[{"name":"SP-190986","title":"OTT delivery of Linear, live and on-demand PUBLIC SERVICE MEDIA content","source":"EBU","contact":"Roland Beutler","contact-id":63720,"tdoctype":"discussion","for":"Presentation","abstract":"Conclusions: In order to complete the full intended scope of FS_5MBS, including Objective: B, we support an 18-month time period for Release 17","secretary_remarks":"Feature specific. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12180,"status":"noted","reservation_date":"2019-11-27 14:24:06","uploaded":"2019-12-02 11:17:48","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-190986.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191054","title":"Report from moderated email discussion on Item FS_5G_SAT_ARCH","source":"THALES (rapporteur)","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"report","for":"Information","abstract":"Report from moderated email discussion on Item FS_5G_SAT_ARCH","secretary_remarks":"Revised in SP-191253","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11770,"status":"revised","reservation_date":"2019-12-02 10:53:44","uploaded":"2019-12-05 22:21:35","revisionof":"","revisedto":"SP-191253","release":"Rel-16","crspec":23.737,"crspecversion":"","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191054.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191116","title":"Support for Public Safety Needs in Rel17","source":"FirstNet, AT&T, SyncTechno Inc., UK HO, French MoI , Nkom","contact":"Ihab Guirguis","contact-id":65302,"tdoctype":"discussion","for":"Endorsement","abstract":"Identify high priority topics and work tasks in Release 17 to support Public Safety needs. The high priority topics include 5G_ProSe, 5BMS, 5GSAT_ARCH, and eLCS_ph2.","secretary_remarks":"Feature specific. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12170,"status":"noted","reservation_date":"2019-12-03 02:22:12","uploaded":"2019-12-03 02:26:21","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191116.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191198","title":"Report from moderated email discussion on 'Study on Support for 5WWC, Phase 2'","source":"BROADCOM CORPORATION","contact":"Florin Baboescu","contact-id":45772,"tdoctype":"report","for":"Decision","abstract":"This document is the summary of the corresponding moderated email discussion in SA Drafts reflector according to the principles agreed in SP-190950 with regard to the working tasks of 'Study on Support for 5WWC, Phase 2'.","secretary_remarks":"Revised to SP-191333.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11820,"status":"revised","reservation_date":"2019-12-04 19:27:58","uploaded":"2019-12-05 21:58:11","revisionof":"","revisedto":"SP-191333","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191198.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191201","title":"Potential Rel-17 SA5 OAM work","source":"SA WG5 Vice Chairman","contact":"Lan Zou","contact-id":35534,"tdoctype":"discussion","for":"Information","abstract":"Consideration of SA WG5 OAM work in Rel-17","secretary_remarks":"SA WG5 specific. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12210,"status":"noted","reservation_date":"2019-12-05 01:17:37","uploaded":"2019-12-05 01:24:06","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191201.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191214","title":"Report from moderated email discussion on study item FS_5GLAN_enh","source":"InterDigital Belgium. LLC","contact":"Saad Ahmad","contact-id":72120,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on study item FS_5GLAN_enh","secretary_remarks":"Revised to SP-191293.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11920,"status":"revised","reservation_date":"2019-12-05 09:26:29","uploaded":"2019-12-05 19:00:44","revisionof":"","revisedto":"SP-191293","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191214.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191215","title":"Report from moderated email discussion on Item FS_5G_ProSe","source":"OPPO (Moderator)","contact":"Jianhua Liu","contact-id":72698,"tdoctype":"report","for":"Discussion","abstract":"Report from email discussion for FS_5G_ProSe.","secretary_remarks":"Wrong version uploaded. Revised to SP-191274.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11610,"status":"revised","reservation_date":"2019-12-05 10:14:52","uploaded":"2019-12-06 12:07:26","revisionof":"","revisedto":"SP-191274","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191215.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191216","title":"Report from moderated email discussion on Item FS_IIoT","source":"Nokia","contact":"Miikka Poikselka","contact-id":69935,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on Item FS_IIoT","secretary_remarks":"Revised to SP-191288.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11740,"status":"revised","reservation_date":"2019-12-05 10:32:57","uploaded":"2019-12-08 13:35:16","revisionof":"","revisedto":"SP-191288","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191216.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191218","title":"Report from moderated email discussion on FS_5MBS","source":"Huawei Tech.(UK) Co., Ltd","contact":"Dario Serafino Tonesi","contact-id":43468,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on FS_5MBS","secretary_remarks":"Revised to SP-191284.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11640,"status":"revised","reservation_date":"2019-12-05 10:39:52","uploaded":"2019-12-05 18:59:19","revisionof":"","revisedto":"SP-191284","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191218.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191221","title":"Report from moderated email discussion on Item FS_eLCS_ph2","source":"CATT","contact":"Ming Ai","contact-id":40862,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on Item FS_eLCS_ph2","secretary_remarks":"Revised to SP-191269.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11890,"status":"revised","reservation_date":"2019-12-05 12:38:25","uploaded":"2019-12-06 07:02:05","revisionof":"","revisedto":"SP-191269","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eLCS_ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191221.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191225","title":"TIM view on Rel17","source":"TELECOM ITALIA S.p.A.","contact":"Maria Pia Galante","contact-id":16712,"tdoctype":"discussion","for":"Discussion","abstract":"Summary & rationale of priorities expressed by TIM on Rel17 SA WG2 activities. - Further thoughts on Rel-17 planning - Set the deadline first, then prioritize the content accordingly - Shorter-cycle release fits better in current times of fast-paced innovation - Current agreement (15 months lenght) is a reasonable compromise and should be confirmed - Exceptions will lead to an \u00ab18 months\u00bb actual lenght, anyway\u2026 - Encourage SA WG2 alignments with downstream groups as soon as possible - Increase coordination between SA WG2 and other SA WGs via e.g. conf call, joint sessions, \u2026 on selected topics: - with SA WG5 in the area of Network Analytics, Network Slicing,\u2026 - with SA WG6 in the area of Edge Computing,\u2026","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12140,"status":"noted","reservation_date":"2019-12-05 15:27:02","uploaded":"2019-12-05 15:45:23","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191225.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191226","title":"Report from moderated email discussion on FS_MUSIM","source":"Intel (moderator)","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"report","for":"Decision","abstract":"Report from moderated email discussion on FS_MUSIM","secretary_remarks":"Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11760,"status":"noted","reservation_date":"2019-12-05 15:46:31","uploaded":"2019-12-05 20:59:58","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191226.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191227","title":"Extending R17, Stage 2","source":"Siemens AG","contact":"Joachim Walewski","contact-id":69751,"tdoctype":"discussion","for":"Decision","abstract":"We propose and motivate an extension of R17, Stage 2, until December 2020.","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12130,"status":"noted","reservation_date":"2019-12-05 15:58:04","uploaded":"2019-12-05 16:06:05","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191227.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191228","title":"Report from moderated email discussion on FS_UPCAS","source":"China Mobile (moderator)","contact":"Tao Sun","contact-id":79890,"tdoctype":"report","for":"Discussion","abstract":"Summary the feedback on FS_UPCAS and propose a way forward","secretary_remarks":"Revised to SP-191276.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11840,"status":"revised","reservation_date":"2019-12-05 16:16:13","uploaded":"2019-12-06 19:17:49","revisionof":"","revisedto":"SP-191276","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191228.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191230","title":"Report on moderated email discussion on FS_eNA_Ph2","source":"Samsung R&D Institute UK","contact":"Andy Bennett","contact-id":70253,"tdoctype":"report","for":"Decision","abstract":"Report on the moderated email discussion on FS_eNA_Ph2 prior to SA#86","secretary_remarks":"Revised to SP-191285.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11660,"status":"revised","reservation_date":"2019-12-05 16:59:34","uploaded":"2019-12-05 19:28:34","revisionof":"","revisedto":"SP-191285","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191230.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191231","title":"Principles for SA WG2 Rel-17 prioritization","source":"Samsung R&D Institute UK","contact":"Andy Bennett","contact-id":70253,"tdoctype":"discussion","for":"Agreement","abstract":"Some basic principles on how to progress the prioritization discussions in SA#86. Proposals It is proposed to agree and apply following principles for SA WG2 Rel-17 prioritization: - Proposal #1: Downscoping of the IN items shall be carried out first. - Proposal #2: Downscoping of the IN* items will be carried out only if the downscoping of the IN items bring the number of TU's below the number available in Release 17. - Proposal #3: Once the IN* items have been downscoped then one or more of them can be considered for inclusion in Release 17.","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12150,"status":"noted","reservation_date":"2019-12-05 17:01:50","uploaded":"2019-12-05 17:33:37","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191231.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191232","title":"R17 Time Schedule Revisit and Proposal","source":"China Mobile, AT&T, Telstra, KPN, BT, China Telecom , Telefonica, Broadcom, Motorola Mobility, Lenovo, Interdigital","contact":"Tao Sun","contact-id":79890,"tdoctype":"discussion","for":"Approval","abstract":"Discuss the situation of the R17 time plan. Suggest to set the R17 Stage 2 target date as December 2020. - Proposals to agree on a practical schedule for Rel-17 - Proposal 1: Stage 2 target date December 2020 - Proposal 2: Stage 3 target date September 2021 (3 quarters gap to finish the stage 3 work)","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12120,"status":"noted","reservation_date":"2019-12-05 17:05:25","uploaded":"2019-12-05 18:47:02","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191232.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191235","title":"Report from moderated email discussion on FS_enh_EC","source":"Futurewei Technologies","contact":"Tony Saboorian","contact-id":82269,"tdoctype":"report","for":"Decision","abstract":"Report from moderated email discussion on FS_enh_EC","secretary_remarks":"Revised to SP-191286.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11690,"status":"revised","reservation_date":"2019-12-05 17:21:42","uploaded":"2019-12-06 04:30:15","revisionof":"","revisedto":"SP-191286","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191235.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191236","title":"Analysis on available TU for Rel-17","source":"ZTE Corporation","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"discussion","for":"Decision","abstract":"This paper provide analysis on the available TU for Rel17 and propose to extend 18 months for Rel 17. Proposal: we propose to extend the Rel-17 to at least 18 months, - In order to provide possibility that all key WTs in big IN items can be included in Rel-17 - Additional 6 TU can be allocated for some big items - Simplify SA discussion on down scope for the IN items - In order to give chance for the IN* items to be included in Rel-17 - There are big interest from industry for the IN* items. - SA#85 agreed 'SA has the intention to accommodate as many in* items as possible in R17.'","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12100,"status":"noted","reservation_date":"2019-12-05 17:52:38","uploaded":"2019-12-05 17:56:24","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191236.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191238","title":"Proposed way forward on the EnTV for the 5MBS","source":"ABS, Qualcomm, ZTE","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"discussion","for":"Decision","abstract":"This paper propose one way forward on the prioritization of 5MBS. Proposal It is proposed that WT#3.1 is included in the Rel-17 with the downscoping proposed in slide 7 - Transparent transport mode is support in the Rel-17 - Full service mode can be studied in SA WG4 (if needed) - Switch between unicast and broadcast is postponed to next release","secretary_remarks":"Feature specific. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12190,"status":"noted","reservation_date":"2019-12-05 17:55:07","uploaded":"2019-12-05 17:56:24","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191238.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191239","title":"Report from moderated email discussion on FS_ATSSS_Ph2","source":"Apple","contact":"Krisztian Kiss","contact-id":57762,"tdoctype":"report","for":"Decision","abstract":"Report from moderated email discussion on FS_ATSSS_Ph2","secretary_remarks":"Revised to SP-191291.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11870,"status":"revised","reservation_date":"2019-12-05 18:02:41","uploaded":"2019-12-06 07:40:43","revisionof":"","revisedto":"SP-191291","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191239.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191241","title":"Consideration for SA WG2 Rel-17 Prioritization","source":"Futurewei Technologies","contact":"Tony Saboorian","contact-id":82269,"tdoctype":"discussion","for":"Agreement","abstract":"It is proposed that SA plenary make a decision on Release 17 Stage-2 timeline as a first step before proceeding with Downscoping and Prioritization of Work Tasks of IN and IN* items.","secretary_remarks":"Feature specific. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12160,"status":"noted","reservation_date":"2019-12-05 18:15:48","uploaded":"2019-12-05 18:37:41","revisionof":"","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191241.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191243","title":"Release 17 Time Schedule","source":"Huawei, China Mobile, China Telecom, China Unicom, Hisilicon, CATT, CAICT, OPPO, ZTE, XiaoMi, Tencent, ABS, Sennheiser, Futurewei, Interdigital, Thales, Toyota Motor Corporation","contact":"Dario Serafino Tonesi","contact-id":43468,"tdoctype":"discussion","for":"Approval","abstract":"Release 17 Time Schedule proposal. Proposal: It is proposed that SA discuss and agree on a more practical and reasonable schedule for Rel-17 that will accommodate market priorities - Include features for both MBB enhancement and vertical enablement - Include Public Safety requirements - Set Target date for stage 2 freeze as December 2020 - Set Target date for state 3 completion for Rel-17 as September 2021 (maintain 3 quarters gap to finish the stage 3 work)","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12110,"status":"noted","reservation_date":"2019-12-05 18:46:41","uploaded":"2019-12-05 18:59:19","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191243.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191244","title":"Report from moderated email discussion on FS_eNPN","source":"Nanjing Ericsson Panda Com Ltd","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"report","for":"Discussion","abstract":"Report on the moderated discussion for FS_eNPN","secretary_remarks":"Revised to SP-191287.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11710,"status":"revised","reservation_date":"2019-12-05 18:54:13","uploaded":"2019-12-06 15:26:24","revisionof":"","revisedto":"SP-191287","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191244.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191246","title":"Report from moderated email discussion on FS_ID-UAS","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"report","for":"Approval","abstract":"Report from the moderated email discussion for FS_ID_UAS","secretary_remarks":"Revised to SP-191294.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11940,"status":"revised","reservation_date":"2019-12-05 19:12:31","uploaded":"2019-12-05 20:27:58","revisionof":"","revisedto":"SP-191294","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_ID_UAS_SA2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191246.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191251","title":"Report from moderated email discussion on FS_MPS2","source":"AT&T","contact":"Farooq Bari","contact-id":57133,"tdoctype":"report","for":"Information","abstract":"The document consolidates discussion from SA_DRAFT email list about Release 17 work on FS_MPS2.","secretary_remarks":"Revised to SP-191326.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11960,"status":"revised","reservation_date":"2019-12-05 19:47:15","uploaded":"2019-12-06 18:14:53","revisionof":"","revisedto":"SP-191326","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191251.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191253","title":"Report from moderated email discussion on FS_5GSAT_ARCH","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"WITHDRAWN:","secretary_remarks":"Revision of SP-191054. WITHDRAWN","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11780,"status":"withdrawn","reservation_date":"2019-12-05 22:33:16","uploaded":"2019-12-05 22:38:04","revisionof":"SP-191054","revisedto":"","release":"Rel-17","crspec":23.737,"crspecversion":"1.1.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191253.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191254","title":"Release 17 Time Schedule","source":"Nanjing Ericsson Panda Com Ltd","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"discussion","for":"Agreement","abstract":"Release 17 Time Schedule. Proposed way forward: - Keep the 15 month release planning as agreed in TSG#83 joint RAN and SA meeting. - Selectively prioritizing functionality, giving opportunities for new markets and services. - De-prioritize and postpone 'optimizations' to Rel-18. - Utilize the good planning tools we have in 3GPP with objectives in SID\/WID and Exception Requests, as needed.","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12090,"status":"noted","reservation_date":"2019-12-05 22:35:53","uploaded":"2019-12-05 22:46:11","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191254.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191256","title":"Report from moderated email discussion on FS_5GSAT_ARCH","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"report","for":"Approval","abstract":"This document is the summary of the moderated email discussion in SA Drafts reflector according to the principles agreed in SP-190950","secretary_remarks":"Revised to SP-191257.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11790,"status":"revised","reservation_date":"2019-12-05 22:45:15","uploaded":"2019-12-05 22:52:08","revisionof":"","revisedto":"SP-191257","release":"Rel-17","crspec":23.737,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191256.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191257","title":"Report from moderated email discussion on FS_5GSAT_ARCH","source":"Thales S.A. (Moderator)","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"report","for":"Approval","abstract":"This document is the summary of the moderated email discussion in SA Drafts reflector according to the principles agreed in SP-190950","secretary_remarks":"Revision of SP-191256. Revised to SP-191289.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11800,"status":"revised","reservation_date":"2019-12-06 08:37:12","uploaded":"2019-12-06 18:05:05","revisionof":"SP-191256","revisedto":"SP-191289","release":"Rel-17","crspec":23.737,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191257.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191258","title":"Inputs on Rel-17 prioritization","source":"SA WG2 Chairman","contact":"Puneet Jain","contact-id":36283,"tdoctype":"other","for":"Agreement","abstract":"At SA WG2#136 meeting, the SA WG2 work plan was discussed (in S2-1912781 [1]) and following observations can be made: {. . .}","secretary_remarks":"General\/timeline. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11980,"status":"noted","reservation_date":"2019-12-06 08:40:06","uploaded":"2019-12-06 08:41:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191258.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191267","title":"TSG SA Chairman's View and Proposals for Rel-17 Timeline and Content Planning","source":"TSG SA Chairman","contact":"Georg Mayer","contact-id":9175,"tdoctype":"discussion","for":"Endorsement","abstract":"TSG SA Chairman's View and Proposals for Rel 17 Timeline and Content Planning. The following is proposed to be endorsed \/ approved by TSG SA: 1) The freeze time for Rel-17 SA WG2 work is December 2020. 2) After this freeze work will progress as usual, i.e. exceptions will be granted if they can be approved. 3) The freeze time for Rel-17 stage 3 work is September 2021 (ASN.1\/coding: December 2021). 4) The roughly 50 time units gained due to the two 'additional' meetings in Q4\/2020 should be split as follows by TSG SA and SA WG2: a. 25 TUs more to work on additional work tasks and\/or items on the in\/in* lists as well as on items that might be added due to synchronization with RAN. b. 25 TUs as a generic buffer which needs to be used to guarantee that Rel-16 is completed in a stable way and that Rel-17 maintenance is kept at a low level once frozen. Note that item 3 can only be endorsed by TSG SA and needs to be approved by the TSG SA\/TSG RAN joint session.","secretary_remarks":"Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11990,"status":"noted","reservation_date":"2019-12-09 09:25:38","uploaded":"2019-12-10 06:22:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191267.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191268","title":"Overview of SA WG2 Rel-17 Work Tasks","source":"TSG SA Chairman","contact":"Georg Mayer","contact-id":9175,"tdoctype":"discussion","for":"Information","abstract":"Overview of SA WG2 Rel-17 Work Tasks","secretary_remarks":"WITHDRAWN","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12080,"status":"withdrawn","reservation_date":"2019-12-09 09:25:38","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191269","title":"Report from moderated email discussion on Item FS_eLCS_ph2","source":"CATT","contact":"Ming Ai","contact-id":40862,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on Item FS_eLCS_ph2","secretary_remarks":"Revision of SP-191221. Revised to SP-191292.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11900,"status":"revised","reservation_date":"2019-12-09 10:22:41","uploaded":"2019-12-11 07:46:55","revisionof":"SP-191221","revisedto":"SP-191292","release":"Rel-17","crspec":"","crspecversion":"","workitem":[{"winame":"FS_eLCS_ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191269.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191274","title":"Report from moderated email discussion on Item FS_5G_ProSe","source":"OPPO (Moderator)","contact":"Jianhua Liu","contact-id":72698,"tdoctype":"report","for":"Discussion","abstract":"Report from email discussion for FS_5G_ProSe.","secretary_remarks":"Revision of SP-191215. Revised to SP-191283.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11620,"status":"revised","reservation_date":"2019-12-09 11:29:32","uploaded":"2019-12-09 11:30:00","revisionof":"SP-191215","revisedto":"SP-191283","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191274.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191276","title":"Report from moderated email discussion on FS_UPCAS","source":"China Mobile (moderator)","contact":"Tao Sun","contact-id":79890,"tdoctype":"report","for":"Discussion","abstract":"Summary the feedback on FS_UPCAS and propose a way forward","secretary_remarks":"Revision of SP-191228. Revised to SP-191290.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11850,"status":"revised","reservation_date":"2019-12-10 11:04:54","uploaded":"2019-12-10 13:07:36","revisionof":"SP-191228","revisedto":"SP-191290","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191276.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191283","title":"Report from moderated email discussion on Item FS_5G_ProSe","source":"OPPO (Moderator)","contact":"Jianhua Liu","contact-id":72698,"tdoctype":"report","for":"Discussion","abstract":"Report from email discussion for FS_5G_ProSe.","secretary_remarks":"Revision of SP-191274. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11630,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-13 10:03:51","revisionof":"SP-191274","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191283.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191284","title":"Report from moderated email discussion on FS_5MBS","source":"Huawei Tech.(UK) Co., Ltd","contact":"Dario Serafino Tonesi","contact-id":43468,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on FS_5MBS","secretary_remarks":"Revision of SP-191218. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11650,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":null,"revisionof":"SP-191218","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191285","title":"Report on moderated email discussion on FS_eNA_Ph2","source":"Samsung R&D Institute UK","contact":"Andy Bennett","contact-id":70253,"tdoctype":"report","for":"Decision","abstract":"Report on the moderated email discussion on FS_eNA_Ph2 prior to SA#86","secretary_remarks":"Revision of SP-191230. Revised to SP-191329.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11670,"status":"revised","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-11 14:59:45","revisionof":"SP-191230","revisedto":"SP-191329","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191285.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191286","title":"Report from moderated email discussion on FS_enh_EC","source":"Futurewei Technologies","contact":"Tony Saboorian","contact-id":82269,"tdoctype":"report","for":"Decision","abstract":"Report from moderated email discussion on FS_enh_EC","secretary_remarks":"Revision of SP-191235. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11700,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-11 09:32:06","revisionof":"SP-191235","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191286.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191287","title":"Report from moderated email discussion on FS_eNPN","source":"Nanjing Ericsson Panda Com Ltd","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"report","for":"Discussion","abstract":"Report on the moderated discussion for FS_eNPN","secretary_remarks":"Revision of SP-191244. This was noted.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-13 10:03:04","revisionof":"SP-191244","revisedto":"SP-191349","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191287.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191288","title":"Report from moderated email discussion on Item FS_IIoT","source":"Nokia","contact":"Miikka Poikselka","contact-id":69935,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on Item FS_IIoT","secretary_remarks":"Revision of SP-191216. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11750,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-11 09:32:06","revisionof":"SP-191216","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191288.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191289","title":"Report from moderated email discussion on FS_5GSAT_ARCH","source":"Thales S.A. (Moderator)","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"report","for":"Approval","abstract":"This document is the summary of the moderated email discussion in SA Drafts reflector according to the principles agreed in SP-190950","secretary_remarks":"Revision of SP-191257. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11810,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-11 09:32:06","revisionof":"SP-191257","revisedto":"","release":"Rel-17","crspec":23.737,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191289.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191290","title":"Report from moderated email discussion on FS_UPCAS","source":"China Mobile (moderator)","contact":"Tao Sun","contact-id":79890,"tdoctype":"report","for":"Discussion","abstract":"Summary the feedback on FS_UPCAS and propose a way forward","secretary_remarks":"Revision of SP-191276. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11860,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-11 09:32:06","revisionof":"SP-191276","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191290.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191291","title":"Report from moderated email discussion on FS_ATSSS_Ph2","source":"Apple","contact":"Krisztian Kiss","contact-id":57762,"tdoctype":"report","for":"Decision","abstract":"Report from moderated email discussion on FS_ATSSS_Ph2","secretary_remarks":"Revision of SP-191239. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11880,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-13 10:02:28","revisionof":"SP-191239","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191291.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191292","title":"Report from moderated email discussion on Item FS_eLCS_ph2","source":"CATT","contact":"Ming Ai","contact-id":40862,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on Item FS_eLCS_ph2","secretary_remarks":"Revision of SP-191269. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11910,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-11 09:32:06","revisionof":"SP-191269","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191292.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191293","title":"Report from moderated email discussion on study item FS_5GLAN_enh","source":"InterDigital Belgium. LLC","contact":"Saad Ahmad","contact-id":72120,"tdoctype":"report","for":"Discussion","abstract":"Report from moderated email discussion on study item FS_5GLAN_enh","secretary_remarks":"Revision of SP-191214. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11930,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":null,"revisionof":"SP-191214","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191294","title":"Report from moderated email discussion on FS_ID-UAS","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":84603,"tdoctype":"report","for":"Approval","abstract":"Report from the moderated email discussion for FS_ID_UAS","secretary_remarks":"Revision of SP-191246. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11950,"status":"noted","reservation_date":"2019-12-10 16:55:40","uploaded":"2019-12-15 13:15:11","revisionof":"SP-191246","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191294.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191295","title":"Rel-17 prioritization for SA WG2","source":"SA WG2 Chairman","contact":"Puneet Jain","contact-id":36283,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward: - Reduce 2 TUs from FS_5MBS study phase. - Determine whether FS_eNS_ph2, FS_eV2XARC_ph2 needs to be down scoped. - Agree that FS_eNPN, FS_5G_ProSe and FS_5MBS will be granted 1Qtr exception. - Agree that at maximum 1 Qtr exception will be granted. - Determine additional Available TU to be allocated to which IN* item. - There is scope to add only 1 IN* item unless further down scoping of IN items is undertaken.","secretary_remarks":"Revised to SP-191296.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12000,"status":"revised","reservation_date":"2019-12-11 07:45:54","uploaded":"2019-12-11 09:32:06","revisionof":"","revisedto":"SP-191296","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191295.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191296","title":"Rel-17 prioritization for SA WG2","source":"SA WG2 Chairman","contact":"Puneet Jain","contact-id":36283,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward: - Reduce 2 TUs from FS_5MBS study phase. - Determine whether FS_eNS_ph2, FS_eV2XARC_ph2 needs to be down scoped. - Agree that FS_eNPN, FS_5G_ProSe and FS_5MBS will be granted 1Qtr exception. - Agree that at maximum 1 Qtr exception will be granted. - Determine additional Available TU to be allocated to which IN* item. - There is scope to add only 1 IN* item unless further down scoping of IN items is undertaken.","secretary_remarks":"Revision of SP-191295. This was revised to take into account the Work Task adjustments drafting during Friday lunchtime in SP-191377.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12010,"status":"revised","reservation_date":"2019-12-11 09:31:24","uploaded":"2019-12-11 14:59:23","revisionof":"SP-191295","revisedto":"SP-191377","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191296.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191297","title":"Way forward for WWC","source":"Broadcom, Apple","contact":"Florin Baboescu","contact-id":45772,"tdoctype":"discussion","for":"Agreement","abstract":"Way forward for WWC","secretary_remarks":"Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12200,"status":"noted","reservation_date":"2019-12-11 14:52:51","uploaded":"2019-12-11 14:59:23","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191297.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191300","title":"IN* Package Discussion","source":"China Mobile","contact":"Tao Sun","contact-id":79890,"tdoctype":"discussion","for":"Information","abstract":"In* Discussion report. Proposal: - Put all in* as a package included in R17 and set R17 Phase 2 deadline as Dec. 2020. NOTE: The IN* items are request to reduce the Work Task to fill in the TUs with 30 as total.","secretary_remarks":"Revised to SP-191301.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12040,"status":"revised","reservation_date":"2019-12-11 14:52:52","uploaded":"2019-12-11 14:59:23","revisionof":"","revisedto":"SP-191301","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191300.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191301","title":"IN* Package Discussion","source":"China Mobile","contact":"Tao Sun","contact-id":79890,"tdoctype":"discussion","for":"Information","abstract":"In* Discussion report. Proposal: - Put all in* as a package included in R17 and set R17 Phase 2 deadline as Dec. 2020. NOTE: The IN* items are request to reduce the Work Task to fill in the TUs with 30 as total.","secretary_remarks":"Revision of SP-191300. Revised to SP-191306.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12050,"status":"revised","reservation_date":"2019-12-11 14:53:12","uploaded":"2019-12-14 07:34:39","revisionof":"SP-191300","revisedto":"SP-191306","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191301.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191306","title":"IN* Package Discussion","source":"China Mobile","contact":"Tao Sun","contact-id":79890,"tdoctype":"discussion","for":"Information","abstract":"In* Discussion report. Proposal: - Put all in* as a package included in R17 and set R17 Phase 2 deadline as Dec. 2020. NOTE: The IN* items are request to reduce the Work Task to fill in the TUs with 30 as total.","secretary_remarks":"Revision of SP-191301. Revised to SP-191348.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12060,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:02:28","revisionof":"SP-191301","revisedto":"SP-191348","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191306.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191307","title":"FS_eNS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eNS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191334.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12220,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:02:28","revisionof":"","revisedto":"SP-191334","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191307.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191308","title":"FS_5G_AIS Work Task","source":"Tencent (Rapporteur)","contact":"Yixue Lei","contact-id":78221,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of 5G_AIS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12250,"status":"endorsed","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:02:28","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191308.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191309","title":"FS_eV2XARC_Ph2 Work Tasks","source":"LG Electronics (Rapporteur)","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eV2XARC_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12260,"status":"endorsed","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:02:28","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191309.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191310","title":"FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191343.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12270,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191343","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191310.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191311","title":"FS_5G_ProSe Work Tasks","source":"CATT, OPPO (Rapporteurs)","contact":"Yang Ning","contact-id":62986,"tdoctype":"Work Plan","for":"Agreement","abstract":"Wrong document uploaded","secretary_remarks":"Revised to SP-191344.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12310,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191344","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191311.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191313","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Tao Sun","contact-id":54129,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191355.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12350,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191355","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191313.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191314","title":"FS_MPS2_St2 Work Tasks","source":"Perspecta Labs (Rapporteur)","contact":"Don Lukacs","contact-id":79989,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_MPS2_St2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12380,"status":"endorsed","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191314.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191315","title":"FS_eATSSS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_ATSSS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12390,"status":"endorsed","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191315.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191316","title":"FS_5WWC_Ph2 Work Tasks","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5WWC_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12400,"status":"endorsed","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191316.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191317","title":"FS_5MBS Work Tasks","source":"Huawei (Rapporteur)","contact":"Patrice H\u00e9d\u00e9","contact-id":25646,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5MBS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191346.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12410,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191346","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191317.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191318","title":"FS_eNA_Ph2 Work Tasks","source":"China Mobile, Huawei (Rapporteur)","contact":"Tao Sun","contact-id":79890,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eNA_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191347.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12440,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191347","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191318.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191319","title":"FS_enh_EC Work Tasks","source":"Futurewei (Moderator)","contact":"Tony Saboorian","contact-id":42208,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_enh_EC into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191350.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12470,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191350","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191319.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191321","title":"FS_5GLAN_enh Work Tasks","source":"Huawei (Rapporteur)","contact":"Marco Spini","contact-id":8356,"tdoctype":"Work Plan","for":"Agreement","abstract":"","secretary_remarks":"WITHDRAWN","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12520,"status":"withdrawn","reservation_date":"2019-12-12 06:51:45","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191322","title":"FS_IIoT Work Tasks","source":"Nokia, Nokia Shanghai Bell (Rapporteur)","contact":"Alessio Casati","contact-id":68028,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_IIoT into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191345.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12530,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191345","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191322.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191323","title":"FS_MUSIM Work Tasks","source":"Intel (Rapporteur)","contact":"Saso Stojanovski","contact-id":56758,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_MUSIM into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191353.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12560,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191353","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191323.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191324","title":"FS_eNPN Work Tasks","source":"Ericsson (Rapporteur)","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"Work Plan","for":"Agreement","abstract":"Updated Work Tasks and TU estimates.","secretary_remarks":"Revised to SP-191357.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12580,"status":"revised","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"SP-191357","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191324.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191325","title":"FS_5GSAT_ARCH Work Tasks","source":"THALES S.A. (Rapporteur)","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"Work Plan","for":"Agreement","abstract":"As a revision of the WT tasks agreed by Email, this paper proposes the break-down of objectives of 5G_SAT_ARCH into a set of Work Tasks with granular TU estimate per Work Task. In the background clause, this paper proposes to update the reference to the 5G_SAT_ARCH.","secretary_remarks":"This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12610,"status":"endorsed","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191325.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191326","title":"Report from moderated email discussion on FS_MPS2","source":"AT&T","contact":"Farooq Bari","contact-id":57133,"tdoctype":"Work Plan","for":"Information","abstract":"The document consolidates discussion from SA_DRAFT email list about Release 17 work on FS_MPS2.","secretary_remarks":"Revision of SP-191251. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11970,"status":"noted","reservation_date":"2019-12-12 06:51:45","uploaded":"2019-12-13 10:01:41","revisionof":"SP-191251","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191326.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191329","title":"Report on moderated email discussion on FS_eNA_Ph2","source":"Samsung R&D Institute UK","contact":"Andy Bennett","contact-id":70253,"tdoctype":"report","for":"Decision","abstract":"Report on the moderated email discussion on FS_eNA_Ph2 prior to SA#86","secretary_remarks":"Revision of SP-191285. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11680,"status":"noted","reservation_date":"2019-12-12 11:35:39","uploaded":"2019-12-13 10:01:41","revisionof":"SP-191285","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191329.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191333","title":"Report from moderated email discussion on 'Study on Support for 5WWC, Phase 2'","source":"BROADCOM CORPORATION","contact":"Florin Baboescu","contact-id":45772,"tdoctype":"report","for":"Decision","abstract":"This document is the summary of the corresponding moderated email discussion in SA Drafts reflector according to the principles agreed in SP-190950 with regard to the working tasks of 'Study on Support for 5WWC, Phase 2'.","secretary_remarks":"Revision of SP-191198. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":11830,"status":"noted","reservation_date":"2019-12-12 11:39:24","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191198","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191333.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191334","title":"FS_eNS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eNS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191307. Revised to SP-191342.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12230,"status":"revised","reservation_date":"2019-12-12 11:39:24","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191307","revisedto":"SP-191342","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191334.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191340","title":"Working agreement for Rel-17 timeline in TSG SA","source":"TSG SA Chairman","contact":"Georg Mayer","contact-id":9175,"tdoctype":"other","for":"Approval","abstract":"Proposed way forward for Rel-17 timeline in TSG SA","secretary_remarks":"The issue was extensively discussed and the working Agreement proposal was withdrawn.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12630,"status":"withdrawn","reservation_date":"2019-12-12 11:43:52","uploaded":"2019-12-13 10:00:59","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191340.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191341","title":"Proposed way forward for Rel-17 timeline in TSG SA","source":"TSG SA Chairman","contact":"Georg Mayer","contact-id":9175,"tdoctype":"other","for":"Endorsement","abstract":"Proposed way forward for Rel-17 timeline in TSG SA Way Forward: - The Rel-17 timeline for SA WG2 completion is December 2020. - The Rel-17 freeze date from SA perspective is September 2021.","secretary_remarks":"This proposal was translated into a Working agreement in SP-191340, but that was finally withdrawn. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12620,"status":"noted","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191341.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191342","title":"FS_eNS_Ph2 Work Tasks","source":"ZTE (Rapporteur)","contact":"Tricci So","contact-id":44974,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eNS_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191334. This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12240,"status":"endorsed","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191334","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191342.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191343","title":"FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191310. Revised to SP-191354.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12280,"status":"revised","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191310","revisedto":"SP-191354","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191343.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191344","title":"FS_5G_ProSe Work Tasks","source":"CATT, OPPO (Rapporteurs)","contact":"Yang Ning","contact-id":62986,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5G_ProSe into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191311. Revised to SP-191351.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12320,"status":"revised","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191311","revisedto":"SP-191351","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191344.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191345","title":"FS_IIoT Work Tasks","source":"Nokia, Nokia Shanghai Bell (Rapporteur)","contact":"Alessio Casati","contact-id":68028,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_IIoT into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191322. Revised to SP-191352.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12540,"status":"revised","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191322","revisedto":"SP-191352","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191345.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191346","title":"FS_5MBS Work Tasks","source":"Huawei (Rapporteur)","contact":"Patrice H\u00e9d\u00e9","contact-id":25646,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5MBS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191317. Revised to SP-191373.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12420,"status":"revised","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 15:41:44","revisionof":"SP-191317","revisedto":"SP-191373","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191346.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191347","title":"FS_eNA_Ph2 Work Tasks","source":"China Mobile, Huawei (Rapporteur)","contact":"Tao Sun","contact-id":79890,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eNA_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191318. Revised to SP-191374.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12450,"status":"revised","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191318","revisedto":"SP-191374","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191347.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191348","title":"IN* Package Discussion","source":"China Mobile","contact":"Tao Sun","contact-id":79890,"tdoctype":"discussion","for":"Information","abstract":"In* Discussion report. Proposal: - Put all in* as a package included in R17 and set R17 Phase 2 deadline as Dec. 2020. NOTE: The IN* items are request to reduce the Work Task to fill in the TUs with 30 as total.","secretary_remarks":"Revision of SP-191306. Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12070,"status":"noted","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-14 07:34:39","revisionof":"SP-191306","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191348.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191349","title":"Report from moderated email discussion on FS_eNPN","source":"Nanjing Ericsson Panda Com Ltd","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"report","for":"Discussion","abstract":"Report on the moderated discussion for FS_eNPN","secretary_remarks":"Revision of SP-191287. Withdrawn","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2019-12-13 09:33:01","uploaded":null,"revisionof":"SP-191287","revisedto":"","release":"Rel-17","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191350","title":"FS_enh_EC Work Tasks","source":"Futurewei (Moderator)","contact":"Tony Saboorian","contact-id":42208,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_enh_EC into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191319. Revised to SP-191375.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12480,"status":"revised","reservation_date":"2019-12-13 09:33:01","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191319","revisedto":"SP-191375","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191350.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191351","title":"FS_5G_ProSe Work Tasks","source":"CATT, OPPO (Rapporteurs)","contact":"Yang Ning","contact-id":62986,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5G_ProSe into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191344. Revised to SP-191371.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12330,"status":"revised","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 15:41:44","revisionof":"SP-191344","revisedto":"SP-191371","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191351.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191352","title":"FS_IIoT Work Tasks","source":"Nokia, Nokia Shanghai Bell (Rapporteur)","contact":"Alessio Casati","contact-id":68028,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_IIoT into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191345. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12550,"status":"endorsed","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 15:41:44","revisionof":"SP-191345","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191352.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191353","title":"FS_MUSIM Work Tasks","source":"Intel (Rapporteur)","contact":"Saso Stojanovski","contact-id":56758,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_MUSIM into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191323. This was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12570,"status":"endorsed","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191323","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191353.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191354","title":"FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191343. Revised to SP-191370.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12290,"status":"revised","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 15:41:44","revisionof":"SP-191343","revisedto":"SP-191370","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191354.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191355","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Tao Sun","contact-id":54129,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191313. Revised to SP-191372.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12360,"status":"revised","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 15:41:44","revisionof":"SP-191313","revisedto":"SP-191372","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191355.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191356","title":"FS_ID_UAS-SA2 Work Tasks","source":"Qualcomm CDMA Technologies","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_ID_UAS-SA WG2 ('Study on supporting Unmanned Aerial Systems Connectivity, Identification, and Tracking') into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revised to SP-191358.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12500,"status":"revised","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 10:00:59","revisionof":"","revisedto":"SP-191358","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191356.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191357","title":"FS_eNPN Work Tasks","source":"Ericsson (Rapporteur)","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"Work Plan","for":"Agreement","abstract":"Updated Work Tasks and TU estimates.","secretary_remarks":"Revision of SP-191324. Revised to SP-191376.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12590,"status":"revised","reservation_date":"2019-12-13 09:33:17","uploaded":"2019-12-13 10:00:59","revisionof":"SP-191324","revisedto":"SP-191376","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191357.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191358","title":"FS_ID_UAS-SA2 Work Tasks","source":"Qualcomm CDMA Technologies","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_ID_UAS-SA WG2 ('Study on supporting Unmanned Aerial Systems Connectivity, Identification, and Tracking') into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191356. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12510,"status":"endorsed","reservation_date":"2019-12-13 09:33:32","uploaded":"2019-12-13 15:41:44","revisionof":"SP-191356","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191358.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191361","title":"Way forward on Release 17 prioritisation","source":"Qualcomm Inc., Nokia, Nokia Shanghai Bell, Ericsson, Deutsche Telekom, Telstra, Sony, Telecom Italia, Telia Company, Vodafone, Charter, BT, T-Mobile USA, Broadcom, Apple, Telenor, CableLabs, Mediatek, Cisco, Telus","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"other","for":"Agreement","abstract":"Way forward on Release 17 prioritisation Way Forward (IN items downscoping): - FS_eNPN - Remove WT 4.5 'Optimizations for expected UE behaviour' (0.5+0.5) - FS_enh_EC - Remove WT 2 'deployment guidelines' (1+1) - ProSe 5G - Remove WT 2.6 'path selection' (1+0.5) and WT 2.7 'path switching' (1+0.5) - to be based on EPS and V2X approach which was UE implementation based - FS_5MBS - Reconsider updated TU estimates as per next slide Way Forward (IN*): - UAS (5) as in SP-191294 (updated moderator report) - WT#1 without WT#1.1 as in updated moderator report - eATSSS (4.5) as in SP-191315 - WWC (4) as in SP-191316 - eLCS (1) -> can start WID in Q3 2020 (Aug. SA WG2) - Alignment with RAN on latency reduction (WT#1.1) - MPS2 (2) as in SP-191314 Total=16.5 TUs","secretary_remarks":"Noted","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12640,"status":"noted","reservation_date":"2019-12-13 09:33:32","uploaded":"2019-12-13 15:41:44","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191361.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191370","title":"FS_eLCS_ph2 Work Tasks","source":"CATT (Rapporteur)","contact":"Ming Ai","contact-id":40862,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eLCS_ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191354. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12300,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191354","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191370.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191371","title":"FS_5G_ProSe Work Tasks","source":"CATT, OPPO (Rapporteurs)","contact":"Yang Ning","contact-id":62986,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5G_ProSe into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191351. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12340,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191351","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191371.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191372","title":"FS_UPCAS Work Tasks","source":"China Mobile","contact":"Tao Sun","contact-id":54129,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_UPCAS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191355. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12370,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191355","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191372.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191373","title":"FS_5MBS Work Tasks","source":"Huawei (Rapporteur)","contact":"Patrice H\u00e9d\u00e9","contact-id":25646,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_5MBS into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191346. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12430,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191346","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191373.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191374","title":"FS_eNA_Ph2 Work Tasks","source":"China Mobile, Huawei (Rapporteur)","contact":"Tao Sun","contact-id":79890,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_eNA_Ph2 into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191347. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12460,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191347","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191374.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191375","title":"FS_enh_EC Work Tasks","source":"Futurewei (Moderator)","contact":"Tony Saboorian","contact-id":42208,"tdoctype":"Work Plan","for":"Agreement","abstract":"This paper proposes the break-down of objectives of FS_enh_EC into a set of Work Tasks with granular TU estimate per Work Task.","secretary_remarks":"Revision of SP-191350. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12490,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191350","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191375.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191376","title":"FS_eNPN Work Tasks","source":"Ericsson (Rapporteur)","contact":"Krister S\u00e4llberg","contact-id":11978,"tdoctype":"Work Plan","for":"Agreement","abstract":"Updated Work Tasks and TU estimates.","secretary_remarks":"Revision of SP-191357. Endorsed","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12600,"status":"endorsed","reservation_date":"2019-12-13 13:15:01","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191357","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191376.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191377","title":"Rel-17 prioritization for SA WG2","source":"SA WG2 Chairman","contact":"Puneet Jain","contact-id":36283,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward: - Reduce 2 TUs from FS_5MBS study phase. - Determine whether FS_eNS_ph2, FS_eV2XARC_ph2 needs to be down scoped. - Agree that FS_eNPN, FS_5G_ProSe and FS_5MBS will be granted 1Qtr exception. - Agree that at maximum 1 Qtr exception will be granted. - Determine additional Available TU to be allocated to which IN* item. - There is scope to add only 1 IN* item unless further down scoping of IN items is undertaken.","secretary_remarks":"Revision of SP-191296. Revised to SP-191381.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12020,"status":"revised","reservation_date":"2019-12-13 15:39:35","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191296","revisedto":"SP-191381","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191377.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-191381","title":"Rel-17 prioritization for SA WG2","source":"SA WG2 Chairman","contact":"Puneet Jain","contact-id":36283,"tdoctype":"discussion","for":"Agreement","abstract":"Way Forward: - Reduce 2 TUs from FS_5MBS study phase. - Determine whether FS_eNS_ph2, FS_eV2XARC_ph2 needs to be down scoped. - Agree that FS_eNPN, FS_5G_ProSe and FS_5MBS will be granted 1Qtr exception. - Agree that at maximum 1 Qtr exception will be granted. - Determine additional Available TU to be allocated to which IN* item. - There is scope to add only 1 IN* item unless further down scoping of IN items is undertaken.","secretary_remarks":"Revision of SP-191377. The proposed way forward was endorsed.","agenda_item_sort_order":48,"ainumber":"7.3","ainame":"Release 17 Planning (schedule, prioritization, etc.)","tdoc_agenda_sort_order":12030,"status":"endorsed","reservation_date":"2019-12-13 15:39:47","uploaded":"2019-12-13 15:40:30","revisionof":"SP-191377","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_86\/Docs\/SP-191381.zip","group":"SP","meeting":"SP-86","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]