[{"name":"R1-1609978","title":"Design options for longer cyclic prefix and link level simulation results","source":"Qualcomm Incorporated","contact":"Peter Gaal","contact-id":57198,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"7.2.4.1","ainame":"Longer cyclic prefix for MBSFN subframe","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2016-09-30 03:53:58","uploaded":"2016-10-01 02:16:54","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG1_RL1\/TSGR1_86b\/Docs\/R1-1609978.zip","group":"R1","meeting":"R1-86","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R1-1610933","title":"Way Forward on longer CP","source":"Qualcomm","contact":"Patrick Merias","contact-id":52292,"tdoctype":"discussion","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":69,"ainumber":"7.2.4.1","ainame":"Longer cyclic prefix for MBSFN subframe","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2016-10-18 19:08:21","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R1","meeting":"R1-86","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]