[{"name":"S2-2008343","title":"LS from ITU-R WP 5D: Development of a draft new Report ITU-R M.[IMT.C-V2X] - The use of the terrestrial component of IMT systems for Cellular-Vehicle-to-Everything","source":"ITU-R WP 5D","contact":"Uwe Loewenstein","contact-id":11941,"tdoctype":"LS in","for":"Information","abstract":"ITU-R Working Party (WP) 5D thanks contributing External Organizations for their reply liaison statement to WP 5D on C-V2X. WP 5D has further progressed its work on developing a working document towards a draft new Report ITU-R M.[IMT.C-V2X] 'The Use of the terrestrial component of IMT systems for Cellular-Vehicles-to-Everything'. WP 5D kindly requests the collaboration with External Organizations and seeks views and input, including but not limited to: - Use cases envisaged for C-V2X - Characteristics and Capabilities of C-V2X - Trial\/Deployment cases of C-V2X Working Party 5D looks forward External Organizations sharing information, preferably by its 37th meeting with a deadline for contribution set on 15th February 2021 (1600 UTC). Finally, WP 5D looks forward to continuing collaboration with External Organizations on this matter.","secretary_remarks":"Noted","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19520,"status":"noted","reservation_date":"2020-11-03 09:08:59","uploaded":"2020-11-03 09:12:54","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"EXTERNAL ORGANIZATIONS","Cc":"ITU-T SG 17, CITS","lsoriginalls":"5D\/TEMP\/206(Rev.2)","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008343.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008683","title":"Evaluation and conclusion update of pre-configuration.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This contribution updates the evaluation part for PC5 DRX schedule and provides the corresponding conclusion.","secretary_remarks":"Postponed","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19570,"status":"postponed","reservation_date":"2020-11-09 08:09:37","uploaded":"2020-11-09 14:11:43","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008683.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008684","title":"Conclusion Proposal.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"pCR","for":"Approval","abstract":"This contribution updates the conclusion.","secretary_remarks":"Postponed","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19600,"status":"postponed","reservation_date":"2020-11-09 08:09:37","uploaded":"2020-11-09 14:11:43","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008684.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008776","title":"KI#1, Sol#4 Update of Procedures and Solution Impacts.","source":"ZTE","contact":"Hao Dong","contact-id":75723,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes to update several steps in procedure and solution impacts in solution 4 for KI 1.","secretary_remarks":"Approved","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19540,"status":"approved","reservation_date":"2020-11-09 11:21:03","uploaded":"2020-11-09 11:36:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008776.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008777","title":"Evaluation Update regarding PC5 DRX Schedule Level.","source":"ZTE","contact":"Hao Dong","contact-id":75723,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes to update evaluation description regarding PC5 DRX schedules per communication destination address for different communication modes.","secretary_remarks":"Postponed","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19590,"status":"postponed","reservation_date":"2020-11-09 11:23:35","uploaded":"2020-11-09 11:36:11","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008777.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008790","title":"KI#1, Sol#2: Update to clarify V2X-AS layer interactions regarding the finally applied PC5 DRX schedule.","source":"Nokia, Nokia Shanghai Bell","contact":"Apostolos Papageorgiou","contact-id":87439,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes an update of Solution#2 for Key Issue #1, in order to clarify V2X-AS layer interactions regarding the finally applied PC5 DRX schedule.","secretary_remarks":"Approved","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19530,"status":"approved","reservation_date":"2020-11-09 12:17:17","uploaded":"2020-11-09 12:22:18","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008790.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008791","title":"Evaluation for the level of provisioned PC5 DRX schedules.","source":"Nokia, Nokia Shanghai Bell","contact":"Apostolos Papageorgiou","contact-id":87439,"tdoctype":"pCR","for":"Approval","abstract":"This paper brings back the analysis of the level of provisioned PC5 DRX schedules so that they are examined in the light of the (hopefully already received) RAN WG feedback.","secretary_remarks":"Postponed","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19580,"status":"postponed","reservation_date":"2020-11-09 12:17:17","uploaded":"2020-11-09 12:22:18","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008791.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008792","title":"Conclusions for PC5 DRX operation.","source":"Nokia, Nokia Shanghai Bell","contact":"Apostolos Papageorgiou","contact-id":87439,"tdoctype":"pCR","for":"Approval","abstract":"This paper adds two conclusions to be added in case RAN WG provides positive feedback to the provisioning of PC5 DRX configuration assistance info in the form of default PC5 DRX schedules.","secretary_remarks":"Noted","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19610,"status":"noted","reservation_date":"2020-11-09 12:17:17","uploaded":"2020-11-09 12:22:18","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008792.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2008943","title":"Update to Conclusions for PC5 DRX operation.","source":"Tencent","contact":"Yixue Lei","contact-id":78221,"tdoctype":"pCR","for":"Approval","abstract":"This pCR updates conclusion in case RAN WG provides positive feedback to the necessity\/benefits of application layer provided traffic pattern information.","secretary_remarks":"Noted","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19620,"status":"noted","reservation_date":"2020-11-09 15:24:44","uploaded":"2020-11-09 15:29:07","revisionof":"","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2008943.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2009088","title":"KI#1, Sol#5: PC5 DRX configuration for Rx UEs.","source":"Lenovo, Motorola Mobility","contact":"Dimitrios Karampatsis","contact-id":70692,"tdoctype":"pCR","for":"Approval","abstract":"-","secretary_remarks":"r01 agreed. Revised to S2-2009488.","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19550,"status":"revised","reservation_date":"2020-11-09 23:23:17","uploaded":"2020-11-09 23:27:07","revisionof":"","revisedto":"S2-2009488","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2009088.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2009488","title":"KI#1, Sol#5: PC5 DRX configuration for Rx UEs.","source":"Lenovo, Motorola Mobility","contact":"Dimitrios Karampatsis","contact-id":70692,"tdoctype":"pCR","for":"Approval","abstract":"-","secretary_remarks":"Revision of S2-2009088r01. Approved","agenda_item_sort_order":19,"ainumber":"8.12","ainame":"Study on architecture enhancements for 3GPP support of advanced V2X services - Phase 2 (FS_eV2XARC_Ph2)","tdoc_agenda_sort_order":19560,"status":"approved","reservation_date":"2020-11-26 07:13:10","uploaded":"2020-11-26 07:31:19","revisionof":"S2-2009088","revisedto":"","release":"Rel-17","crspec":"23.776","crspecversion":"0.3.0","workitem":[{"winame":"FS_eV2XARC_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_142e_Electronic\/Docs\/S2-2009488.zip","group":"S2","meeting":"S2-142-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]