[{"name":"R2-156244","title":"Scheduling request based on prescheduling transmission","source":"III","contact":"Yi-Ting Lin","contact-id":43482,"tdoctype":"discussion","for":"Discussion","abstract":"RAN#67 approved a new Release 13 Study Item on Latency reduction techniques for LTE [1]. RAN2 studies the dedicated prescheduling resource and contention-based PUSCH to prevent scheduling request (SR) procedure for UL transmission. Although the prescheduling resource allocation is independent from SR procedure, delivering data\/BSR on the prescheduling resource without SR may have impact on SR\/BSR procedure. In this contribution, we proposed eNB side and UE side SR procedure based on prescheduling resource.","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 04:23:27","uploaded":"2015-11-06 06:48:28","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156244.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156256","title":"Feedback for SPS PDCCH command","source":"CATT","contact":"Fangli Xu","contact-id":40178,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 05:20:17","uploaded":"2015-11-07 07:06:05","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156256.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156296","title":"Further analysis on uplink transmission skipping","source":"Huawei, HiSilicon","contact":"Li Chen","contact-id":62676,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 06:57:14","uploaded":"2015-11-07 04:38:19","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156296.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156298","title":"Introduction of CB-PUSCH transmission","source":"Huawei, HiSilicon","contact":"Li Chen","contact-id":62676,"tdoctype":"CR","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 06:57:14","uploaded":"2015-11-07 04:38:19","revisionof":"","revisedto":"","release":"Rel-13","crspec":36.331,"crspecversion":"12.7.0","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":1938.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156298.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156299","title":"Summary of email discussion: [91bis#34][LTE\/LATRED] CB-PUSCH","source":"Huawei","contact":"Li Chen","contact-id":62676,"tdoctype":"report","for":"Discussion","abstract":"related to email discussion [91bis#34]","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-11-06 06:57:14","uploaded":"2015-11-07 04:38:19","revisionof":"","revisedto":"R2-156923","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156299.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156300","title":"Text Proposal capturing outcome of email discussion: [91bis#34][LTE\/LATRED] CB-PUSCH","source":"Huawei","contact":"Li Chen","contact-id":62676,"tdoctype":"pCR","for":"Discussion","abstract":"related to email discussion [91bis#34]","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-11-06 06:57:14","uploaded":"2015-11-07 04:38:20","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156300.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156322","title":"Discussion on the SPS activation or release command","source":"ZTE Corporation","contact":"Zhongda Du","contact-id":38890,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 07:15:37","uploaded":"2015-11-06 07:55:50","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156322.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156402","title":"Performance evaluation of CB-PUSCH","source":"Nokia Networks","contact":"Chunli Wu","contact-id":73601,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 08:47:42","uploaded":"2015-11-06 11:10:31","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156402.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156644","title":"Uplink Latency Reduction through Contention-Based PUSCH Transmissions","source":"Motorola Mobility UK Ltd.","contact":"Murali Narasimha","contact-id":38149,"tdoctype":"other","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 17:47:18","uploaded":"2015-11-07 06:17:38","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156644.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156653","title":"Impact of latency reduction techniques in TDD systems","source":"Ericsson","contact":"Henrik Enbuske","contact-id":32991,"tdoctype":"discussion","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 18:27:03","uploaded":"2015-11-07 07:34:23","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156653.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156658","title":"Email discussion report for [91bis#33][LTE\/LATRED] \u2013 L2 enhancements","source":"Ericsson","contact":"Henrik Enbuske","contact-id":32991,"tdoctype":"report","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2015-11-06 18:33:22","uploaded":"2015-11-07 07:34:23","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156658.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156695","title":"Fast UL evaluation for Mission Critical \/ Real Time applications","source":"Sequans Communications","contact":"Benny Assouline","contact-id":46903,"tdoctype":"discussion","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2015-11-06 21:24:57","uploaded":"2015-11-06 21:37:31","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156695.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156696","title":"Further considerations on sharing of semi-persistent uplink resources","source":"ETRI","contact":"Seungkwon Cho","contact-id":59558,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-06 21:39:04","uploaded":"2015-11-07 05:28:42","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156696.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156756","title":"Need for feedback of SPS activation-release","source":"LG Electronics Inc.","contact":"SunYoung LEE","contact-id":56452,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-07 02:14:48","uploaded":"2015-11-07 02:27:01","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156756.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156759","title":"Remaining issues for SkipULTx","source":"LG Electronics Inc.","contact":"SunYoung LEE","contact-id":56452,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-11-07 02:16:12","uploaded":"2015-11-07 02:27:01","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156759.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156820","title":"Text proposal as result of Email discussion [91bis#33][LTE\/LATRED] \u2013 L2 enhancements","source":"Ericsson","contact":"Henrik Enbuske","contact-id":32991,"tdoctype":"pCR","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-11-07 07:05:08","uploaded":"2015-11-07 07:34:23","revisionof":"","revisedto":"R2-156924","release":"Rel-13","crspec":36.881,"crspecversion":"0.4.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156820.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156921","title":"Text Proposal for Handover Latency Reduction Solutions","source":"Intel Corporation","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2015-11-25 16:36:07","uploaded":"2016-10-27 10:32:04","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156921.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156922","title":"Updated conclusion on CB-PUSCH","source":"Huawei, CATT, Nokia Networks, Intel","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"report","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-11-25 16:36:08","uploaded":"2016-10-27 10:32:04","revisionof":"","revisedto":"R2-156925","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156922.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156923","title":"Text Proposal capturing outcome of email discussion: [91bis#34][LTE\/LATRED] CB-PUSCH","source":"Huawei","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-11-25 16:36:08","uploaded":"2016-10-27 10:32:04","revisionof":"R2-156299","revisedto":"R2-156926","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156923.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156924","title":"Text proposal as result of Email discussion [91bis#33][LTE\/LATRED] \u2013 L2 enhancements","source":"Ericsson","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2015-11-25 16:36:08","uploaded":"2016-10-27 10:32:04","revisionof":"R2-156820","revisedto":"","release":"Rel-14","crspec":36.881,"crspecversion":"0.4.0","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156924.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156925","title":"Text Proposal capturing outcome of email discussion: [91bis#34][LTE\/LATRED] CB-PUSCH","source":"Huawei,","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2015-11-25 16:36:08","uploaded":"2016-10-27 10:32:04","revisionof":"R2-156922","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156925.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156926","title":"Updated conclusion on CB-PUSCH","source":"Huawei, CATT, Nokia Networks, Intel","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2015-11-25 16:36:08","uploaded":"2016-10-27 10:32:04","revisionof":"R2-156923","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156926.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-156928","title":"TP on conclusions for Handover latency reduction","source":"Intel Corporation","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2015-11-25 16:36:09","uploaded":"2016-10-27 10:32:04","revisionof":"","revisedto":"R2-157117","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-156928.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R2-157117","title":"TP on conclusions for Handover latency reduction","source":"Intel Corporation","contact":"Yong-jun Chung","contact-id":33618,"tdoctype":"pCR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":81,"ainumber":"7.10.1.1","ainame":"LTE Rel-14: SI: Study on Latency reduction techniques for LTE: L2 enhancements to reduce latency: Prescheduling, SPS, and CB-PUSCH","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2015-11-25 16:37:26","uploaded":"2016-10-27 10:32:06","revisionof":"R2-156928","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"FS_LTE_LATRED"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG2_RL2\/TSGR2_92\/Docs\/R2-157117.zip","group":"R2","meeting":"R2-92","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]