[{"name":"S6-200992","title":"Phased approach proposal for the study of Mission Critical services over 5GS (TR 23.783)","source":"Union Inter. Chemins de Fer","contact":"Ingo Wendler","contact-id":58353,"tdoctype":"discussion","for":"Discussion","abstract":"The MCover5GS study has now been conducted for over two years with progress that is rather below average, which is partly due to the dependency on topics such as 5GS side link and MBMS support as well as by the present pandemic situation. There exist dependencies to other 3GPP groups, basically on results of related studies in SA2 and RAN groups. This causes delay even for those key issues, i.e. APNs \/ DNNs and roaming necessary for unicast based Mission Critical services, that are not directly dependent on side link and MBMS support.\nIt is proposed to group the study into three phases to push normative work on a per phase basis, i.e. get started before finishing the entire study:\n-\tPhase 1: Mission Critical services based on unicast only (no UE-to-network relay support)\n-\tPhase 2: Full set of on-network Mission Critical services using unicast and multicast (no UE-to-network relay support)\n-\tPhase 3: Full set of Mission Critical services.\n\nFor the mapping to specific key issues see the contribution S6-200992.","secretary_remarks":"","agenda_item_sort_order":28,"ainumber":"9","ainame":"Future work \/ New WIDs (including related contributions)","tdoc_agenda_sort_order":9920,"status":"noted","reservation_date":"2020-07-10 10:04:10","uploaded":"2020-07-10 13:06:31","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.783","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG6_MissionCritical\/TSGS6_038-e\/Docs\/S6-200992.zip","group":"S6","meeting":"S6-38-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S6-200993","title":"Work Item MCOver5GS Phase1 normative","source":"Union Inter. Chemins de Fer","contact":"Ingo Wendler","contact-id":58353,"tdoctype":"WID new","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":28,"ainumber":"9","ainame":"Future work \/ New WIDs (including related contributions)","tdoc_agenda_sort_order":9930,"status":"postponed","reservation_date":"2020-07-10 10:14:57","uploaded":"2020-07-10 13:06:31","revisionof":"","revisedto":"S6-201402","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG6_MissionCritical\/TSGS6_038-e\/Docs\/S6-200993.zip","group":"S6","meeting":"S6-38-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]