[{"name":"C6-200216","title":"Adding a default UICC profile to the initial conditions of 5.4.x test cases","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"In the initial conditions of 5.4.x test cases a default UICC shall be given as it is required for an appropriate test  setup","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-07 12:36:59","uploaded":"2020-04-22 12:14:41","revisionof":"","revisedto":"C6-200329","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":322.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200216.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200218","title":"Introduction test case \u2013 5.5.1 \u2013 Display of 5G Operator PLMN name from USIM","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"Test case to verify that ME displays correctly the Operator PLMN name from USIM, based on MCC, MNC, TAC","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-09 07:04:06","uploaded":"2020-05-20 04:49:19","revisionof":"","revisedto":"C6-200344","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":323.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200218.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200219","title":"Introduction test case \u2013 5.5.2 \u2013 Display of 5G Operator PLMN name from ME.","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"Introducing test to verify the 5G Operator PLMN list is correctly displayed on ME from sources other than USIM.","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-09 07:15:01","uploaded":"2020-05-20 04:49:19","revisionof":"","revisedto":"C6-200345","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":324.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200219.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200220","title":"Correction of incorrectly coded EF_ACC bytes in TC 5.4.9","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"Correction of incorrect coding of EF_ACC in Table 5.4.9-1 and 5.4.9-2","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-09 08:07:24","uploaded":"2020-04-09 08:23:13","revisionof":"C6-200129","revisedto":"C6-200330","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"TEI15_Test"}],"crnumber":312.0,"crrevision":2.0,"crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200220.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200221","title":"Correction of incorrect numbering in TC 5.4.1","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"The numbering in the Procedure should be corrected to ensure that the steps are executed in order.","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-09 08:13:04","uploaded":"2020-04-09 08:44:30","revisionof":"C6-200130","revisedto":"C6-200336","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"TEI15_Test"}],"crnumber":313.0,"crrevision":1.0,"crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200221.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200222","title":"Correction of Initial conditions of TC 5.4.3 and 5.4.6","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-22 12:11:49","uploaded":"2020-05-11 14:11:50","revisionof":"","revisedto":"C6-200337","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"TEI15_Test"}],"crnumber":325.0,"crrevision":"","crcategory":"C","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200222.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200223","title":"Introduction of test 5.4.4 - UAC - Access Identity 1 \u2013 no MPS indication by USIM and SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-23 07:13:14","uploaded":"2020-05-19 15:47:15","revisionof":"","revisedto":"C6-200338","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":326.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200223.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200224","title":"Introduction of test 5.4.7 - UAC - Access Identity 2 \u2013 no MCS indication by USIM and SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-23 07:17:35","uploaded":"2020-05-15 14:02:16","revisionof":"","revisedto":"C6-200287","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":327.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200224.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200225","title":"Introduction of tests 15.1.1 to 15.1.4 - Authentication procedure for EAP-AKA''","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-04-23 07:22:12","uploaded":"2020-05-11 14:14:54","revisionof":"","revisedto":"C6-200296","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":328.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200225.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200255","title":"Introduction of test 5.4.8 - UAC - Access Classes 11 and 15","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2020-05-07 12:10:16","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":333.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200257","title":"Introduction of test 5.4.10 - Operator Access category \u2013 SUPI is not changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2020-05-07 14:07:55","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":335.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200258","title":"Introduction of test 5.4.11 - Operator Access category \u2013 SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2020-05-07 14:12:41","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":336.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200259","title":"Correction test case \u2013 5.3.16","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"Correcting the Protection Scheme ID","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-09 04:54:17","uploaded":"2020-05-20 04:49:19","revisionof":"","revisedto":"C6-200346","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":337.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200259.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200262","title":"Correction of EF_SUCI_Calc_Info in the 5G-NR UICC","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-14 11:23:17","uploaded":"2020-05-15 14:06:26","revisionof":"","revisedto":"C6-200342","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":338.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200262.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200263","title":"Correction of EF_SUCI_Calc_Info in test case 5.3.1","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-14 11:27:37","uploaded":"2020-05-15 14:06:26","revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":339.0,"crrevision":"","crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200263.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200264","title":"Correction of the Home Network Public Key used in test case 5.3.3","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-14 11:31:04","uploaded":"2020-05-15 14:06:26","revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":340.0,"crrevision":"","crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200264.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200265","title":"Correction of the Home Network Public Key 2 used in test case 5.3.11","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-14 11:33:57","uploaded":"2020-05-15 14:06:26","revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":341.0,"crrevision":"","crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200265.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200266","title":"Introduction new test case 5.3.x - SUCI calculation by by ME using Profile B with compressed Home Network Public Key","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-14 11:36:56","uploaded":"2020-05-15 14:06:26","revisionof":"","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":342.0,"crrevision":"","crcategory":"B","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200266.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200270","title":"T27.22.4.27.8 Open_Channel_related to NG-RAN Correction to Applicability Table","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-16 00:59:20","uploaded":"2020-05-19 15:37:36","revisionof":"","revisedto":"C6-200353","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":537.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200270.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200271","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed and not allowed sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-16 01:02:58","uploaded":"2020-05-19 15:37:36","revisionof":"","revisedto":"C6-200349","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":538.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200271.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200272","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed with modification sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-16 01:06:59","uploaded":"2020-05-19 15:37:36","revisionof":"","revisedto":"C6-200306","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":539.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200272.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200273","title":"TestCase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment by OPEN CHANNEL for NG-RAN and which is allowed by the USIM.","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-16 01:10:10","uploaded":"2020-05-19 15:37:36","revisionof":"","revisedto":"C6-200350","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":540.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200273.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200281","title":"Test Case Steering Of Roaming via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-18 08:07:52","uploaded":"2020-05-25 18:38:59","revisionof":"","revisedto":"C6-200340","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":541.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200281.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200285","title":"Test Case Routing Indicator Data update via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-18 08:26:47","uploaded":"2020-05-22 09:11:01","revisionof":"","revisedto":"C6-200343, C6-200383","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":542.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200285.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200287","title":"Introduction of test 5.4.7 - UAC - Access Identity 2 \u2013 no MCS indication by USIM and SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-18 12:57:07","uploaded":"2020-05-19 15:12:46","revisionof":"C6-200224","revisedto":"C6-200339","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":327.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200287.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200296","title":"Introduction of tests 15.1.1 to 15.1.4 - Authentication procedure for EAP-AKA''","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-19 12:49:21","uploaded":"2020-05-19 13:41:30","revisionof":"C6-200225","revisedto":"C6-200298","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":328.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200296.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200298","title":"Introduction of tests 15.1.1 to 15.1.4 - Authentication procedure for EAP-AKA''","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-20 11:39:54","uploaded":"2020-05-20 11:47:09","revisionof":"C6-200296","revisedto":"C6-200341","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":328.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200298.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200299","title":"Correction test case \u2013 5.3.9 UE identification by 5G-GUTI \u2013 Last Registered TAI stored by ME","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-21 18:00:27","uploaded":"2020-05-21 18:11:13","revisionof":"","revisedto":"C6-200347","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":347.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200299.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200300","title":"Correction test case \u2013 5.3.10 UE identification after SUPI is changed","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-21 18:05:30","uploaded":"2020-05-21 18:11:13","revisionof":"","revisedto":"C6-200348","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":348.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200300.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200304","title":"Correction to testcase 5.3.8: UE identification by 5G-GUTI \u2013 Last Registered TAI stored on USIM","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-22 23:54:14","uploaded":"2020-05-23 00:01:50","revisionof":"","revisedto":"C6-200351","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":349.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200304.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200305","title":"Correction to testcase 5.3.5: UE identification by SUCI in response to IDENTITY REQUEST message with T3519 timer expiry","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-22 23:56:45","uploaded":"2020-05-23 00:01:50","revisionof":"","revisedto":"C6-200352","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":350.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200305.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200306","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed with modification sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-23 00:29:05","uploaded":"2020-05-23 00:30:48","revisionof":"C6-200272","revisedto":"C6-200309","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":539.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200306.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200309","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed with modification sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-26 05:02:42","uploaded":"2020-05-26 05:18:14","revisionof":"C6-200306","revisedto":"C6-200355","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":539.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200309.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200329","title":"Adding a default UICC profile to the initial conditions of 5.4.x test cases","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"In the initial conditions of 5.4.x test cases a default UICC shall be given as it is required for an appropriate test  setup","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 11:37:43","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200216","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":322.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200329.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200330","title":"Correction of incorrectly coded EF_ACC bytes in TC 5.4.9","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"Correction of incorrect coding of EF_ACC in Table 5.4.9-1 and 5.4.9-2","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-27 11:56:14","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200220","revisedto":"C6-200386","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"TEI15_Test"}],"crnumber":312.0,"crrevision":3.0,"crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200330.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200336","title":"Correction of incorrect numbering in TC 5.4.1","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"The numbering in the Procedure should be corrected to ensure that the steps are executed in order.","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 14:39:00","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200221","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":313.0,"crrevision":2.0,"crcategory":"D","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200336.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200337","title":"Correction of Initial conditions of TC 5.4.3 and 5.4.6","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 14:41:03","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200222","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":325.0,"crrevision":1.0,"crcategory":"C","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200337.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200338","title":"Introduction of test 5.4.4 - UAC - Access Identity 1 \u2013 no MPS indication by USIM and SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-27 14:42:41","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200223","revisedto":"C6-200390","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":326.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200338.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200339","title":"Introduction of test 5.4.7 - UAC - Access Identity 2 \u2013 no MCS indication by USIM and SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 14:43:54","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200287","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":327.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200339.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200340","title":"Test Case Steering Of Roaming via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"Correction after comments during meeting","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-27 14:51:39","uploaded":"2020-05-27 15:22:19","revisionof":"C6-200281","revisedto":"C6-200393","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":541.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200340.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200341","title":"Introduction of tests 15.1.1 to 15.1.4 - Authentication procedure for EAP-AKA''","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 14:58:59","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200298","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":328.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200341.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200342","title":"Correction of EF_SUCI_Calc_Info in the 5G-NR UICC","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 15:00:51","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200262","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":338.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200342.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200343","title":"Test Case Routing Indicator Data update via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"Comments from meeting taken into account","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-27 15:25:30","uploaded":"2020-05-27 16:17:31","revisionof":"C6-200285","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":542.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200343.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200344","title":"Introduction test case \u2013 5.5.1 \u2013 Display of 5G Operator PLMN name from USIM","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"Test case to verify that ME displays correctly the Operator PLMN name from USIM, based on MCC, MNC, TAC","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 19:07:33","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200218","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":323.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200344.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200345","title":"Introduction test case \u2013 5.5.2 \u2013 Display of 5G Operator PLMN name from ME.","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"Introducing test to verify the 5G Operator PLMN list is correctly displayed on ME from sources other than USIM.","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 19:12:59","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200219","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":324.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200345.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200346","title":"Correction test case \u2013 5.3.16","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"Correcting the Protection Scheme ID","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 19:18:23","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200259","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":337.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200346.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200347","title":"Correction test case \u2013 5.3.9 UE identification by 5G-GUTI \u2013 Last Registered TAI stored by ME","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 19:23:30","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200299","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":347.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200347.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200348","title":"Correction test case \u2013 5.3.10 UE identification after SUPI is changed","source":"Apple","contact":"Stanley Mayalil","contact-id":81531,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-27 19:27:08","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200300","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":348.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200348.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200349","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed and not allowed sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-28 00:56:14","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200271","revisedto":"C6-200354","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":538.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200349.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200350","title":"TestCase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment by OPEN CHANNEL for NG-RAN and which is allowed by the USIM.","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 01:07:16","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200273","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":540.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-201152","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200350.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200351","title":"Correction to testcase 5.3.8: UE identification by 5G-GUTI \u2013 Last Registered TAI stored on USIM","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 01:17:11","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200304","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":349.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200351.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200352","title":"Correction to testcase 5.3.5: UE identification by SUCI in response to IDENTITY REQUEST message with T3519 timer expiry","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"Merged into C6-200389","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"merged","reservation_date":"2020-05-28 01:22:45","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200305","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":350.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200352.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200353","title":"T27.22.4.27.8 Open_Channel_related to NG-RAN Correction to Applicability Table","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 01:26:46","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200270","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":537.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"CP-201152","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200353.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200354","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed and not allowed sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 01:32:50","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200349","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":538.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-201152","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200354.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200355","title":"Testcase 27.22.13 CALL CONTROL EVENT on PDU Session Establishment for NG-RAN (allowed with modification sequences)","source":"Qualcomm Incorporated","contact":"Amandeep Virk","contact-id":74918,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 01:37:17","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200309","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":539.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"CP-201152","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200355.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200383","title":"Test Case Routing Indicator Data update via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"Take into account comments during meeting","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 13:27:46","uploaded":"2020-05-29 08:13:00","revisionof":"C6-200285","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":542.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-201152","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200383.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200385","title":"Correction of minor issues in 15.2.x test cases","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 13:56:29","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200358","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":332.0,"crrevision":4.0,"crcategory":"C","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200385.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200386","title":"Correction of incorrectly coded EF_ACC bytes in TC 5.4.9","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"Agreement","abstract":"Correction of incorrect coding of EF_ACC in Table 5.4.9-1 and 5.4.9-2","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-28 14:31:52","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200330","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"TEI15_Test"}],"crnumber":312.0,"crrevision":4.0,"crcategory":"D","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200386.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200389","title":"Clarification to test cases 5.3.5","source":"China Telecommunications, Qualcomm","contact":"JIAN YANG","contact-id":85202,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-29 01:40:16","uploaded":"2020-05-29 03:00:15","revisionof":"C6-200317","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":330.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200389.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200390","title":"Introduction of test 5.4.4 - UAC - Access Identity 1 \u2013 no MPS indication by USIM and SUPI is changed","source":"Comprion GmbH","contact":"Arne Marquordt","contact-id":62635,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-29 08:01:51","uploaded":"2020-05-29 12:07:53","revisionof":"C6-200338","revisedto":"","release":"Rel-15","crspec":31.121,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":326.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-201151","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200390.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200393","title":"Test Case Steering Of Roaming via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"Correction after comments received by mail","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2020-05-29 09:09:15","uploaded":"2020-05-29 09:35:52","revisionof":"C6-200340","revisedto":"C6-200400","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":541.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200393.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C6-200400","title":"Test Case Steering Of Roaming via NAS message passed to USIM","source":"THALES","contact":"Herv\u00e9 COLLET","contact-id":85355,"tdoctype":"CR","for":"Approval","abstract":"Correction after comments received by mail","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"7.10.9","ainame":"UE Conformance Test Aspects - CT6 aspects of 5G System Phase 1 (5GS_Ph1_UEConTest) (TARGET JUN 19)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2020-05-29 13:07:33","uploaded":"2020-05-29 13:42:32","revisionof":"C6-200393","revisedto":"","release":"Rel-15","crspec":31.124,"crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1_UEConTest"}],"crnumber":541.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"CP-201152","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG6_smartcard_Ex-T3\/CT6-100e\/Docs\/C6-200400.zip","group":"C6","meeting":"C6-ah-38127","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]