[{"name":"R2-166627","title":"Stage2 Running CR of light connection","source":"Huawei, HiSilicon","contact":"Xiaodong Yang","contact-id":45167,"tdoctype":"draftCR","for":"Endorsement","abstract":"R14","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"8.9.1","ainame":"LTE Rel-14: WI: Signalling reduction to enable light connection for LTE: Organisational","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2016-09-30 09:45:34","uploaded":"2016-10-01 00:00:56","revisionof":"","revisedto":"","release":"Rel-14","crspec":36.3,"crspecversion":"14.0.0","workitem":[{"winame":"LTE_LIGHT_CON-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_95bis\/Docs\/R2-166627.zip","group":"R2","meeting":"R2-95","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-166687","title":"Light Connection signaling and UE's modeling","source":"Intel Corporation","contact":"Marta Martinez Tarradell","contact-id":47010,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":61,"ainumber":"8.9.1","ainame":"LTE Rel-14: WI: Signalling reduction to enable light connection for LTE: Organisational","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2016-09-30 10:56:59","uploaded":"2016-10-01 06:46:56","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"LTE_LIGHT_CON-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_95bis\/Docs\/R2-166687.zip","group":"R2","meeting":"R2-95","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]