[{"name":"R4-2201716","title":"AMPR simulation results for Cat-M1 for B48","source":"Ericsson","contact":"Chunhui Zhang","contact-id":78832,"tdoctype":"discussion","for":"Approval","abstract":"This paper presents results of A-MPR simulations for LTE Band 24 CAT-M1 UE with full-RB and sub-PRB allocation.","secretary_remarks":"[101-bis-e][116] LTE_NR_Other_WI","agenda_item_sort_order":493,"ainumber":"8.7.2","ainame":"Others","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2022-01-10 16:15:23","uploaded":"2022-01-10 19:43:05","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"LTE_bands_R17_M1_M2_NB1_NB2-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_101-bis-e\/Docs\/R4-2201716.zip","group":"R4","meeting":"R4-101-bis-e","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]