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404311.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2, 4.13.8.4, 5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404421","title":"Unavailability period during initial Registration procedure","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces support for AMF to provide Unavailability Period Duration and\/or the Start of Unavailability Period in Registration Accept message during the initial registration procedure","secretary_remarks":"Revised in parallel session to S2-2405062.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11630,"status":"revised","reservation_date":"2024-04-04 15:18:04","uploaded":"2024-04-05 17:08:56","revisionof":"","revisedto":"S2-2405062","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5372.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404421.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404429","title":"Unavailability type in UE-initiated de-registration","source":"MediaTek Inc.","contact":"Mehrdad Shariat","contact-id":97826,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In UE-initiated de-registration, the UE need to indicate the correct type of unavailability when providing the unavailability information to network.","secretary_remarks":"Postponed in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11670,"status":"postponed","reservation_date":"2024-04-04 15:27:48","uploaded":"2024-04-05 15:07:04","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5374.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404429.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":" 5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404430","title":"Unavailability period during initial Attach procedure","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces support for MME to provide Unavailability Period Duration and\/or the Start of Unavailability Period in Attach Accept message during the initial Attach procedure","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11780,"status":"not treated","reservation_date":"2024-04-04 15:35:12","uploaded":"2024-04-05 17:08:56","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3775.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404430.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404523","title":"Clarification on Discontinuous coverage for satellite access","source":"Google","contact":"Ellen C. Liao","contact-id":96126,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In order to enable this, introduce the following: Add service link and feeder link defintion based on TS38.300 Clarify the satellite coverage availability information provisioned to the UE or AMF via O&M describes when and where satellite coverage with service link and\/or feeder link availability is expected to be available in an area.","secretary_remarks":"Revised in parallel session to S2-2405066.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11960,"status":"revised","reservation_date":"2024-05-04 01:07:01","uploaded":"2024-04-05 21:20:23","revisionof":"","revisedto":"S2-2405066","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5379.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404523.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 5.4.13.2, 5.4.13.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404524","title":"Clarification on Discontinous coverage for satellite access","source":"Google","contact":"Ellen C. Liao","contact-id":96126,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In order to enable this, introduce the following: Add service link and feeder link defintion based on TS36.300 Clarify the satellite coverage availability information provisioned to the UE or AMF via O&M describes when and where satellite coverage with service link and\/or feeder link availability is expected to be available in an area.","secretary_remarks":"Revised in parallel session to S2-2405067.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11990,"status":"revised","reservation_date":"2024-05-04 01:09:25","uploaded":"2024-04-05 21:20:23","revisionof":"","revisedto":"S2-2405067","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3776.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404524.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 4.13.8.3, 4.13.8.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404584","title":"[DRAFT] LS Reply on providing unavailability configuration during initial registration (attach) procedure","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"LS out","for":"Approval","abstract":"To: CT WG1. Attachments: TS 23.501 CR#5382 (S2-2404585), TS 23.401 CR#3777 (S2-2404587), TS 23.501 CR#5141R2 (S2-2313511)","secretary_remarks":"Response to S2-2403876. Revised in parallel session to S2-2405064.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11890,"status":"revised","reservation_date":"2024-05-04 06:04:55","uploaded":"2024-04-05 12:15:39","revisionof":"","revisedto":"S2-2405064","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404584.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404585","title":"Unavailability Period provided by the AMF during initial registration","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The AMF may provide Unavailability Period Duration and\/or the Start of Unavailability Period known to the AMF during the initial registration procedure.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11790,"status":"not treated","reservation_date":"2024-05-04 06:06:46","uploaded":"2024-04-05 12:15:39","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5382.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404585.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":" 5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404587","title":"Unavailability Period provided by the MME during initial attach","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The MME may provide Unavailability Period Duration and\/or the Start of Unavailability Period known to the MME during the initial attach procedure.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11680,"status":"not treated","reservation_date":"2024-05-04 06:08:03","uploaded":"2024-04-05 12:15:39","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3777.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404587.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":" 4.13.8.2, 5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404618","title":"Handling when there is conflict in UE and network indicated Unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If both UE and AMF indicated unavailability period related configuration, the values indicated by the UE have to be used. AMF also uses the values indicated by the UE to determine the PTAU timer, power saving parameters. If UE has indicated but AMF has not indicated, then UE indicated values should be used by both UE and AMF. If AMF has indicated but UE has not indicted then AMF indicated values should be used. If UE indicted unavailability type but has not included both the values, the AMF assumes the time AMF receives the message as start of unavailability time.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11690,"status":"not treated","reservation_date":"2024-05-04 08:09:02","uploaded":"2024-04-05 08:22:15","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5384.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404618.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404621","title":"Handling when there is conflict in UE and network indicated Unavailability values","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: If both UE and MME indicated unavailability period related configuration are different, the values indicated by the UE have to be used. MME also uses the values indicated by the UE to determine the PTAU timer, power saving parameters. If UE has indicated but MME has not indicated, then UE indicated values should be used by both UE and MME. If MME has indicated but UE has not indicted then MME indicated values should be used. If UE indicted unavailability type but has not included both the values, the MME assumes the time MME receives the message as start of unavailability time.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11800,"status":"not treated","reservation_date":"2024-05-04 08:13:06","uploaded":"2024-04-05 08:22:15","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3778.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404621.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404670","title":"[DRAFT] Reply LS to LS on providing unavailability configuration during initial registration (attach)","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"LS out","for":"Approval","abstract":"Reply to CT WG1 about unavailability type in 5GS and EPS.","secretary_remarks":"Response to S2-2403876 Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11910,"status":"not treated","reservation_date":"2024-05-04 09:16:23","uploaded":"2024-04-05 13:57:53","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404670.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404671","title":"Alignment with CT WG1 to support Unavailability Period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add descriptions that the AMF may provide Start of the Unavailability Period and Unavailability Period Duration to UE during initial registration procedure.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11700,"status":"not treated","reservation_date":"2024-05-04 09:16:23","uploaded":"2024-04-05 13:57:53","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5387.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404671.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404672","title":"Alignment with CT WG1 to support Unavailability Period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Add description that the AMF may provide Start of the Unavailability Period and Unavailability Period Duration to UE during initial registration procedure. 2. Clarification on AMF behaviour when receiving Unavailability Period Duration and\/or Start of Unavailability Period from UE. 3. Editorial change.","secretary_remarks":"Revised in parallel session to S2-2405317.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11830,"status":"revised","reservation_date":"2024-05-04 09:16:24","uploaded":"2024-04-05 13:57:53","revisionof":"","revisedto":"S2-2405317","release":"Rel-18","crspec":"23.502","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":4798.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404672.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404673","title":"Alignment with CT WG1 to support Unavailability Period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the MME may provide Start of the Unavailability Period and Unavailability Period Duration to UE during Attach procedure.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11810,"status":"not treated","reservation_date":"2024-05-04 09:16:25","uploaded":"2024-04-05 13:57:53","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3780.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404673.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2, 5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404690","title":"Providing unavailability type during the de-registration procedure","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align the unavailability type description with the CT WG1.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11710,"status":"not treated","reservation_date":"2024-05-04 09:41:57","uploaded":"2024-04-05 10:20:26","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5389.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404690.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404691","title":"Update the unavailability type description for the satellite discontinuous coverage","source":"CATT","contact":"Yingying Liu","contact-id":94862,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Align the unavailability type description with the CT WG1.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11860,"status":"not treated","reservation_date":"2024-05-04 09:41:58","uploaded":"2024-04-05 10:20:26","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.502","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":4801.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404691.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2, 4.2.2.3.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404788","title":"Applicability of unavailability period during initial registration procedure","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The AMF can indicate Unavailability Period Duration and\/or the Start of Unavailability Period to the UE in initial registration accept or UCU message.","secretary_remarks":"Merged into S2-2405362","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11720,"status":"merged","reservation_date":"2024-05-04 12:04:27","uploaded":"2024-04-05 12:25:06","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5392.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404788.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404789","title":"Applicability of unavailability period during Attach procedure","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The MME can indicate Unavailability Period Duration and\/or the Start of Unavailability Period to the UE in Attach accept.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11820,"status":"not treated","reservation_date":"2024-05-04 12:08:29","uploaded":"2024-04-05 12:25:06","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3781.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404789.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404803","title":"[DRAFT] Reply LS on providing unavailability configuration during initial registration (attach) procedure","source":"Samsung","contact":"Lalith Kumar","contact-id":80547,"tdoctype":"LS out","for":"Approval","abstract":"To: CT WG1. Attachments: CR# 5392 and CR#3781","secretary_remarks":"Response to S2-2403876 Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11920,"status":"not treated","reservation_date":"2024-05-04 12:42:04","uploaded":"2024-04-05 12:45:21","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404803.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404968","title":"Handling of unavailability period in the initial registration procedure","source":"OPPO","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: TS 23.502 is amended to include the scenario in step 21. If the UE has not provided Unavailability Period Duration and\/or Start of Unavailability Period in step 1, and the AMF can determine a UE Unavailability Period Duration and\/or Start of Unavailability Period based on satellite coverage availability information, the AMF shall store the Unavailability Period Duration and\/or Start of Unavailability Period and provide them to the UE.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11870,"status":"not treated","reservation_date":"2024-05-04 19:26:27","uploaded":"2024-04-05 20:57:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.502","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":4804.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404968.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2404969","title":"Handling of unavailability period in the initial registration procedure","source":"OPPO","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: TS 23.501 is amended in clauses 5.4.1.4, 5.4.13.1 and 5.4.13.3 to include that AMF shall provide Start of Unavailability Period and\/or Unavailability Period Duration to the UE.","secretary_remarks":"Not Handled","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11730,"status":"not treated","reservation_date":"2024-05-04 19:29:53","uploaded":"2024-04-05 20:57:23","revisionof":"","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5397.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2404969.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4, 5.4.13.1, 5.4.13.3 ","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405062","title":"Unavailability period during initial Registration procedure","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces support for AMF to provide Unavailability Period Duration and\/or the Start of Unavailability Period in Registration Accept message during the initial registration procedure","secretary_remarks":"Revision of S2-2404421. Revised in parallel session to S2-2405362, merging S2-2404788","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11640,"status":"revised","reservation_date":"2024-04-22 09:36:47","uploaded":"2024-04-22 10:01:24","revisionof":"S2-2404421","revisedto":"S2-2405362","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5372.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405062.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405063","title":"Unavailability configuration during attach","source":"OPPO","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Amend clause 4.13.8.2 in TS 23.401 to include that the MME shall provide a Start of Unavailability Period and\/or Unavailability Period Duration to the UE. Amend clause 4.13.8.4 in TS 23.401 to include that MME shall store the determined","secretary_remarks":"Revision of S2-2404311. Revised in parallel session to S2-2405363","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11750,"status":"revised","reservation_date":"2024-04-22 09:36:49","uploaded":"2024-04-22 10:01:24","revisionof":"S2-2404311","revisedto":"S2-2405363","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3772.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405063.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405064","title":"[DRAFT] LS Reply on providing unavailability configuration during initial registration (attach) procedure","source":"LG Electronics","contact":"Jaewoo Kim","contact-id":92249,"tdoctype":"LS out","for":"Approval","abstract":"To: CT WG1. Attachments: TS 23.501 CR#5382 (S2-2404585), TS 23.401 CR#3777 (S2-2404587), TS 23.501 CR#5141R2 (S2-2313511)","secretary_remarks":"Revision of S2-2404584. Noted in parallel session","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11900,"status":"noted","reservation_date":"2024-04-22 09:36:50","uploaded":"2024-04-22 10:01:20","revisionof":"S2-2404584","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT WG1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405064.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405065","title":"Corrections on Estimated Maximum Wait Time for Discontinuous Coverage for Satellite Access","source":"NEC, Samsung","contact":"Zonghui Xie","contact-id":91945,"tdoctype":"CR","for":"Decision","abstract":"Summary of change: Correct the name of indication from Estimated Maximum Wait Time to Downlink Buffering Duration time . Change reference clauses for High latency communication and MME behavior of adjusting the mobile reachable timer and\/or Implicit Detac","secretary_remarks":"Revision of S2-2404192. Revised in parallel session to S2-2405617.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11940,"status":"revised","reservation_date":"2024-04-22 09:36:50","uploaded":"2024-04-22 10:01:24","revisionof":"S2-2404192","revisedto":"S2-2405617","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3771.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405065.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405066","title":"Clarification on Discontinuous coverage for satellite access","source":"Google, Tencent, DISH Network, Samsung","contact":"Ellen C. Liao","contact-id":96126,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In order to enable this, introduce the following: Add service link and feeder link defintion based on TS38.300 Clarify the satellite coverage availability information provisioned to the UE or AMF via O&M describes when and where satelli","secretary_remarks":"Revision of S2-2404523. Revised in parallel session to S2-2405618.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11970,"status":"revised","reservation_date":"2024-04-22 09:36:51","uploaded":"2024-04-22 10:01:24","revisionof":"S2-2404523","revisedto":"S2-2405618","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5379.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405066.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 5.4.13.2, 5.4.13.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405067","title":"Clarification on Discontinous coverage for satellite access","source":"Google, Tencent, DISH Network","contact":"Ellen C. Liao","contact-id":96126,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In order to enable this, introduce the following: Add service link and feeder link defintion based on TS36.300 Clarify the satellite coverage availability information provisioned to the UE or AMF via O&M describes when and where satelli","secretary_remarks":"Revision of S2-2404524. Revised in parallel session to S2-2405619.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":12000,"status":"revised","reservation_date":"2024-04-22 09:36:52","uploaded":"2024-04-22 10:01:24","revisionof":"S2-2404524","revisedto":"S2-2405619","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3776.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405067.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 4.13.8.3, 4.13.8.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405317","title":"Alignment with CT WG1 to support Unavailability Period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Add description that the AMF may provide Start of the Unavailability Period and Unavailability Period Duration to UE during initial registration procedure. 2. Clarification on AMF behaviour when receiving Unavailability Period Durati","secretary_remarks":"Revision of S2-2404672. Revised in parallel session to S2-2405364.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11840,"status":"revised","reservation_date":"2024-04-22 09:39:04","uploaded":"2024-04-22 10:01:22","revisionof":"S2-2404672","revisedto":"S2-2405364","release":"Rel-18","crspec":"23.502","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":4798.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405317.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405362","title":"Unavailability period during initial Registration procedure","source":"Qualcomm Incorporated, Samsung","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces support for AMF to provide Unavailability Period Duration and\/or the Start of Unavailability Period in Registration Accept message during the initial registration procedure","secretary_remarks":"Revision of S2-2405062, merging S2-2404788. Revised in parallel session to S2-2405615.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11650,"status":"revised","reservation_date":"2024-04-22 09:39:19","uploaded":"2024-04-22 10:01:22","revisionof":"S2-2405062","revisedto":"S2-2405615","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5372.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405362.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"5.4.1.4","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405363","title":"Unavailability configuration during attach","source":"OPPO, Samsung","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Amend clause 4.13.8.2 in TS 23.401 to include that the MME shall provide a Start of Unavailability Period and\/or Unavailability Period Duration to the UE. Amend clause 5.3.2.1 in TS 23.401 to include Unavailability Period Duration and S","secretary_remarks":"Revision of S2-2405063. Revised in parallel session to S2-2405616.","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11760,"status":"revised","reservation_date":"2024-04-22 09:39:20","uploaded":"2024-04-22 10:01:22","revisionof":"S2-2405063","revisedto":"S2-2405616","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3772.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405363.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":false,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2, 5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405364","title":"Alignment with CT WG1 to support Unavailability Period","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Add description that the AMF may provide Start of the Unavailability Period and Unavailability Period Duration to UE during initial registration procedure. 2. Clarification on AMF behaviour when receiving Unavailability Period Durati","secretary_remarks":"Revision of S2-2405317. Agreed in parallel session. Block approved","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11850,"status":"agreed","reservation_date":"2024-04-22 09:39:21","uploaded":"2024-04-22 10:01:19","revisionof":"S2-2405317","revisedto":"","release":"Rel-18","crspec":"23.502","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":4798.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-240589","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405364.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.2.2.2.2","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405615","title":"Unavailability period during initial Registration procedure","source":"Qualcomm Incorporated, Samsung","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces support for AMF to provide Unavailability Period Duration and\/or the Start of Unavailability Period in Registration Accept message during the initial registration procedure","secretary_remarks":"Revision of S2-2405362. Agreed in parallel session. Block approved","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11660,"status":"agreed","reservation_date":"2024-04-22 09:41:29","uploaded":"2024-04-22 10:01:19","revisionof":"S2-2405362","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5372.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-240589","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405615.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405616","title":"Unavailability configuration during attach","source":"OPPO, Samsung, LG Electronics","contact":"Peng Tan","contact-id":105814,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Amend clause 4.13.8.2 in TS 23.401 to include that the MME shall provide a Start of Unavailability Period and\/or Unavailability Period Duration to the UE. Amend clause 5.3.2.1 in TS 23.401 to include Unavailability Period Duration and S","secretary_remarks":"Revision of S2-2405363. Agreed in parallel session. Block approved","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11770,"status":"agreed","reservation_date":"2024-04-22 09:41:30","uploaded":"2024-04-22 10:01:19","revisionof":"S2-2405363","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3772.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-240589","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405616.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"4.13.8.2, 5.3.2.1","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405617","title":"Corrections on Estimated Maximum Wait Time for Discontinuous Coverage for Satellite Access","source":"NEC, Samsung","contact":"Zonghui Xie","contact-id":91945,"tdoctype":"CR","for":"Decision","abstract":"Summary of change: Correct the name of indication from Estimated Maximum Wait Time to Downlink Buffering Duration time . Change reference clauses for High latency communication and MME behavior of adjusting the mobile reachable timer and\/or Implicit Detac","secretary_remarks":"Revision of S2-2405065. Agreed in parallel session. Block approved","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11950,"status":"agreed","reservation_date":"2024-04-22 09:41:31","uploaded":"2024-04-22 10:01:19","revisionof":"S2-2405065","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3771.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-240589","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405617.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405618","title":"Clarification on Discontinuous coverage for satellite access","source":"Google, Tencent, DISH Network, Samsung","contact":"Ellen C. Liao","contact-id":96126,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In order to enable this, introduce the following: Add service link and feeder link defintion based on TS38.300 Clarify the satellite coverage availability information provisioned to the UE or AMF via O&M describes when and where satelli","secretary_remarks":"Revision of S2-2405066. Agreed in parallel session. Block approved","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":11980,"status":"agreed","reservation_date":"2024-04-22 09:41:32","uploaded":"2024-04-22 10:01:19","revisionof":"S2-2405066","revisedto":"","release":"Rel-18","crspec":"23.501","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":5379.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-240589","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405618.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 5.4.13.2, 5.4.13.3","crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2405619","title":"Clarification on Discontinous coverage for satellite access","source":"Google, Tencent, DISH Network, Samsung","contact":"Ellen C. Liao","contact-id":96126,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In order to enable this, introduce the following: Add service link and feeder link defintion based on TS36.300 Clarify the satellite coverage availability information provisioned to the UE or AMF via O&M describes when and where satelli","secretary_remarks":"Revision of S2-2405067. Agreed in parallel session. Block approved","agenda_item_sort_order":74,"ainumber":"9.2.2","ainame":"Satellite access Phase 2 (5GSAT_Ph2)","tdoc_agenda_sort_order":12010,"status":"agreed","reservation_date":"2024-04-22 09:41:33","uploaded":"2024-04-22 10:01:19","revisionof":"S2-2405067","revisedto":"","release":"Rel-18","crspec":"23.401","crspecversion":"18.5.0","workitem":[{"winame":"5GSAT_Ph2"}],"crnumber":3776.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-240589","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_162_Changsha_2024-04\/Docs\/S2-2405619.zip","group":"S2","meeting":"S2-162","year":2024,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":true,"clauses_affected":"3.1, 4.13.8.3, 4.13.8.4","crsinpack":null,"crsinpacknumber":0}]