[{"name":"SP-221215","title":"Rel-18\/ Rel-19 Planning","source":"MediaTek Inc.","contact":"Mehrdad Shariat","contact-id":97826,"tdoctype":"discussion","for":"Approval","abstract":"Related to both Agenda 7.3 and 7.4. Discussion on Rel-18 and Rel-19 Planning.","secretary_remarks":"_rev1 updated in CC#2 and revised to SP-221310.","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11760,"status":"revised","reservation_date":"2022-12-02 14:12:06","uploaded":"2022-12-07 13:17:10","revisionof":"","revisedto":"SP-221310","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221215.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221254","title":"Proposal on Release 18 timeline","source":"Deutsche Telekom AG, T-Mobile USA, KPN, Spark, Telecom Italia, Telstra, Vodafone","contact":"Johannes Achter","contact-id":94365,"tdoctype":"discussion","for":"Endorsement","abstract":"This contribution highlights some of the critical points and pressing issues in the overall project and urges the community to re-evaluate the current Release 18 timeline, specifically to act responsibly to ensure quality specifications at the freeze date","secretary_remarks":"CC#2: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11830,"status":"noted","reservation_date":"2022-12-04 09:49:47","uploaded":"2022-12-07 15:59:55","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221254.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221282","title":"Rel-18 & Rel-19 Planning","source":"HuaWei Technologies Co., Ltd","contact":"Wenruo Zhu","contact-id":34326,"tdoctype":"discussion","for":"Discussion","abstract":"This paper is to discuss about Rel-18 timeline and Rel-19 planning.","secretary_remarks":"CC#2: Noted. CC#4: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11840,"status":"noted","reservation_date":"2022-12-07 09:02:50","uploaded":"2022-12-07 12:32:11","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221282.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221290","title":"Proposal on Rel-18 timeline and Rel-19 Planning","source":"China Mobile","contact":"Tao Sun","contact-id":70932,"tdoctype":"discussion","for":"Endorsement","abstract":"This paper proposes to keep current R18 timeline based on observations as well as to provide R19 plan in 2023. The discussion of R18 timeline tightly related with R19 planning, therefore, this paper covers both AI#7.3 and #7.4.","secretary_remarks":"CC#2: Noted. CC#4: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11850,"status":"noted","reservation_date":"2022-12-07 15:20:12","uploaded":"2022-12-07 16:54:34","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221290.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221292","title":"Rel-18 stage 2 freeze considerations","source":"Nokia, Nokia Shanghai Bell, Kontron Transportation France, UIC, Ericsson","contact":"Yannick Lair","contact-id":76350,"tdoctype":"discussion","for":"Endorsement","abstract":"This contribution provides some facts on Rel-18 progress in SA WG2 and proposes to move stage 2 freeze for Rel-18 to June 2023.","secretary_remarks":"CC#2: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11860,"status":"noted","reservation_date":"2022-12-07 15:45:52","uploaded":"2022-12-07 20:12:43","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221292.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221296","title":"SA WG2 Chair inputs on Rel-18 Progress","source":"SA WG2 Chair","contact":"Puneet Jain","contact-id":95561,"tdoctype":"discussion","for":"Endorsement","abstract":"This document provides SA WG2 Chair inputs on Rel-18 Progress and TU analysis. It proposes a way forward on Rel-18 study items that still have an outstanding issues.","secretary_remarks":"CC#2: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11870,"status":"noted","reservation_date":"2022-12-07 21:33:20","uploaded":"2022-12-07 21:42:46","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221296.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221307","title":"Proposal for Rel-18 Timeline (SA perspective) without shift of freeze dates","source":"TSG SA Chair","contact":"Georg Mayer","contact-id":9175,"tdoctype":"discussion","for":"Endorsement","abstract":"Proposal for Rel-18 Timeline (SA perspective) without shift of freeze dates","secretary_remarks":"Created at meeting. CC#2: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11880,"status":"noted","reservation_date":"2022-12-14 08:28:35","uploaded":"2022-12-14 13:19:04","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221307.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221308","title":"TSG CT view on Rel-18 Planning","source":"TSG CT Chair","contact":"Lionel Morand","contact-id":25150,"tdoctype":"discussion","for":"Discussion","abstract":"CT view on possible Rel-18 Stage 2 extension: Hardline: - Ensure 9 months between stage 2 freeze and the stage 3 freeze - To grant enough time for TSG cross-coordination. - For CT, Stage 2 requirements coming from SA2 but also from SA3, SA4, SA5, SA6 - Ensure 3 months between stage 3 freeze and ASN.1\/OpenAPI freeze - To avoid protocol backward incompatible change and provide some buffer protocol consolidation - Common CT stage 3\/RAN functional freeze date and ASN.1\/OpenAPI freeze date If Stage 2 freeze date is maintained - The number of Stage 2 WI exceptions should remain \"under control\" - Having too many stage 2 WI exceptions would mean a stage 3 done in only 6 months, which would contradict the 9 months hardine. If Stage 2 freeze date shifted by X months - Stage 3 AND ASN.1\/OpenAPI freeze dates MUST be shifted by X months - Limited stage 2 WI exceptions should be allowed after the stage 2 freeze","secretary_remarks":"Created at meeting. CC#2: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11890,"status":"noted","reservation_date":"2022-12-14 09:12:19","uploaded":"2022-12-14 09:31:42","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221308.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221310","title":"Rel-18\/ Rel-19 Planning","source":"MediaTek Inc.","contact":"Mehrdad Shariat","contact-id":97826,"tdoctype":"discussion","for":"Approval","abstract":"Related to both Agenda 7.3 and 7.4. Discussion on Rel-18 and Rel-19 Planning.","secretary_remarks":"Revision of SP-221215_rev1. CC#2: Endorsed. CC#3: _rev1 Revised to SP-221318","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11770,"status":"revised","reservation_date":"2022-12-14 17:48:44","uploaded":"2022-12-14 17:49:08","revisionof":"SP-221215","revisedto":"SP-221318","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221310.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221311","title":"RAN Planning","source":"TSG RAN Chair, RAN WG1 Chair, RAN WG2 Chair, RAN WG3 Chair, RAN WG4 Chair, RAN WG5 Chair","contact":"Wanshi Chen","contact-id":58158,"tdoctype":"discussion","for":"Approval","abstract":"Endorsed RAN meeting planning (2023). Proposal: No change to the original RAN Rel-18 timeline, i.e.: Target Sept 2023 for RAN WG1 functional freeze Target Dec 2023 for RAN WG2\/3\/4 functional freeze Target Mar 2024 for ASN.1 freeze For better Rel-18 RAN specification stability, RAN WG1: 4Q 2023 is fully dedicated to Rel-18 maintenance RAN WG2\/3\/4: 1Q 2024 is fully dedicated to Rel-18 maintenance Target RAN R19 RAN WG1\/2\/3 package approval in Dec 23 (RAN#102) and RAN WG4 package approval in Mar 24 (RAN#103)","secretary_remarks":"Created at meeting. Joint SA-RAN-CT CC: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11800,"status":"noted","reservation_date":"2022-12-14 17:48:45","uploaded":"2022-12-14 17:49:08","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221311.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221315","title":"3GPP SA, RAN, CT Rel-18 Timeline","source":"TSG SA Chair","contact":"Georg Mayer","contact-id":9175,"tdoctype":"discussion","for":"Endorsement","abstract":"3GPP SA, RAN, CT Rel-18 Timeline","secretary_remarks":"Created at meeting. Joint SA-RAN-CT CC: _rev1 revised to SP-221317.","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11810,"status":"revised","reservation_date":"2022-12-15 12:41:50","uploaded":"2022-12-15 12:42:13","revisionof":"","revisedto":"SP-221317","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221315.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221317","title":"3GPP SA, RAN, CT Rel-18 Timeline","source":"TSG SA Chair","contact":"Georg Mayer","contact-id":9175,"tdoctype":"discussion","for":"Endorsement","abstract":"3GPP SA, RAN, CT Rel-18 Timeline","secretary_remarks":"Revision of SP-221315_rev1. Endirsed in Joint SA-RAN-CT CC.","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11820,"status":"endorsed","reservation_date":"2022-12-16 07:08:37","uploaded":"2022-12-16 07:09:16","revisionof":"SP-221315","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221317.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221318","title":"A guidance to SA WG2 on Rel-18 study\/work items","source":"SA WG2 Chair","contact":"Puneet Jain","contact-id":95561,"tdoctype":"discussion","for":"Approval","abstract":"Guidance to SA WG2 on Rel-18 study\/work items","secretary_remarks":"Based on Revision of SP-221310_rev1. CC#4: _rev1 endorsed. Revised to SP-221349.","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11780,"status":"revised","reservation_date":"2022-12-16 07:08:38","uploaded":"2022-12-16 07:09:16","revisionof":"SP-221310","revisedto":"SP-221349","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221318.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221319","title":"Notes from Joint SGs SA-RAN-CT Rel-18 Timeline Conference Call","source":"TSG SA Secretary","contact":"Maurice Pope","contact-id":648,"tdoctype":"report","for":"Information","abstract":"Notes from Joint SGs SA-RAN-CT Rel-18 Timeline Conference Call","secretary_remarks":"CC#4: Noted","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11900,"status":"noted","reservation_date":"2022-12-16 07:08:38","uploaded":"2022-12-16 07:13:38","revisionof":"","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221319.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-221349","title":"A guidance to SA WG2 on Rel-18 study\/work items","source":"SA WG2 Chair","contact":"Puneet Jain","contact-id":95561,"tdoctype":"discussion","for":"Approval","abstract":"Guidance to SA WG2 on Rel-18 study\/work items","secretary_remarks":"Revision of SP-221318_rev1. Endorsed","agenda_item_sort_order":44,"ainumber":"7.3","ainame":"Release 18 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11790,"status":"endorsed","reservation_date":"2022-12-16 17:50:13","uploaded":"2022-12-16 17:50:36","revisionof":"SP-221318","revisedto":"","release":"Rel-18","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_98E_Electronic_2022-12\/Docs\/SP-221349.zip","group":"SP","meeting":"SP-98-e","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]