[{"name":"R5-212140","title":"TS 36.523-1 Tracker status after RAN5#91-e","source":"Samsung (Rapporteur)","contact":"Stoyan Baev","contact-id":2367,"tdoctype":"other","for":"Information","abstract":"Post-meeting","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":214000,"status":"available","reservation_date":"2021-04-29 14:23:42","uploaded":"2021-06-16 07:01:22","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212140.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-212142","title":"TS 36.523-1 Tracker status after RAN5#91-e","source":"Samsung (Rapporteur)","contact":"Stoyan Baev","contact-id":2367,"tdoctype":"other","for":"Information","abstract":"Post-meeting","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":214200,"status":"available","reservation_date":"2021-04-29 14:23:43","uploaded":"2021-06-16 07:01:22","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212142.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-212377","title":"FR2 Measurement Uncertainty (MU) and Test Tolerances (TT) Target Completion Update","source":"AT&T","contact":"Ronald Borsato","contact-id":86682,"tdoctype":"discussion","for":"Information","abstract":"Post Meeting Document that will collect the status of the FR2 MU + TT target completion dates at the conclusion of the FR2 MU + TT items at RAN5 #91-e.","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":237700,"status":"available","reservation_date":"2021-05-04 18:52:05","uploaded":"2021-05-31 11:11:28","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212377.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-212648","title":"RAN5#91-e summary of changes to RAN5 test cases with potential impact on GCF and PTCRB","source":"Ericsson, Samsung","contact":"Leif Mattisson","contact-id":10602,"tdoctype":"report","for":"Information","abstract":"Post meeting document","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":264800,"status":"available","reservation_date":"2021-05-06 13:46:56","uploaded":"2021-06-21 12:51:10","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212648.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-212650","title":"3GPP RAN5 CA status list  (post-RAN5#91-e meeting)","source":"Ericsson","contact":"Leif Mattisson","contact-id":10602,"tdoctype":"other","for":"Information","abstract":"Post meeting document","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":265000,"status":"available","reservation_date":"2021-05-06 13:46:56","uploaded":"2021-06-08 15:41:12","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212650.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-212659","title":"5GS progress report RAN5#91-e","source":"Ericsson","contact":"Leif Mattisson","contact-id":10602,"tdoctype":"WI status report","for":"Information","abstract":"Post meeting document","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":265900,"status":"available","reservation_date":"2021-05-06 13:46:56","uploaded":"2021-06-08 15:41:12","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212659.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-212660","title":"Update of RAN5 5G NR phases and target update RAN5#91-e","source":"Ericsson","contact":"Leif Mattisson","contact-id":10602,"tdoctype":"discussion","for":"Endorsement","abstract":"Post meeting document","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":266000,"status":"available","reservation_date":"2021-05-06 13:46:56","uploaded":"2021-06-21 12:51:10","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-212660.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-213282","title":"LS on FR2 relative power tolerance","source":"TSG WG RAN5","contact":"Flores Fernandez Martos","contact-id":47301,"tdoctype":"LS out","for":"Approval","abstract":"According to TS 38.101-2, relative power tolerance core requirements for FR2 Standalone defines under NOTE 2 in Table 6.3.4.3-2 that, for a target power level value P (PUMAX = P > Pint), for PUSCH to PUSCH transitions with the allocated resource blocks fixed in frequency and no transmission gaps other than those generated by downlink subframes, guard periods: for a power step ?P = 1 dB, the relative power tolerance for transmission is \u00b1 1.0 dB.\nHowever, such core requirement is not defined for a target power level P such that Pint = P = Pmin.\nRAN5 uses those requirements to define the achievable Uplink power window required in some test cases. \nActions: To: TSG RAN WG4. RAN5 asks RAN4 group to clarify which should be the value of relative power tolerance for PUSCH to PUSCH transitions for a power step ?P=1dB for the case Pint = P = Pmin.","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":328200,"status":"revised","reservation_date":"2021-05-07 18:30:06","uploaded":"2021-05-07 21:53:52","revisionof":"","revisedto":"R5-214106","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN WG4","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-213282.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-213370","title":"draft TR 38.918 v0.1.0","source":"CMCC","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"draft TR","for":"Endorsement","abstract":"AI 4.5.5.2\nfirst draft of the new TR","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2021-05-30 10:56:14","uploaded":"2021-06-08 15:41:13","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.918","crspecversion":"0.1.0","workitem":[{"winame":"FS_NR_Slice_Test"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-213370.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-213429","title":"LS on Emergency call after Authentication Failure","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"Yuchun","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":3429000,"status":"postponed","reservation_date":"2021-05-30 10:57:16","uploaded":"2021-06-21 12:51:10","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG CT1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-213429.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-213822","title":"LS on FR2 ETC testing","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":321510,"status":"approved","reservation_date":"2021-05-30 11:22:03","uploaded":"2021-05-31 11:11:29","revisionof":"R5-213215","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GCF CAG, PTCRB PVG","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-213822.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-214045","title":"LS on the clarification for the Test Applicability of E-UTRA anchor-agnostic approach applied test cases","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"Clarification has been made to the E-UTRA anchor-agnostic test cases in TS 38.521-3 during RAN5#91-e. It has been clarified \" E-UTRA anchor-agnostic test cases can be applied to EN-DC UE supporting \"xNR+yLTE\"(x=1, y=1) band combos. For a E-UTRA anchor-agnostic approach applied EN-DC UE supporting \"xNR+yLTE\" (x=1, y>1) band combos, test coverage is fulfilled by testing the UE with only 1 LTE CC configured. Besides, the E-UTRA anchor-agnostic test cases can be skipped, if the UE also supports SA and the corresponding SA test cases have been executed already. For further detailed information about E-UTRA anchor-agnostic approach, please refer to Section 4.6 and 4.7 in TS 38.521-3.\nUnless otherwise stated, the number of component carriers (CCs) listed in the test case titles of Clause 6 and clause 7 refer to the number of component carriers configured within the test case. Take \u201c7.4B.4_1.1 Maximum Input Level for Inter-Band EN-DC including FR2 (2 NR CCs)\u201d for example, \u201c2 NR CCs\u201d in the test case title means 2 NR CCs configured within the test cases.\nThe \u201cintra-band non-contiguous EN-DC\u201d test cases will also be clarified in RAN#5-92-e. \n-\tTake \u201c7.7B.2 Spurious Response for intra-band non-contiguous EN-DC in FR1 (2 CCs)\u201d for example, \u201c2 CCs\u201d will be clarified into \u201c1 NR CC\u201d in RAN5#92-e, which means 1 NR CC configured within the test cases. \n-\tTake \u201c7.8B.2.2   Wideband Intermodulation for intra-band non-contiguous EN-DC in FR1\u201d for example, \u201c1 NR CC\u201d will be added into the test case title in RAN5#92-e, which means 1 NR CC configured within the test cases.\nActions: To: GCF\/PTCRB: RAN5 requests GCF\/PTCRB group to take above into consideration when implement validation\/certification.","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":343900,"status":"postponed","reservation_date":"2021-05-30 11:26:20","uploaded":"2021-06-08 15:41:13","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GCF CAG, PTCRB PVG","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-214045.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-214106","title":"LS on FR2 relative power tolerance","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":34,"ainumber":"7.5","ainame":"\tDocs still needing agreement\/endorsement\/approval (e.g. Outgoing LS \/ Reports \/ New Specs \/ Info for certification bodies etc.)","tdoc_agenda_sort_order":328201,"status":"postponed","reservation_date":"2021-05-30 13:22:21","uploaded":"2021-06-08 15:41:13","revisionof":"R5-213282","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN WG4","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_91_Electronic\/Docs\/R5-214106.zip","group":"R5","meeting":"R5-91-e","year":2021,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]