[{"name":"S5-156211","title":"DP on alternative solution of Diameter Overload Control for Diameter charging applications","source":"ZTE Corporation","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":42,"ainumber":"8.5.2","ainame":"Study on Overload Control for Diameter Charging Applications","tdoc_agenda_sort_order":62110,"status":"withdrawn","reservation_date":"2015-11-09 13:59:08","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S5","meeting":"S5-104","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S5-156212","title":"DP on alternative solution of Diameter Overload Control for Diameter charging applications","source":"ZTE Corporation","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":42,"ainumber":"8.5.2","ainame":"Study on Overload Control for Diameter Charging Applications","tdoc_agenda_sort_order":62120,"status":"noted","reservation_date":"2015-11-09 14:16:23","uploaded":"2015-11-10 08:44:33","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG5_TM\/TSGS5_104\/Docs\/S5-156212.zip","group":"S5","meeting":"S5-104","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]