[{"name":"S2-2001801","title":"Correcting 5GS TSN bridge delays","source":"Qualcomm Incorporated","contact":"Sebastian Speicher","contact-id":72922,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Remove Note 1. - Clarify that bridge delay is based on per traffic class minimum and maximum delays between UE and NW-TT (including UPF and NW-TT residence times, independent of frame length that a given 5GS deployment supports; the delays are pre-configured in the TSN AF (see clause 5.28.4). - Clarify how independent delays are calculated. - Clarify that UE-DS-TT Residence Time applies to all traffic classes. - Clarify that dependent delay take link speed into account. - Wording improvements","secretary_remarks":"Postponed","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14980,"status":"postponed","reservation_date":"2020-02-06 13:03:32","uploaded":"2020-02-18 19:48:43","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2127.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001801.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001817","title":"TSN parameters","source":"NTT DOCOMO, Nokia, Nokia Shanghai Bell","contact":"Jari Mutikainen","contact-id":38346,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Add a definiton of TSN AF Parameters (from AF to PCF) to 6.1.3.23. This is aligned with TS 23.502 which uses the 'TSN AF Parameters' in the service interface definitions. 2) In 6.1.3.23, the AF must indicate the service data flow description (traffic class, optionally destination MAC address of the TSN stream) to the PCF that the PCF uses to generate the PCC Rule. 3-4) Replace the 'Manageable Ethernet Port' with '5GS Bridge information' in parameters from SMF to PCF and from PCF to AF, as the information needs to convey also the Bridge ID and DS TT-UE residence time. The 5GS Bridge information can contain the Bridge address, UE-DS-TT residence time and zero or more Ethernet ports (port number and MAC address).","secretary_remarks":"Revision of unhandled S2-2000075 from SA2#136AH. Revised, merging S2-2001894, S2-2002058 and S2-2002228, to S2-2002579","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14900,"status":"revised","reservation_date":"2020-02-11 14:01:12","uploaded":"2020-02-18 15:55:14","revisionof":"S2-2000075","revisedto":"S2-2002579","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":344.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001817.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001829","title":"Clarification of TSN stream and traffic class","source":"NTT DOCOMO","contact":"Jari Mutikainen","contact-id":38346,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) 5.27.3: replace the traffic class with QoS Flow. 5.28.4: The QoS mapping is from TSN QoS information to 5QI. 2) 5.28.4: replace the QoS profile with PCC rule. 3) 5.28.2: replace the reference to 5.6.7 with clause 6.1.3.23 in TS 23.503. 4) 5.28.2: Clarify that the TSN AF uses the traffic forwarding information received from the CNC to determine the destination MAC addresses and corresponding egress ports. Use 'traffic forwarding information' instead of 'traffic routing information' consistently (aligned with rest of the subclause).","secretary_remarks":"Revised to S2-2002580","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14920,"status":"revised","reservation_date":"2020-02-12 15:21:04","uploaded":"2020-02-18 15:55:14","revisionof":"","revisedto":"S2-2002580","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2133.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001829.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001830","title":"Clarifying UL configuration issue","source":"Ericsson, Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding a clear indication on the identification of the PDU session to be configured in UL, using PSFP. Adding stream parameters to be exposed in clause 5.28.2. Addition of support for the Stream Identification function as specified by 802.1CB-2017. Adding stream filter table, stream gate table, and parameter StreamGateInstance in the Port Managemet Information container. Changes for rev3: Clarified that the use of PSFP is mandatory only at the TSN AF and can optionally be used at the DS-TT (if supported) and NW-TT (if supported) for the purpose of per-stream policing.","secretary_remarks":"Revision of agreed S2-2001508 from SA2#136AH. Revised, merging S2-2002051, to S2-2002558","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14110,"status":"revised","reservation_date":"2020-02-13 12:58:28","uploaded":"2020-02-18 16:33:34","revisionof":"S2-2001508","revisedto":"S2-2002558","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2069.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001830.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001832","title":"Item#4: Clarification on the PSFP and Qbv for TSC traffic","source":"ZTE, Nokia, Nokia Shanghai Bell, NTT DOCOMO","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: TSN AF use the PSFP and Qbv to derive the TSN Qos information.","secretary_remarks":"Revision of agreed S2-2001151 from SA2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14130,"status":"noted","reservation_date":"2020-02-13 15:31:23","uploaded":"2020-02-18 14:52:12","revisionof":"S2-2001151","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2064.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001832.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001891","title":"Discussion on the transfer and determination of the bridge delay related parameters.","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"discussion","for":"Approval","abstract":"Analysis issues for bridge delay related parameters transfer and determination among SMF, PCF and TSN AF.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14140,"status":"noted","reservation_date":"2020-02-15 08:43:57","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"Vertical_LAN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001891.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001892","title":"Correct the transfer and determination of the bridge delay related parameters","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Both the UE-DS-TT Residence Time and the PDB used for Bridge delay calculation are in reference to TSN GM. The SMF corrects the received UE-DS-TT residence time as the value in reference to TSN GM based on the clock drift between 5G GM and TSN GM. SMF reports the corrected UE-DS-TT Residence delay to the TSN AF via the PCF. The TSN AF constructs the port pairs of per NW-TT port and per DS-TT port and determines the bridge delay per port pair per traffic class based on the PDB related delay and the received UE-DS-TT residence time. Either the PDB related delay or bridge delay and UE-DS-TT residence time are used to decide the delay in TSN QoS information for the PCF.","secretary_remarks":"Revised to S2-2002559","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14150,"status":"revised","reservation_date":"2020-02-15 08:44:01","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"S2-2002559","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2143.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001892.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001893","title":"Correct the transfer of the bridge delay related parameters","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the EN and keep the statement of SMF reporting the UE-DS-TT Residence delay to the TSN AF via PCF. Clarify the procedure in annex F accordingly.","secretary_remarks":"Revised to S2-2002560","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14170,"status":"revised","reservation_date":"2020-02-15 08:44:03","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"S2-2002560","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2092.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001893.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001894","title":"Correct the delay in TSN QoS Information","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the the TSN QoS paramenters in 6.2.1.2. Clarify the delay in TSN QoS parameter as the PDB related delay. Either the PDB related delay or bridge delay and UE-DS-TT residence time can be used to decide the delay in TSN QoS information.","secretary_remarks":"Merged into S2-2002579","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14190,"status":"merged","reservation_date":"2020-02-15 08:44:04","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":407.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001894.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001895","title":"Discussion on how to transfer the NW-TT port's Port Management Container (Item#4 & Item#17 related).","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"discussion","for":"Approval","abstract":"Analysis and proposal for how to transfer the NW-TT port's port management information between TSN AF and UPF\/NW-TT (related to FASMO Item#4 & Item#17).","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14200,"status":"noted","reservation_date":"2020-02-15 08:44:05","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"Vertical_LAN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001895.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001896","title":"Item#4 and Item#17: Support the transfer of the NW-TT port's Port Management Container","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The UPF and AF uses PDU session related signalling of any PDU session related to DS-TT port to transfer the Port Management container.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14210,"status":"noted","reservation_date":"2020-02-15 08:44:05","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2144.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001896.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001897","title":"Correct the the NW-TT port related","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the port number of NW-TT port in the response of port number allocation request for DS-TT port In 4.16.5.2, the trigger that the AF provides Ethernet Port Management Information Container belongs to the trigger of AF session signalling, remove it from the triggers for AF provides\/revokes service information to the PCF. Other corrections.","secretary_remarks":"Revised to S2-2002561","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14220,"status":"revised","reservation_date":"2020-02-15 08:44:05","uploaded":"2020-02-18 16:44:34","revisionof":"","revisedto":"S2-2002561","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2093.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001897.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001967","title":"Clarifying gPTP message forwarding for multiple TSN PDU sessions","source":"Qualcomm Incorporated, Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove - 'Only one PDU session per UE per UPF is used for sending gPTP messages regardless of how many external TSN working domains have their clock information delivered through a given UPF serving that UE.' - 'When a UE is connected to multiple TSN working domains via the same UPF, then all gPTP messages from these domains are forwarded to the UE via the same PDU session.' Add clarifications with Rev3 that - 'UPF forwards the gPTP message of a TSN domain to the UEs via all PDU sessions terminating in this UPF that the UEs have established to the TSN network with the TSN domain.' - 'The NW-TT makes ingress timestamping (TSi) for the gPTP event messages of all domains and forwards the gPTP messages of all domains to the UEs as specified in clause 5.27.1.2.2'","secretary_remarks":"Revision of agreed S2-2001386 from S2#136AH. Revised to S2-2002562","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14240,"status":"revised","reservation_date":"2020-02-17 09:12:44","uploaded":"2020-02-18 15:18:38","revisionof":"S2-2001386","revisedto":"S2-2002562","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1951.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001967.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001968","title":"PDU Session for TSC","source":"Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: There is only one PDU Session is established per DS-TT port and NW-TT\/UPF pair. The PDU Session address is the MAC address of the DS-TT port. If there are multiple TSN domains are connected by both the DS-TT port and NW-TT, the same PDU Session is used to deliver the TSN messages for these TSN domains.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14260,"status":"noted","reservation_date":"2020-02-17 09:12:45","uploaded":"2020-02-18 15:18:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2152.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001968.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001969","title":"UPF reporting the time comparison","source":"NTT DOCOMO, Nokia, Nokia Shanghai Bell, Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) The SMF may adjust the TSCAI based on the Clock Drift Report from the UPF. This procedure needs to be introduced to Annex F. 2) In the case the UPF reports the change of the cumulative rateRatio between TSN time and 5G time to SMF, the SMF updates the TSCAI to RAN. 3) In Npcf_PolicyAuthorization_Create\/Update definitions, the correct reference to TSN AF parameters is 6.1.3.23 in TS 23.503. 4) Add the 5GS bridge information as an input parameter to the Npcf_SMPolicyControl_Update service operation. This construct contains all TSN related parameters that the SMF needs to be able to report to the PCF.","secretary_remarks":"Revision of agreed S2-2001503 from S2#136AH. Revised to S2-2002563","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14270,"status":"revised","reservation_date":"2020-02-17 09:12:48","uploaded":"2020-02-18 15:18:38","revisionof":"S2-2001503","revisedto":"S2-2002563","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1673.0,"crrevision":6.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001969.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001970","title":"Item#4: Apply StaticFilteringEntry information in 5GS","source":"vivo, ZTE, Nokia, Nokia Shanghai Bell, Samsung,Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Add Static Filtering Entry in the port management container and is transfer to NW-TT.","secretary_remarks":"Revision of agreed S2-2001505 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14290,"status":"noted","reservation_date":"2020-02-17 09:12:50","uploaded":"2020-02-18 15:18:38","revisionof":"S2-2001505","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1749.0,"crrevision":8.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001970.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001971","title":"Traffic Forwarding issue at UPF side","source":"Ericsson, Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove text that states any binding relationship between DS-TT and NW-TT ports. Specify that the UPF forwards traffic based on traffic forwarding information..","secretary_remarks":"Revision of agreed S2-2001504 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14300,"status":"noted","reservation_date":"2020-02-17 09:12:51","uploaded":"2020-02-18 15:18:38","revisionof":"S2-2001504","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2070.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001971.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2001972","title":"TSN CN PDB","source":"Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 5GC sets the DL TSCAI Burst Arrival Time as the sum of TSN QoS Burst Arrival Time and the dynamic value of CN PDB as described in clause 5.7.3.4. For the TSC QoS Flow, the dynamic value for the CN PDB is used and 5G-AN PDB is set to value 5QI PDB minus the dynamic value for the CN PDB as described in clause 5.7.3.4. The UPF sends the offset or the cumulative rateRatio only when the difference between the current measurement and the previously reported measurement is larger than a threshold as described in TS 23.502 [3] clause 4.4.3.4 . The UPF sends the offset or the cumulative rateRatio only when the difference between the current measurement and the previously reported measurement is larger than a threshold as described in TS 23.502 [3] clause 4.4.3.4 .","secretary_remarks":"Revision of unhandled S2-2000457 from S2#136AH. Revised to S2-2002564","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14310,"status":"revised","reservation_date":"2020-02-17 09:12:52","uploaded":"2020-02-18 15:18:38","revisionof":"S2-2000457","revisedto":"S2-2002564","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2050.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2001972.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002004","title":"Item#4 Discussion on the usage of PSFP for DL TSC traffic.","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"discussion","for":"Discussion","abstract":"This paper discuss the issue using Qbv to derive the DL traffic information, and propose using PSFP, to identify the DL traffic information.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14330,"status":"noted","reservation_date":"2020-02-17 11:53:38","uploaded":"2020-02-18 14:52:12","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"Vertical_LAN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002004.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002011","title":"Correction to TSN configuration call flows to include NEF","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Modifies clause 4.3.2.2.1 by removing references to NW-TT port numbers during PDU session establishment. 2) Modifies clause 4.3.3.2 by removing references to port management information for NW-TT during PDU session modification. 3) Modifies the figures in Annex F.1 and Annex F.2 to show that TSN bridge reporting and configuration follows either the PCF path (for information related to DS-TT) or the NEF path (for information related to NW-TT). NOTE: The details of the NEF and SMF TSN bridge capability exposure services in Figure F.1-1, as well as the NEF and SMF TSN bridge configuration services in Figure F.2-1, are not covered by this CR. It is assumed that those details will be addressed in future.","secretary_remarks":"Postponed","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14340,"status":"postponed","reservation_date":"2020-02-17 12:34:54","uploaded":"2020-02-18 16:48:04","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2111.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002011.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002013","title":"Clarification for Support for multiple TSN working domains","source":"NTT DOCOMO","contact":"Jari Mutikainen","contact-id":38346,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a NOTE: In this Release of specification, support for multiple TSN working domains is limited related to IEEE 802.1AS [104] and does not apply to interaction involving TSN AF and CNC. The corresponding IEEE specifications (i.e. 802.1Qcc [95], 802.1Qbv [96], and 802.1Q [98]) do not support it.","secretary_remarks":"Revised to S2-2002565","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14350,"status":"revised","reservation_date":"2020-02-17 15:09:06","uploaded":"2020-02-18 15:55:14","revisionof":"","revisedto":"S2-2002565","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2165.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002013.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002027","title":"Correction to transfer of port management information to include NEF","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clause 5.28.3.2 is modified to clarify that TSN bridge reporting and configuration follows either the PCF path (for information related to DS-TT) or the NEF path (for information related to NW-TT). The whole clause has been restructured in four distinct parts, as follows: - DS-TT to TSN AF - NW-TT to TSN AF - TSN AF to DS-TT, and - TSN AF to NW-TT.","secretary_remarks":"Postponed","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14650,"status":"postponed","reservation_date":"2020-02-17 16:54:12","uploaded":"2020-02-18 16:48:04","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2167.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002027.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002044","title":"QoS flow binding for TSN streams with same periodicity","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Describe that the TSN AF provides some TSC parameters that are not used to generate a 5QI, and included in the PCC Rule then used by the SMF for binding PCC Rules into QoS flows.","secretary_remarks":"Revision of agreed S2-2001606 from S2#136AH. Revised to S2-2002574","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14660,"status":"revised","reservation_date":"2020-02-17 19:21:44","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2001606","revisedto":"S2-2002574","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":394.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002044.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002046","title":"QoS container vs. TSCAI input container","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Change 'QoS container' name to 'TSCAI input container'.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14680,"status":"noted","reservation_date":"2020-02-17 19:21:50","uploaded":"2020-02-18 17:41:39","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2170.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002046.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002047","title":"MDBV mapping and configuration for TSC QoS Flow","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In case the Maximum Burst Size of the aggregated TSC streams in the traffic class is provided by CNC via TSN AF to PCF, PCF can derive the required MDBV taking the Maximum Burst Size and TSCAI as input. If the default MDBV associated with a 5QI in the QoS mapping table can't satisfy the aggregated TSC Burst Size, the PCF provides the derived MDBV in the PCC rule and then the SMF performs QoS Flow binding.","secretary_remarks":"Revision of unhandled S2-2000524 from S2#136AH. Revised, merging S2-2002271, to S2-2002576","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14690,"status":"revised","reservation_date":"2020-02-17 19:21:52","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2000524","revisedto":"S2-2002576","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":372.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002047.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002048","title":"MDBV mapping and configuration for TSC QoS Flow","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In case the Maximum Burst Size of the aggregated TSC streams in the traffic class is provided by CNC via TSN AF to PCF, PCF can derive the required MDBV taking the Maximum Burst Size and TSCAI as input. If the default MDBV associated with a 5QI in the QoS mapping table can't satisfy the aggregated TSC Burst Size, the PCF provides the derived MDBV in the PCC rule and then the SMF performs QoS Flow binding.","secretary_remarks":"Revision of unhandled S2-2000525 from S2#136AH. R02 approved. Revised to S2-2002604.","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14710,"status":"revised","reservation_date":"2020-02-17 19:21:53","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2000525","revisedto":"S2-2002604","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1980.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002048.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002049","title":"Session binding using DS-TT MAC and bridgeID","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: For time sensitive communicaiton, if MAC address of DS-TT port is not globally unique. A combination of MAC address of a DS-TT port and a Bridge ID (i.e. Bridge MAC address) is used by PCF for session binding PCF shall support transparently exchange of port management information container between TSN AF and DS-TT or NW-TT, as defined in TS 23.501 [2] clause 5.28.3.","secretary_remarks":"Revision of unhandled S2-2000523 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14720,"status":"noted","reservation_date":"2020-02-17 19:21:55","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2000523","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":371.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002049.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002050","title":"Additional traffic pattern calculations","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Additional information on calculation of traffic pattern parameters of aggregated TSN Stream using 802.1Qbv (reference to egress port) only for DL. Accordingly, changes in 5.27.2 and 5.27.3 to reflect that traffic pattern parameters may be referred to the time at ingress port (if based on PSFP information) or at egress port (if based on 802.1Qbv).","secretary_remarks":"Revision of unhandled S2-2000555 from S2#136AH. R01 approved. Revised to S2-2002577","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14740,"status":"revised","reservation_date":"2020-02-17 19:21:56","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2000555","revisedto":"S2-2002577","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2071.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002050.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002051","title":"Clarifying UL configuration issue","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding a clear indication on the identification of the PDU session to be configured in UL, using PSFP. Adding stream parameters to be exposed in clause 5.28.2. Addition of support for the Stream Identification function as specified by 802.1CB-2017. Adding stream filter table, stream gate table, and parameter StreamGateInstance in the Port Managemet Information container.","secretary_remarks":"Revision of agreed S2-2001508 from S2#136AH Merged into S2-2002558","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14750,"status":"merged","reservation_date":"2020-02-17 19:21:57","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2001508","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2069.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002051.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002052","title":"Traffic Forwarding issue at UPF side","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove text that states any binding relationship between DS-TT and NW-TT ports. Specify that the UPF forwards traffic based on traffic forwarding information. Clarify that Static Filtering Entries are delivered to the UPF which maintains a list of Static Filtering Entries.","secretary_remarks":"Revision of agreed S2-2001504 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14760,"status":"noted","reservation_date":"2020-02-17 19:21:57","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2001504","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2070.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002052.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002053","title":"Item#4: Apply StaticFilteringEntry information in 5GS","source":"Vivo ?, ZTE?, Nokia ?, Nokia Shanghai Bell ?, Samsung ?, Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: - Remove Static Filtering Entry in the port management container and is transfer to NW-TT. Add that a list of Static Filtering Entries is stored and maintained at the UPF. Add a bridge management information container per PDU session to be delivered to the UPF. Add text to indicate how the information is forwarded to the UPF.","secretary_remarks":"Revision of agreed S2-2001505 from S2#136AH. Confirm Sources! Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14770,"status":"noted","reservation_date":"2020-02-17 19:21:58","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2001505","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1749.0,"crrevision":10.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002053.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002054","title":"Change to Annex F.2","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding text to clarify that a QoS flow can transfer a set of aggregated TSN streams.","secretary_remarks":"Revision of unhandled S2-2000556 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14780,"status":"noted","reservation_date":"2020-02-17 19:22:00","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2000556","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2032.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002054.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002055","title":"Clarifying hold and forward buffering mechanism","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Hold and Forwarding Buffereing function needs interworking of DS-TT and NW-TT functions. TT function at the ingress marks the frame according to its receive time what is used at the egress TT to deliver the frame according to the predefined bridge delay of the 5GS.","secretary_remarks":"Revision of noted S2-2000552 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14790,"status":"noted","reservation_date":"2020-02-17 19:22:01","uploaded":"2020-02-18 17:41:39","revisionof":"S2-2000552","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2068.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002055.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002056","title":"Clarifying hold and forward buffering mechanism","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Information","abstract":"Hold and Forwarding Buffereing function needs interworking of DS-TT and NW-TT functions. TT function at the ingress marks the frame according to its receive time what is used at the egress TT to deliver the frame according to the predefined bridge delay of the 5GS.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14800,"status":"noted","reservation_date":"2020-02-17 19:22:02","uploaded":"2020-02-18 17:41:39","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"","workitem":[{"winame":"Vertical_LAN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002056.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002057","title":"Determination of QoS parameters applicable to TSN AF","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Extend the definition iof a Flow Description to include MAC addresses Indicate that the PCF determines the GBR, MBR and ARP needed for the QoS profile for the QoS flow to transfer TSN flows. Indicate that the PCF may provision at PDU session establishment the 5QI with dynamic QoS characteristics based on the agreement between the TSN AF and the MNO. Change name of TSN AF QoS container to TSN AF TSCAI input container.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14810,"status":"noted","reservation_date":"2020-02-17 19:22:02","uploaded":"2020-02-18 17:41:39","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":413.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002057.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002058","title":"Event Triggers subscribed by the TSN AF","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove possibility to subscribe to TSN AF event triggers over Rx. Add a description of TSN related Event triggers.","secretary_remarks":"Merged into S2-2002579","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14820,"status":"merged","reservation_date":"2020-02-17 19:22:02","uploaded":"2020-02-18 17:41:39","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":414.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002058.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002059","title":"Adding reference points in the Architecture to support Time Sensitive Communication","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding reference points from NEF to PCF and from NEF to UDM","secretary_remarks":"Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14840,"status":"agreed","reservation_date":"2020-02-17 19:22:03","uploaded":"2020-02-18 17:41:39","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2171.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002059.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002074","title":"UPF selection based on traffic classes and VLAN","source":"CATT","contact":"Yuan Tao","contact-id":82804,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Add the parameters traffic class and VLAN for UPF selection. 2. Correct 'Port Management Container' to 'Port Management Information Container'.","secretary_remarks":"Revised to S2-2002578","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14840,"status":"revised","reservation_date":"2020-02-18 02:50:12","uploaded":"2020-02-18 03:24:27","revisionof":"","revisedto":"S2-2002578","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2172.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002074.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002076","title":"Clarification on Port Manangement information exchange","source":"CATT","contact":"Yuan Tao","contact-id":82804,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Clarify that the SMF reports the Port management information Container and the port number of the related DS-TT\/NW-TT Ethernet port to TSN AF. 2. Add the DS-TT MAC adress as an input parameter to the Npcf_PolicyAuthorization_Create, Npcf_PolicyAuthorization_Update service operations, also add the Port Management Information Container, port number of manageable Ethernet port as output parameters to the Npcf_SMPolicyControl_Update service operation.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14860,"status":"noted","reservation_date":"2020-02-18 03:04:49","uploaded":"2020-02-18 03:24:27","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2124.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002076.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002091","title":"Replace IEEE802.1Qbv with IEEE802.1Q","source":"Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The reference to the IEEE802.1Qbv is superseded by IEE 802.1Q , and the table number in the 802.1Qbv is replaced with the table number in the IEEE 802.1Q.","secretary_remarks":"Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14880,"status":"agreed","reservation_date":"2020-02-18 04:30:38","uploaded":"2020-02-18 15:18:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2178.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002091.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002111","title":"[#13] Bridge Delay Time Conversion","source":"Samsung","contact":"Sang-Jun Moon","contact-id":30993,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The SMF is responsible for mapping the UE-DS-TT Residence Time and the PDB from the 5GS clock to a TSN clock.","secretary_remarks":"Revision of unhandled S2-2000800 from S2#136AH. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14880,"status":"noted","reservation_date":"2020-02-18 07:25:38","uploaded":"2020-02-18 10:38:14","revisionof":"S2-2000800","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2101.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002111.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002112","title":"[#1] QoS Mapping considering Time Conversion","source":"Samsung","contact":"Sang-Jun Moon","contact-id":30993,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is added that the SMF is responsible for mapping PDB from TSN clock base into 5GS clock base.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14890,"status":"noted","reservation_date":"2020-02-18 07:31:10","uploaded":"2020-02-18 10:38:14","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2180.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002112.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002133","title":"Correction on QoS Flow Binding about TSN","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: PCC rule with TSN AF QoS Container will be bound to an independent QoS Flow.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14370,"status":"noted","reservation_date":"2020-02-18 07:57:54","uploaded":"2020-02-18 13:06:09","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":421.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002133.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002134","title":"Correction on QoS Flow Binding about TSN","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Refer to the corrected QoS Flow Binding Mechanism.","secretary_remarks":"Revised to S2-2002566","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14380,"status":"revised","reservation_date":"2020-02-18 07:57:55","uploaded":"2020-02-18 13:06:09","revisionof":"","revisedto":"S2-2002566","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2183.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002134.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002157","title":"Clarification for PDU sessions transferring gPTP messages","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: See Reason for Change","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14400,"status":"noted","reservation_date":"2020-02-18 09:03:55","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2187.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002157.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002158","title":"Clock Drift report towards PCF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: QoS mapping table in the PCF should be in reference to the 5G GM SMF reports the time offset or the cumulative rateRatio between TSN time and 5G time to PCF","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14410,"status":"noted","reservation_date":"2020-02-18 09:03:55","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2188.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002158.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002159","title":"Clock Drift report towards PCF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Report Clock Drift from SMF to PCF via Npcf_SMPolicyControl_Update service","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14420,"status":"noted","reservation_date":"2020-02-18 09:03:56","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2136.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002159.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002160","title":"Clock Drift report towards PCF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Report Clock Drift from SMF to PCF","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14430,"status":"noted","reservation_date":"2020-02-18 09:03:57","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":422.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002160.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002161","title":"Correction to TSN stream aggregation and QoS parameter mapping guidelines","source":"Huawei, HiSilicon, Nokia?, Nokia Shanghai Bell?, Ericsson?","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that the AF enables aggregation, also add that compatible BAT is needed in order to aggregate TSN streams. Fix TSN Time Sync Annex to remove the EN and replace with the correct TS reference. Clarification on compatible BAT","secretary_remarks":"Revision of agreed S2-2001510 from S2#136AH. Confirm Sources! Revised to S2-2002567","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14440,"status":"revised","reservation_date":"2020-02-18 09:03:58","uploaded":"2020-02-18 12:07:07","revisionof":"S2-2001510","revisedto":"S2-2002567","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2085.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002161.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002162","title":"Clarification on Port Management Information Container toward SMF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Correct step 4 of 4.16.5.2 PCF initiated SM Policy Association Modification - remove 'and\/or the Port Management Information Container and related port number as received from the AF'","secretary_remarks":"Revised to S2-2002568","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14460,"status":"revised","reservation_date":"2020-02-18 09:03:59","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"S2-2002568","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2137.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002162.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002163","title":"Procedure udpate for PDU Session establishment and Bridge based information reporting","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Provide the 5GS Bridge ID and DS-TT port number to the DS-TT. 2. Decide the port pair before calculating the bridge delay. 3. UPF selection and NW-TT port selection clarification.","secretary_remarks":"Revision of unhandled S2-2000639 from S2#136AH. Revised to S2-2002569","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14480,"status":"revised","reservation_date":"2020-02-18 09:04:00","uploaded":"2020-02-18 12:07:07","revisionof":"S2-2000639","revisedto":"S2-2002569","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2043.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002163.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002164","title":"Solution for the issue of hold and forward mechanism","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The flow based scheduling information is used to calculate the expected time window on egress port in order to enable DS-TT or NW-TT hold and buffer the earlier arrived packets.","secretary_remarks":"Postponed","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14500,"status":"postponed","reservation_date":"2020-02-18 09:04:01","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2189.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002164.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002189","title":"Ports of static filtering entry.","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"discussion","for":"Agreement","abstract":"This discussion paper aims at explaining the ports related to static filtering entry in IEEE 802.1Q","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14510,"status":"noted","reservation_date":"2020-02-18 10:35:20","uploaded":"2020-02-18 12:07:07","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"Vertical_LAN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002189.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002207","title":"VLAN Information configuration and information exchange.","source":"Nokia, Nokia Shanghai Bell","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"discussion","for":"Information","abstract":"The paper proposes how VLAN configuration information of DS-TT \/ NW-TT ports are exchanged inside a 5GS TSN Bridge.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14520,"status":"noted","reservation_date":"2020-02-18 12:13:16","uploaded":"2020-02-18 20:49:15","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"Vertical_LAN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002207.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002208","title":"VLAN Information configuration and information exchange","source":"Nokia, Nokia Shanghai Bell","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: It is proposed to introduce the VLAN configuration information exchange between TSN AF and the ports of DS-TT\/NW-TT by adding the information to the port management container described in TS 23.501 clause 5.28.3.1.","secretary_remarks":"Postponed","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14530,"status":"postponed","reservation_date":"2020-02-18 12:13:16","uploaded":"2020-02-18 20:49:15","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2196.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002208.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002212","title":"Vertical_LAN TSN related CR for non-FASMO corrections","source":"Nokia, Nokia Shanghai Bell, Tencent, Huawei","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces: Abbreviations missing for TSN Retained one occurrence with appropriate reference to IEEE TSN, removed the duplicates. The reference to th IEEE802.1Qbv is replaced by IEE 802.1Q ,so the table number in the 802.1Qbv is replaced with the table number in the IEEE 802.1Q Term alignment: '5GS xxx bridge' -> '5GS Bridge', 'AF' -> 'TSN AF' Remove Bridge name.","secretary_remarks":"Revised to S2-2002570","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14540,"status":"revised","reservation_date":"2020-02-18 12:13:19","uploaded":"2020-02-18 20:49:15","revisionof":"","revisedto":"S2-2002570","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2198.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002212.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002224","title":"TSN working domain and aggregation","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Propose a definition of TSN working domain. TSN AF may aggregate TSN streams if the TSN streams belong to the same traffic class, terminate in the same egress port and have the same periodicity and the same TSN working domain.","secretary_remarks":"Revised to S2-2002571","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14560,"status":"revised","reservation_date":"2020-02-18 12:20:01","uploaded":"2020-02-18 14:21:39","revisionof":"","revisedto":"S2-2002571","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2202.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002224.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002225","title":"Establishment of different PDU Sessions for DS-TT ports","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify how the UE decides to request a new PDU Session for a DS-TT port and it may decide the S-NSSAI and DNN for the requested PDU Session based on local configuration or the URSP rule.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14580,"status":"noted","reservation_date":"2020-02-18 12:20:02","uploaded":"2020-02-18 14:21:40","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2203.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002225.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002226","title":"Updates for Bridge Delay information reporting and QoS mapping","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The UPF Residence time includes NW-TT Residence time. The port number of the DS-TT Ethernet port and port number of the serving NW-TT Ethernet port(s) for a PDU Session shall be reported to the SMF from the UPF and further stored at the SMF. The TSN AF deduces the related port pair(s) from the port number of the DS-TT Ethernet port and port number(s) of the serving NW-TT Ethernet port(s) when the TSN AF receives the 5GS Bridge information for a newly established PDU Session and calculates the bridge delays per port pair. The SMF reports the UE-DS-TT Residence Time and minimum PDB in reference to TSN time to the AF via PCF. The TSN AF updates the 5GS Bridge delay based on the received information from the SMF.","secretary_remarks":"Revised to S2-2002572","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14590,"status":"revised","reservation_date":"2020-02-18 12:20:03","uploaded":"2020-02-18 14:21:40","revisionof":"","revisedto":"S2-2002572","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2204.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002226.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002227","title":"Update for Bridge Delay information reporting and QoS mapping","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: During UE requested PDU Session establishment procedure, the SMF sends UE-DS-TT Residence Time and minimum PDB of the PDU Session (both in reference to TSN GM) to the PCF. The TSN AF constructs the information received from the SMF as 5GS Bridge information and reports to the CNC.","secretary_remarks":"Revised to S2-2002573","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14610,"status":"revised","reservation_date":"2020-02-18 12:20:04","uploaded":"2020-02-18 14:21:40","revisionof":"","revisedto":"S2-2002573","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2150.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002227.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002228","title":"Update for Bridge Delay information reporting and QoS mapping","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The SMF provides the UE-DS-TT Residence Time and minimum PDB supported by the PDU Session in reference TSN GM to the PCF. The PCF provides the received information to the TSN AF. PCF reports the Manageable Ethernet Port detected and the available Port Management Information Container to the TSN AF.","secretary_remarks":"Merged into S2-2002579","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14630,"status":"merged","reservation_date":"2020-02-18 12:20:04","uploaded":"2020-02-18 14:21:40","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":425.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002228.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002229","title":"Incorrect reference to IEEE 1588 Timestamp data type in normative Annex H.2","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarified in Annex H.2 that the ingress timestamp (TSi) shall be encoded in the same format as the Timestamp data type defined in clause 5.3.3 of IEEE 1588-2008.","secretary_remarks":"Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14640,"status":"agreed","reservation_date":"2020-02-18 12:29:30","uploaded":"2020-02-18 16:34:31","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2205.0,"crrevision":"","crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002229.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002264","title":"UPF selection based on TSN parameters and context correction","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Delete 'optional' decription for NW-TT and DS-TT to support hold and forward mechanism. Adds a bullet to clarify the bridge information configuration before PDU session establishment. Adds 'TSC Burst Size' parameter in TSN QoS information. Adds 'traffic classes' and 'VLANs' for SMF to select UPF when establish a PDU session for TSC.","secretary_remarks":"Revised to S2-2002581","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14940,"status":"revised","reservation_date":"2020-02-18 14:40:36","uploaded":"2020-02-18 15:00:46","revisionof":"","revisedto":"S2-2002581","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2212.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002264.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002271","title":"Supplement for TSN QoS information in TS 23.503","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding TSC burst size and traffic class parameter in TSN QoS information. Adding TSC burst size in TSN AF parameters for PCF.","secretary_remarks":"Merged into S2-2002576","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14960,"status":"merged","reservation_date":"2020-02-18 14:58:09","uploaded":"2020-02-18 15:00:46","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":427.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002271.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002289","title":"Clarification on Qos flow binding and the IE between SMF and PCF, PCF and TSN AF","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding The Burst arrival time and Periodicity are required for Qos flow binding. Rx interface is not used for TSC communication.","secretary_remarks":"Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14970,"status":"noted","reservation_date":"2020-02-18 17:06:04","uploaded":"2020-02-18 17:08:02","revisionof":"","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":428.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002289.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002558","title":"Clarifying UL configuration issue","source":"Ericsson, Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding a clear indication on the identification of the PDU session to be configured in UL, using PSFP. Adding stream parameters to be exposed in clause 5.28.2. Addition of support for the Stream Identification function as specified by 802.1CB-2017. Adding stream filter table, stream gate table, and parameter StreamGateInstance in the Port Managemet Information container. Changes for rev3: Clarified that the use of PSFP is mandatory only at the TSN AF and can optionally be used at the DS-TT (if supported) and NW-TT (if supported) for the purpose of per-stream policing.","secretary_remarks":"Revision R02 of S2-2001830, merging S2-2002051. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14120,"status":"agreed","reservation_date":"2020-02-28 13:24:47","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001830","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2069.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-200075","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002558.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002559","title":"Correct the transfer and determination of the bridge delay related parameters","source":"Vivo, Qualcomm Incorporated","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the PDB as the delay between UE and UPF\/NW-TT The delay between UE and UPF\/NW-TT is pre-configured at the TSN AF as the pre-configured bridge delay. The pre-configured bridge delay is used to decide the delay in TSN QoS information for the PCF. The TSN AF constructs the port pairs of per NW-TT port and per DS-TT port and determines the bridge delay per port pair per traffic class based on pre-configured bridge delay between UE and UPF\/NW-TT and the received UE-DS-TT residence time.","secretary_remarks":"Revision R07 of S2-2001892. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14160,"status":"agreed","reservation_date":"2020-02-28 13:24:48","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001892","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2143.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002559.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002560","title":"Correct the transfer of the bridge delay related parameters","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the EN and keep the statement of SMF reporting the UE-DS-TT Residence delay to the TSN AF via PCF. Clarify the procedure in annex F accordingly.","secretary_remarks":"Revision R03 of S2-2001893. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14180,"status":"agreed","reservation_date":"2020-02-28 13:24:50","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001893","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2092.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002560.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002561","title":"Correct the the NW-TT port related","source":"vivo","contact":"xiaowan ke","contact-id":74585,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In 4.16.5.2, the trigger that the AF provides Ethernet Port Management Information Container belongs to the trigger of AF session signalling, remove it from the triggers for AF provides\/revokes service information to the PCF.","secretary_remarks":"Revision R01 of S2-2001897. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14230,"status":"agreed","reservation_date":"2020-02-28 13:24:51","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001897","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2093.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002561.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002562","title":"Clarifying gPTP message forwarding for multiple TSN PDU sessions","source":"Qualcomm Incorporated, Tencent, Ericsson","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove - 'Only one PDU session per UE per UPF is used for sending gPTP messages regardless of how many external TSN working domains have their clock information delivered through a given UPF serving that UE.' - 'When a UE is connected to multiple TSN working domains via the same UPF, then all gPTP messages from these domains are forwarded to the UE via the same PDU session.' Add clarifications with Rev4 that - 'UPF forwards the gPTP message of a TSN network to the UEs via all PDU sessions terminating in this UPF that the UEs have established to the TSN network.' - 'The NW-TT makes ingress timestamping (TSi) for the gPTP event messages of all domains and forwards the gPTP messages of all domains to the UEs as specified in clause 5.27.1.2.2'","secretary_remarks":"Revision R02 of S2-2001967. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14250,"status":"agreed","reservation_date":"2020-02-28 13:24:53","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001967","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1951.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"SP-200075","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002562.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002563","title":"UPF reporting the time comparison","source":"NTT DOCOMO, Nokia, Nokia Shanghai Bell, Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) The SMF may adjust the TSCAI based on the Clock Drift Report from the UPF. This procedure needs to be introduced to Annex F. 2) In the case the UPF reports the change of the cumulative rateRatio between TSN time and 5G time to SMF, the SMF updates the TSCAI to RAN. 3) In Npcf_PolicyAuthorization_Create\/Update definitions, the correct reference to TSN AF parameters is 6.1.3.23 in TS 23.503. 4) Add the 5GS bridge information as an input parameter to the Npcf_SMPolicyControl_Update service operation. This construct contains all TSN related parameters that the SMF needs to be able to report to the PCF.","secretary_remarks":"Revision R01 of S2-2001969. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14280,"status":"agreed","reservation_date":"2020-02-28 13:24:55","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001969","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1673.0,"crrevision":7.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002563.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002564","title":"TSN CN PDB","source":"Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 5GC sets the DL TSCAI Burst Arrival Time as the sum of TSN QoS Burst Arrival Time and the dynamic value of CN PDB as described in clause 5.7.3.4. For the TSC QoS Flow, the dynamic value for the CN PDB is used and 5G-AN PDB is set to value 5QI PDB minus the dynamic value for the CN PDB as described in clause 5.7.3.4. The UPF sends the offset or the cumulative rateRatio only when the difference between the current measurement and the previously reported measurement is larger than a threshold as described in TS 23.502 [3] clause 4.4.3.4 .","secretary_remarks":"Revision R01 of S2-2001972. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14320,"status":"agreed","reservation_date":"2020-02-28 13:24:56","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001972","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2050.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-200075","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002564.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002565","title":"Clarification for Support for multiple TSN working domains","source":"NTT DOCOMO","contact":"Jari Mutikainen","contact-id":38346,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a NOTE: In this Release of specification, support for multiple TSN working domains is limited related to IEEE 802.1AS [104] for time synchronization procedure but it does not apply to interaction involving TSN AF and CNC. The corresponding IEEE specifications (i.e.802.1Qbv [96] and 802.1Qci [98]) are supported only for one specific gPTP Domain and it is assumed that specific gPTP Domain is associated with IEEE 802.1Qbv [96] and IEEE 802.1Qci [98].","secretary_remarks":"Revision R05 of S2-2002013. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14360,"status":"agreed","reservation_date":"2020-02-28 13:24:57","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002013","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2165.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002565.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002566","title":"Correction on QoS Flow Binding about TSN","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Refer to the corrected QoS Flow Binding Mechanism.","secretary_remarks":"Revision R02 of S2-2002134. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14390,"status":"agreed","reservation_date":"2020-02-28 13:24:58","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002134","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2183.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002566.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002567","title":"Correction to TSN stream aggregation and QoS parameter mapping guidelines","source":"Nokia, Nokia Shanghai Bell, Ericsson, Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify that the AF enables aggregation, also add that compatible BAT is needed in order to aggregate TSN streams. Fix TSN Time Sync Annex to remove the EN and replace with the correct TS reference. Clarification on compatible BAT","secretary_remarks":"Revision R03 of S2-2002161. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14450,"status":"agreed","reservation_date":"2020-02-28 13:24:59","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002161","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2085.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002567.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002568","title":"Clarification on Port Management Information Container toward SMF","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Correct step 5 of 4.16.5.1 PCF initiated SM Policy Association Modification - remove 'and\/or the Port Management Information Container and related port number as received from the AF' Correct step 4 of 4.16.5.2 PCF initiated SM Policy Association Modification - remove 'and\/or the Port Management Information Container and related port number as received from the AF'","secretary_remarks":"Revision R01 of S2-2002162. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14470,"status":"agreed","reservation_date":"2020-02-28 13:25:00","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002162","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2137.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002568.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002569","title":"Procedure udpate for PDU Session establishment and Bridge based information reporting","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. Provide the 5GS Bridge ID and DS-TT port number to the DS-TT. 2. Decide the port pair before calculating the bridge delay. 3. UPF selection and NW-TT port selection clarification.","secretary_remarks":"Revision R06 of S2-2002163. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14490,"status":"agreed","reservation_date":"2020-02-28 13:25:01","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002163","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2043.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002569.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002570","title":"Vertical_LAN TSN related CR for non-FASMO corrections","source":"Nokia, Nokia Shanghai Bell, Tencent, Huawei","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduces: Abbreviations missing for TSN Retained one occurrence with appropriate reference to IEEE TSN, removed the duplicates. The reference to th IEEE802.1Qbv is replaced by IEE 802.1Q ,so the table number in the 802.1Qbv is replaced with the table number in the IEEE 802.1Q Term alignment: '5GS xxx bridge' -> '5GS Bridge', 'AF' -> 'TSN AF' Remove Bridge name.","secretary_remarks":"Revision R03 of S2-2002212. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14550,"status":"agreed","reservation_date":"2020-02-28 13:25:03","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002212","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2198.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002570.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002571","title":"TSN working domain and aggregation","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Propose a definition of TSN working domain and clarify .","secretary_remarks":"Revision R02 of S2-2002224. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14570,"status":"agreed","reservation_date":"2020-02-28 13:25:04","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002224","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2202.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002571.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002572","title":"Updates for Bridge Delay information reporting and QoS mapping","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The UPF Residence time includes NW-TT Residence time. The port number of the DS-TT Ethernet port and port number of the serving NW-TT Ethernet port(s) for a PDU Session shall be reported to the SMF from the UPF and further stored at the SMF. The TSN AF deduces the related port pair(s) from the port number of the DS-TT Ethernet port and port number(s) of the serving NW-TT Ethernet port(s) when the TSN AF receives the 5GS Bridge information for a newly established PDU Session and calculates the bridge delays per port pair.","secretary_remarks":"Revision R04 of S2-2002226. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14600,"status":"agreed","reservation_date":"2020-02-28 13:25:06","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002226","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2204.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002572.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002573","title":"Update for Bridge Delay information reporting and QoS mapping","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The TSN AF constructs the information received from the SMF as 5GS Bridge information and reports to the CNC.","secretary_remarks":"Revision R01 of S2-2002227. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14620,"status":"agreed","reservation_date":"2020-02-28 13:25:07","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002227","revisedto":"","release":"Rel-16","crspec":"23.502","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2150.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002573.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002574","title":"QoS flow binding for TSN streams with same periodicity","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Describe that the TSN AF provides some TSC parameters that are not used to generate a 5QI, and included in the PCC Rule then used by the SMF for binding PCC Rules into QoS flows.","secretary_remarks":"Revision R10 of S2-2002044. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14670,"status":"agreed","reservation_date":"2020-02-28 13:25:08","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002044","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":394.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002574.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002576","title":"MDBV mapping and configuration for TSC QoS Flow","source":"Ericsson, China Mobile","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Clarify the aggregated TSN streams.","secretary_remarks":"Revision R06 of S2-2002047, merging S2-2002271. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14700,"status":"agreed","reservation_date":"2020-02-28 13:25:09","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002047","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":372.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002576.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002577","title":"Additional traffic pattern calculations","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Additional information on calculation of traffic pattern parameters of aggregated TSN Stream using 802.1Qbv (reference to egress port) only for DL..","secretary_remarks":"Revision R01 of S2-2002050. Noted","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14750,"status":"noted","reservation_date":"2020-02-28 13:25:10","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002050","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2071.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002577.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002578","title":"UPF selection based on traffic classes and VLAN","source":"CATT","contact":"Yuan Tao","contact-id":82804,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Correct 'Port Management Container' to 'Port Management Information Container'.","secretary_remarks":"Revision R02 of S2-2002074. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14860,"status":"agreed","reservation_date":"2020-02-28 13:25:12","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2002074","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2172.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002578.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002579","title":"TSN parameters","source":"NTT DOCOMO, Nokia, Nokia Shanghai Bell, vivo, ZTE, Ericsson","contact":"Jari Mutikainen","contact-id":38346,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1) Add a definiton of TSN AF Parameters (from AF to PCF) to 6.1.3.23. This is aligned with TS 23.502 which uses the 'TSN AF Parameters' in the service interface definitions. 2) In 6.1.3.23, the AF must indicate the service data flow description (traffic class, optionally destination MAC address of the TSN stream) to the PCF that the PCF uses to generate the PCC Rule. 3-4) Replace the 'Manageable Ethernet Port' with '5GS Bridge information' in parameters from SMF to PCF and from PCF to AF, as the information needs to convey also the Bridge ID and DS TT-UE residence time. The 5GS Bridge information can contain the Bridge address, UE-DS-TT residence time and zero or more Ethernet ports (port number and MAC address).","secretary_remarks":"Revision R14 of S2-2001817, merging S2-2001894, S2-2002058 and S2-2002228. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14920,"status":"agreed","reservation_date":"2020-02-28 13:25:13","uploaded":"2020-02-29 09:46:34","revisionof":"S2-2001817","revisedto":"","release":"Rel-16","crspec":"23.503","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":344.0,"crrevision":5.0,"crcategory":"F","tsg_crp":"SP-200077","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002579.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002580","title":"Clarification of TSN stream and traffic class","source":"NTT DOCOMO","contact":"Jari Mutikainen","contact-id":38346,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 5.28.2: replace the reference to 5.6.7 with clause 6.1.3.23 in TS 23.503.","secretary_remarks":"Revision R02 of S2-2001829. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14940,"status":"agreed","reservation_date":"2020-02-28 13:25:14","uploaded":"2020-02-29 09:46:32","revisionof":"S2-2001829","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2133.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002580.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002581","title":"UPF selection based on TSN parameters and context correction","source":"China Mobile","contact":"Dan Wang","contact-id":72661,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adds a bullet to clarify the bridge information configuration before PDU session establishment. Adds 'TSC Burst Size' parameter in TSN QoS information.","secretary_remarks":"Revision R01 of S2-2002264. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14960,"status":"agreed","reservation_date":"2020-02-28 13:25:15","uploaded":"2020-02-29 09:46:32","revisionof":"S2-2002264","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":2212.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200076","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002581.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2002604","title":"MDBV mapping and configuration for TSC QoS Flow","source":"Ericsson, China Mobile","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: In case the Maximum Burst Size of the aggregated TSC streams in the traffic class is provided by CNC via TSN AF to PCF, PCF can derive the required MDBV taking the Maximum Burst Size and TSCAI as input. If the default MDBV associated with a 5QI in the QoS mapping table can't satisfy the aggregated TSC Burst Size, the PCF provides the derived MDBV in the PCC rule and then the SMF performs QoS Flow binding.","secretary_remarks":"Revision R02 of S2-2002048. Approved","agenda_item_sort_order":32,"ainumber":"7.7.2","ainame":"5GS Enhanced support of Vertical and LAN Services - TSN aspects","tdoc_agenda_sort_order":14720,"status":"agreed","reservation_date":"2020-03-03 07:16:56","uploaded":"2020-03-03 07:17:57","revisionof":"S2-2002048","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.3.0","workitem":[{"winame":"Vertical_LAN"}],"crnumber":1980.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"SP-200075","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_137e_Electronic\/Docs\/S2-2002604.zip","group":"S2","meeting":"S2-ah-37776","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]