[{"name":"S2-1908875","title":"FS_eV2XARC_Ph2 Work Tasks","source":"LG Electronics (Rapporteur)","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"Work Plan","for":"Approval","abstract":"This paper proposes the break-down of objectives of FS_eV2XARC_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"e-mail revision 1 approved. Revised to S2-1910833","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30270,"status":"revised","reservation_date":"2019-09-30 02:08:31","uploaded":"2019-10-04 08:22:49","revisionof":"","revisedto":"S2-1909979, S2-1910833","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908875.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908877","title":"Discussion on Optimization for IMS voice service over LTE and NR","source":"Huawei, HiSilicon","contact":"Shufeng Shi","contact-id":56675,"tdoctype":"discussion","for":"Decision","abstract":"Address several issues on optimization for the IMS voice\/video over LTE and NR.","secretary_remarks":"Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30550,"status":"not treated","reservation_date":"2019-09-30 03:19:30","uploaded":"2019-10-02 23:55:04","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908877.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908878","title":"Optimization of EPS fallback","source":"Huawei, HiSilicon","contact":"Shufeng Shi","contact-id":56675,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add one more step 2a to indicate that the IMS can continue the subsequent procedure, which will proceed with step 2 in parallel. Add a note to clarify that the IMS needs to retrieve the UE location information, if not available yet, before continuing the subsequent procedure, in order to support some location based service in IMS, e.g. Call Barring, Charging, and so on,","secretary_remarks":"WI Code needs specifying. TEI16, or Rel-17? Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30560,"status":"not treated","reservation_date":"2019-09-30 03:19:30","uploaded":"2019-10-02 23:55:04","revisionof":"","revisedto":"S2-1911253","release":"Rel-16","crspec":"23.502","crspecversion":"16.2.0","workitem":[{"winame":"TEI17"}],"crnumber":1688.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908878.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908879","title":"Optimization on QoS Flow related procedures","source":"Huawei, HiSilicon","contact":"Shufeng Shi","contact-id":56675,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Acceptable QoS parameters is provided by the RAN together with the rejected QFI(s) during PDU Session Establishment\/Modification procedure.","secretary_remarks":"WI Code needs specifying. Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30570,"status":"not treated","reservation_date":"2019-09-30 03:19:34","uploaded":"2019-10-02 23:55:04","revisionof":"","revisedto":"S2-1911254","release":"Rel-16","crspec":"23.502","crspecversion":"16.2.0","workitem":[{"winame":"TEI17"}],"crnumber":1689.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908879.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908880","title":"Optimization on QoS Flow setup and modification","source":"Huawei, HiSilicon","contact":"Shufeng Shi","contact-id":56675,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Acceptable QoS parameters is provided within the outcome of the PCC rule operation from the SMF to the PCF, and then to the AF.","secretary_remarks":"WI Code needs specifying. Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30580,"status":"not treated","reservation_date":"2019-09-30 03:19:36","uploaded":"2019-10-02 23:55:04","revisionof":"","revisedto":"S2-1911255","release":"Rel-16","crspec":"23.503","crspecversion":"16.2.0","workitem":[{"winame":"TEI17"}],"crnumber":319.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908880.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908881","title":"Support for Qos Notification Control in EPC","source":"Huawei, HiSilicon","contact":"Shufeng Shi","contact-id":56675,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: QoS notification Control is introduced in EPC, thus the QoS Notification can be subscribed by the PCRF\/AF for further decision.","secretary_remarks":"WI Code needs specifying. Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30590,"status":"not treated","reservation_date":"2019-09-30 03:19:37","uploaded":"2019-10-02 23:55:04","revisionof":"","revisedto":"S2-1911256","release":"Rel-16","crspec":"23.203","crspecversion":"16.1.0","workitem":[{"winame":"TEI17"}],"crnumber":1129.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908881.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908882","title":"Support for Qos Notification Control in EPC","source":"Huawei, HiSilicon","contact":"Shufeng Shi","contact-id":56675,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: QoS notification Control is introduced in EPC: QNC is included within bearer level QoS parameters, and Functional description of QoS Notification.","secretary_remarks":"WI Code needs specifying. Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30600,"status":"not treated","reservation_date":"2019-09-30 03:19:38","uploaded":"2019-10-02 23:55:04","revisionof":"","revisedto":"S2-1911257","release":"Rel-16","crspec":"23.401","crspecversion":"16.4.0","workitem":[{"winame":"TEI17"}],"crnumber":3540.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908882.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908912","title":"Rel-17 FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to S2-1910384.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30300,"status":"revised","reservation_date":"2019-09-30 06:05:55","uploaded":"2019-10-04 02:44:19","revisionof":"","revisedto":"S2-1910384","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908912.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908964","title":"5G_AIS Work Task","source":"Tencent (Rapporteur)","contact":"Yixue Lei","contact-id":78221,"tdoctype":"Work Plan","for":"Agreement","abstract":"Work Task and TU estimation for 5G_AIS","secretary_remarks":"e-mail revision 1 approved. Revised to S2-1910832","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30480,"status":"revised","reservation_date":"2019-09-30 09:53:47","uploaded":"2019-10-04 12:13:17","revisionof":"","revisedto":"S2-1910832","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"5G_AIS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908964.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908994","title":"FS_5WWC_Ph2 Work Tasks","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Approval","abstract":"It proposes WT and TU estimation for FS_5WWC_Ph2.","secretary_remarks":"Revised to S2-1910541.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30520,"status":"revised","reservation_date":"2019-09-30 12:28:20","uploaded":"2019-10-04 08:58:09","revisionof":"","revisedto":"S2-1910541","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908994.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909124","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"Work Plan","for":"Decision","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task","secretary_remarks":"Revised to S2-1909827","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30330,"status":"revised","reservation_date":"2019-10-01 16:08:37","uploaded":"2019-10-04 11:26:11","revisionof":"","revisedto":"S2-1909827","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909124.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909245","title":"Study on supporting Unmanned Aerial Systems Connectivity, Identification, and Tracking","source":"China Unicom","contact":"Chi Ren","contact-id":72309,"tdoctype":"SID revised","for":"Approval","abstract":"This paper proposes to update the SID of FS_ID_UAS with the requirement of SA1 EAV added.","secretary_remarks":"Revision of TSG SA SID: SP-181114. Revised to S2-1909973.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30090,"status":"revised","reservation_date":"2019-10-02 10:53:16","uploaded":"2019-10-04 11:05:14","revisionof":"SP-181114","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_ID_UAS_SA2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909245.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909532","title":"5GLAN_enh Work Tasks","source":"Huawei (Rapporteur)","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Discussion","abstract":"Work Tasks","secretary_remarks":"Revised to S2-1910537.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30370,"status":"revised","reservation_date":"2019-10-03 15:33:12","uploaded":"2019-10-04 16:22:34","revisionof":"","revisedto":"S2-1910537","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GLAN_enh"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909532.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909552","title":"TSN integration - fully distributed configuration model for flexible manufacturing use case","source":"Siemens, Daimler, BMWi, Volkswagen, Sennheiser, Fraunhofer HHI","contact":"Xi Zhang","contact-id":79256,"tdoctype":"discussion","for":"Agreement","abstract":"This discussion paper proposes to add the support for fully distributed configuration model for time sensitive communication in the IIoT work stream in release 17.","secretary_remarks":"Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30230,"status":"not treated","reservation_date":"2019-10-03 18:11:41","uploaded":"2019-10-04 19:42:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_IIoT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/s2-1909552.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909568","title":"FS_MPS2_St2 Work Tasks","source":"Perspecta Labs (Rapporteur)","contact":"Don Lukacs","contact-id":79989,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_MPS2_St2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to S2-1910538.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30400,"status":"revised","reservation_date":"2019-10-03 19:38:33","uploaded":"2019-10-04 20:38:21","revisionof":"","revisedto":"S2-1910538","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_MPS2_St2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909568.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909574","title":"FS_MPS2_St2 Scope","source":"Perspecta Labs, CISA ECD, AT&T, Sprint, T-Mobile USA, Verizon","contact":"Don Lukacs","contact-id":79989,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes a way forward to optimize the efforts in stage 2 and estimates the TUs required for FS_MPS2_St2.","secretary_remarks":"Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30430,"status":"not treated","reservation_date":"2019-10-03 19:47:14","uploaded":"2019-10-04 20:38:21","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_MPS2_St2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909574.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909610","title":"FS_eATSSS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_eATSSS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to S2-1910500.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30440,"status":"revised","reservation_date":"2019-10-03 23:14:17","uploaded":"2019-10-04 21:09:36","revisionof":"","revisedto":"S2-1910500","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909610.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909807","title":"Revised SID: Study on System enhancement for Proximity based Services in 5GS","source":"KPN, AT&T, MediaTek Inc., Convida Wireless, Novamint","contact":"Toni Dimitrovski","contact-id":66437,"tdoctype":"SID revised","for":"Approval","abstract":"Updates the SID to include SA WG1 REFEC related requirements from TS 22.261.","secretary_remarks":"Revision of TSG SA approved SID in SP-190443. Revised in parallel session to S2-1909974.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30120,"status":"revised","reservation_date":"2019-10-04 13:03:51","uploaded":"2019-10-04 16:07:26","revisionof":"SP-190443","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5G_ProSe"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909807.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909819","title":"Revised SID: Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2","source":"Qualcomm Incorporated, LG Electronics","contact":"Hong Cheng","contact-id":25668,"tdoctype":"SID revised","for":"Approval","abstract":"Propose additional objectives for the study according to service requirements on V2X.","secretary_remarks":"Revised to S2-1909975.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30150,"status":"revised","reservation_date":"2019-10-04 14:02:35","uploaded":"2019-10-04 19:13:05","revisionof":"","revisedto":"S2-1909975","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909819.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909827","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"Work Plan","for":"Decision","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task","secretary_remarks":"Revision of S2-1909124. Revised to S2-1910536.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30340,"status":"revised","reservation_date":"2019-10-04 14:43:00","uploaded":"2019-10-04 14:49:11","revisionof":"S2-1909124","revisedto":"S2-1910536","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909827.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909844","title":"Revised SID: Study on enhancement of support for 5G LAN-type service","source":"Nokia, Nokia Shanghai Bell","contact":"Laurent Thiebaut","contact-id":68713,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID: Study on enhancement of support for 5G LAN-type service","secretary_remarks":"Revised to S2-1909976.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30180,"status":"revised","reservation_date":"2019-10-04 15:26:33","uploaded":"2019-10-04 16:49:59","revisionof":"","revisedto":"S2-1909976","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GLAN_enh"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909844.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909845","title":"Revised SID: Study on enhancement of support for Edge Computing in 5GC","source":"Nokia, Nokia Shanghai Bell","contact":"Laurent Thiebaut","contact-id":68713,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID: Study on enhancement of support for Edge Computing in 5GC","secretary_remarks":"Revised to S2-1909977.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30210,"status":"revised","reservation_date":"2019-10-04 15:26:33","uploaded":"2019-10-04 16:49:59","revisionof":"","revisedto":"S2-1909977","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_enh_EC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909845.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909867","title":"FS_ID_UAS-SA2 Work Tasks","source":"Qualcomm (Rapporteur)","contact":"Stefano Faccin","contact-id":57487,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_ID_UAS-SA2 ('Study on supporting Unmanned Aerial Systems Connectivity, Identification, and Tracking') into a set of Work Tasks with granular TU estimate per Work Task","secretary_remarks":"Revised to S2-1910540.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30500,"status":"revised","reservation_date":"2019-10-04 16:38:14","uploaded":"2019-10-04 19:43:31","revisionof":"","revisedto":"S2-1910540","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909867.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909880","title":"New option of sending IP address pools from UDM","source":"Verizon, Ericsson, Nokia, Oracle","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"other","for":"Agreement","abstract":"This contribution discusses the reasons to send IP address pools (IPindex) to SMF from UDM also.","secretary_remarks":"Not Handled","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30610,"status":"not treated","reservation_date":"2019-10-04 17:22:08","uploaded":"2019-10-04 17:33:08","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"TEI17"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909880.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909899","title":"ProSe communication for cyber-physical control application","source":"Siemens AG","contact":"Xi Zhang","contact-id":79256,"tdoctype":"discussion","for":"Discussion","abstract":"This paper proposes to add ProSe communication support for cyber-physical control applications per requirements stated in TS 22.104 in the FS_5G_ProSe work stream.","secretary_remarks":"Noted","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30110,"status":"noted","reservation_date":"2019-10-04 18:33:07","uploaded":"2019-10-04 19:42:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5G_ProSe"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/s2-1909899.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909918","title":"Revised SID: Study on enhanced support of Industrial IoT - TSC\/URLLC enhancements","source":"Siemens AG, Fraunhofer HHI, Daimler, Volkswagen AG","contact":"Xi Zhang","contact-id":79256,"tdoctype":"SID revised","for":"Approval","abstract":"Adding support of fully distributed configuration model for TSN integration as one of the objectives for this SID","secretary_remarks":"Revision of TSG SA SID in SP-190932. Revised to S2-1909978.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30240,"status":"revised","reservation_date":"2019-10-04 18:54:13","uploaded":"2019-10-04 19:42:11","revisionof":"SP-190932","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_IIoT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909918.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909973","title":"Study on supporting Unmanned Aerial Systems Connectivity, Identification, and Tracking","source":"China Unicom","contact":"Chi Ren","contact-id":72309,"tdoctype":"SID revised","for":"Approval","abstract":"This paper proposes to update the SID of FS_ID_UAS with the requirement of SA1 EAV added.","secretary_remarks":"Revision of S2-1909245. WITHDRAWN","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30100,"status":"withdrawn","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"SP-181114","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_ID_UAS_SA2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909973.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909974","title":"Revised SID: Study on System enhancement for Proximity based Services in 5GS","source":"KPN, AT&T, MediaTek Inc., Convida Wireless, Novamint","contact":"Toni Dimitrovski","contact-id":66437,"tdoctype":"SID revised","for":"Approval","abstract":"Updates the SID to include SA WG1 REFEC related requirements from TS 22.261.","secretary_remarks":"Revision of S2-1909807. Revised to S2-1910753.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30130,"status":"revised","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"SP-190443","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5G_ProSe"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909974.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909975","title":"Revised SID: Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2","source":"Qualcomm Incorporated, LG Electronics","contact":"Hong Cheng","contact-id":25668,"tdoctype":"SID revised","for":"Approval","abstract":"Propose additional objectives for the study according to service requirements on V2X.","secretary_remarks":"Revision of S2-1909819. Revised to S2-1910754.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30160,"status":"revised","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"S2-1909819","revisedto":"S2-1910754","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909975.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909976","title":"Revised SID: Study on enhancement of support for 5G LAN-type service","source":"Nokia, Nokia Shanghai Bell","contact":"Laurent Thiebaut","contact-id":68713,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID: Study on enhancement of support for 5G LAN-type service","secretary_remarks":"Revision of S2-1909844. Revised to S2-1910755.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30190,"status":"revised","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"S2-1909844","revisedto":"S2-1910755","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GLAN_enh"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909976.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909977","title":"Revised SID: Study on enhancement of support for Edge Computing in 5GC","source":"Nokia, Nokia Shanghai Bell","contact":"Laurent Thiebaut","contact-id":68713,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID: Study on enhancement of support for Edge Computing in 5GC","secretary_remarks":"Revision of S2-1909845. 4 company objections. Noted","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30220,"status":"noted","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"S2-1909845","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_enh_EC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909977.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909978","title":"Revised SID: Study on enhanced support of Industrial IoT - TSC\/URLLC enhancements","source":"Siemens AG, Fraunhofer HHI, Daimler AG, Volkswagen AG","contact":"Xi Zhang","contact-id":79256,"tdoctype":"SID revised","for":"Approval","abstract":"Adding support of fully distributed configuration model for TSN integration as one of the objectives for this SID","secretary_remarks":"Revision of S2-1909918. Revised to S2-1910756.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30250,"status":"revised","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"SP-190932","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_IIoT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909978.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909979","title":"FS_eV2XARC_Ph2 Work Tasks","source":"LG Electronics (Rapporteur)","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"Work Plan","for":"Approval","abstract":"This paper proposes the break-down of objectives of FS_eV2XARC_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of S2-1908875. This was left for e-mail approval. S2-1909979 can't be considered, so the previous version should be used (S2-1908875). Noted","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30290,"status":"noted","reservation_date":"2019-10-15 06:40:05","uploaded":"2019-10-19 07:48:01","revisionof":"S2-1908875","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909979.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910384","title":"Rel-17 FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of S2-1908912. This was left for e-mail approval. e-mail revision 4 approved. Revised to S2-1910834","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30310,"status":"revised","reservation_date":"2019-10-15 06:41:29","uploaded":"2019-10-19 07:48:02","revisionof":"S2-1908912","revisedto":"S2-1910834","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910384.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910500","title":"FS_eATSSS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_eATSSS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of S2-1909610. Revised to S2-1910539.","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30450,"status":"revised","reservation_date":"2019-10-19 05:41:27","uploaded":"2019-10-19 07:48:13","revisionof":"S2-1909610","revisedto":"S2-1910539","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910500.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910536","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"Work Plan","for":"Decision","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task","secretary_remarks":"Revision of S2-1909827. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-1910838","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30350,"status":"revised","reservation_date":"2019-10-19 05:41:33","uploaded":"2019-10-19 07:48:13","revisionof":"S2-1909827","revisedto":"S2-1910838","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910536.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910537","title":"5GLAN_enh Work Tasks","source":"Huawei (Rapporteur)","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Discussion","abstract":"Work Tasks","secretary_remarks":"Revision of S2-1909532. This was left for e-mail approval. e-mail revision 5 approved. Revised to S2-1910839","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30380,"status":"revised","reservation_date":"2019-10-19 05:41:33","uploaded":"2019-10-19 07:48:13","revisionof":"S2-1909532","revisedto":"S2-1910839","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GLAN_enh"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910537.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910538","title":"FS_MPS2_St2 Work Tasks","source":"Perspecta Labs (Rapporteur)","contact":"Don Lukacs","contact-id":79989,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_MPS2_St2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of S2-1909568. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-1910840","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30410,"status":"revised","reservation_date":"2019-10-19 05:41:33","uploaded":"2019-10-19 07:48:13","revisionof":"S2-1909568","revisedto":"S2-1910840","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_MPS2_St2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910538.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910539","title":"FS_eATSSS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_eATSSS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of S2-1910500. This was left for e-mail approval. e-mail revision 6 approved. Revised to S2-1910841","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30460,"status":"revised","reservation_date":"2019-10-19 05:41:34","uploaded":"2019-10-21 08:38:02","revisionof":"S2-1910500","revisedto":"S2-1910841","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910539.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910540","title":"FS_ID_UAS-SA2 Work Tasks","source":"Qualcomm (Rapporteur)","contact":"Stefano Faccin","contact-id":57487,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_ID_UAS-SA2 ('Study on supporting Unmanned Aerial Systems Connectivity, Identification, and Tracking') into a set of Work Tasks with granular TU estimate per Work Task","secretary_remarks":"Revision of S2-1909867. This was left for e-mail approval. Approved. Revised at S2#136 in S2-1911634","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30510,"status":"revised","reservation_date":"2019-10-19 05:41:35","uploaded":"2019-10-22 05:28:06","revisionof":"S2-1909867","revisedto":"S2-1911634","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_ID_UAS_SA2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910540.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910541","title":"FS_5WWC_Ph2 Work Tasks","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Approval","abstract":"It proposes WT and TU estimation for FS_5WWC_Ph2.","secretary_remarks":"Revision of S2-1908994. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-1910842","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30530,"status":"revised","reservation_date":"2019-10-19 05:41:35","uploaded":"2019-10-19 07:48:13","revisionof":"S2-1908994","revisedto":"S2-1910842","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910541.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910753","title":"Revised SID: Study on System enhancement for Proximity based Services in 5GS","source":"KPN, AT&T, MediaTek Inc., Convida Wireless, Novamint","contact":"Toni Dimitrovski","contact-id":66437,"tdoctype":"SID revised","for":"Approval","abstract":"Updates the SID to include SA WG1 REFEC related requirements from TS 22.261.","secretary_remarks":"Revision of S2-1909974. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30140,"status":"approved","reservation_date":"2019-10-19 05:43:58","uploaded":"2019-10-19 07:48:17","revisionof":"SP-190443","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5G_ProSe"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910753.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910754","title":"Revised SID: Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2","source":"Qualcomm Incorporated, LG Electronics","contact":"Hong Cheng","contact-id":25668,"tdoctype":"SID revised","for":"Approval","abstract":"Propose additional objectives for the study according to service requirements on V2X.","secretary_remarks":"Revision of S2-1909975. This was left for e-mail approval. Noted","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30170,"status":"noted","reservation_date":"2019-10-19 05:43:58","uploaded":"2019-10-19 07:48:17","revisionof":"S2-1909975","revisedto":"S2-1911926","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910754.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910755","title":"Revised SID: Study on enhancement of support for 5G LAN-type service","source":"Nokia, Nokia Shanghai Bell","contact":"Laurent Thiebaut","contact-id":68713,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID: Study on enhancement of support for 5G LAN-type service","secretary_remarks":"Revision of S2-1909976. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30200,"status":"approved","reservation_date":"2019-10-19 05:44:00","uploaded":"2019-10-19 07:48:17","revisionof":"S2-1909976","revisedto":"S2-1911599","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GLAN_enh"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910755.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910756","title":"Revised SID: Study on enhanced support of Industrial IoT - TSC\/URLLC enhancements","source":"Siemens AG, Fraunhofer HHI, Daimler AG, Volkswagen AG","contact":"Xi Zhang","contact-id":79256,"tdoctype":"SID revised","for":"Approval","abstract":"Adding support of fully distributed configuration model for TSN integration as one of the objectives for this SID","secretary_remarks":"Revision of S2-1909978. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30260,"status":"approved","reservation_date":"2019-10-19 05:44:03","uploaded":"2019-10-19 07:48:17","revisionof":"SP-190932","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_IIoT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910756.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910832","title":"5G_AIS Work Task","source":"Tencent (Rapporteur)","contact":"Yixue Lei","contact-id":78221,"tdoctype":"Work Plan","for":"Agreement","abstract":"Work Task and TU estimation for 5G_AIS","secretary_remarks":"e-mail revision 1 of S2-1908964. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30490,"status":"approved","reservation_date":"2019-10-29 10:30:40","uploaded":"2019-10-29 10:31:52","revisionof":"S2-1908964","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"5G_AIS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910832.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910833","title":"FS_eV2XARC_Ph2 Work Tasks","source":"LG Electronics (Rapporteur)","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"Work Plan","for":"Approval","abstract":"This paper proposes the break-down of objectives of FS_eV2XARC_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"e-mail revision 1 of S2-1908875. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30280,"status":"approved","reservation_date":"2019-10-29 10:30:41","uploaded":"2019-10-29 10:31:52","revisionof":"S2-1908875","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910833.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910834","title":"Rel-17 FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"e-mail revision 4 of S2-1910384. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30320,"status":"approved","reservation_date":"2019-10-29 10:30:41","uploaded":"2019-10-29 10:31:52","revisionof":"S2-1910384","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eLCS_ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910834.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910838","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"Work Plan","for":"Decision","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task","secretary_remarks":"e-mail revision 1 of S2-1910536. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30360,"status":"approved","reservation_date":"2019-10-29 10:30:42","uploaded":"2019-10-29 10:31:53","revisionof":"S2-1910536","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_UPCAS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910838.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910839","title":"5GLAN_enh Work Tasks","source":"Huawei (Rapporteur)","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Discussion","abstract":"Work Tasks","secretary_remarks":"e-mail revision 5 of S2-1910537. Approved. Revised at S2#136 in S2-1911600","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30390,"status":"revised","reservation_date":"2019-10-29 10:30:42","uploaded":"2019-10-29 10:31:53","revisionof":"S2-1910537","revisedto":"S2-1911600","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GLAN_enh"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910839.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910840","title":"FS_MPS2_St2 Work Tasks","source":"Perspecta Labs (Rapporteur)","contact":"Don Lukacs","contact-id":79989,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_MPS2_St2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"e-mail revision 1 of S2-1910538. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30420,"status":"approved","reservation_date":"2019-10-29 10:30:42","uploaded":"2019-10-29 10:31:53","revisionof":"S2-1910538","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_MPS2_St2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910840.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910841","title":"FS_eATSSS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Discussion","abstract":"This paper proposes the break-down of objectives of FS_eATSSS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"e-mail revision 6 of S2-1910539. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30470,"status":"approved","reservation_date":"2019-10-29 10:30:42","uploaded":"2019-10-29 10:31:53","revisionof":"S2-1910539","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_ATSSS_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910841.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910842","title":"FS_5WWC_Ph2 Work Tasks","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Approval","abstract":"It proposes WT and TU estimation for FS_5WWC_Ph2.","secretary_remarks":"e-mail revision 1 of S2-1910541. Approved","agenda_item_sort_order":59,"ainumber":"9.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI17 proposals","tdoc_agenda_sort_order":30540,"status":"approved","reservation_date":"2019-10-29 10:30:42","uploaded":"2019-10-29 10:31:53","revisionof":"S2-1910541","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910842.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]