[{"name":"R4-1704676","title":"On absolute power control accuracy requirement for NB-IoT","source":"Intel Corporation","contact":"Yang Tang","contact-id":56725,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":186,"ainumber":"7.17.2","ainame":"UE RF (36.101) [NB_IOTenh-Core]","tdoc_agenda_sort_order":46760,"status":"noted","reservation_date":"2017-05-03 23:04:36","uploaded":"2017-05-06 13:17:51","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"NB_IOTenh-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_83\/Docs\/R4-1704676.zip","group":"R4","meeting":"R4-83","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-1704677","title":"CR on absolute power control accuracy for eNB-IoT","source":"Intel Corporation","contact":"Yang Tang","contact-id":56725,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":186,"ainumber":"7.17.2","ainame":"UE RF (36.101) [NB_IOTenh-Core]","tdoc_agenda_sort_order":46770,"status":"withdrawn","reservation_date":"2017-05-03 23:04:36","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-14","crspec":"36.101","crspecversion":"14.3.0","workitem":[{"winame":"NB_IOTenh-Core"}],"crnumber":4394.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-83","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]