[{"name":"C4-173012","title":"Clarification of usage of ephermal ports in Sx","source":"Cisco Systems","contact":"Arun Alex","contact-id":66713,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-04-26 15:22:04","uploaded":"2017-05-05 02:39:10","revisionof":"","revisedto":"C4-173218","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173012.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173013","title":"Addition of indicator for Sxa\/Sxb\/Sxc","source":"Cisco Systems","contact":"Arun Alex","contact-id":66713,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-04-26 15:24:15","uploaded":"2017-05-05 02:39:10","revisionof":"","revisedto":"C4-173220","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173013.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173027","title":"Online Charging","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"C4-173224","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173027.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173028","title":"Encoding of URR Information Elements","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173028.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173029","title":"Credit Pooling and Envelope Reporting","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173029.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173030","title":"Lawful Interception support","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173030.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173031","title":"Downlink Data Report per FAR","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"C4-173205","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173031.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173032","title":"Error Indication support by PGW","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173032.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173033","title":"Conclusion for User Plane Path Failure","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.844,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173033.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173034","title":"User Plane Path Failure","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"C4-173208","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173034.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173035","title":"User Plane Path Failure","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-04-28 15:48:20","uploaded":"2017-05-05 11:52:32","revisionof":"","revisedto":"C4-173206","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":348.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173035.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173059","title":"Disc, Work planning for CUPS","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"discussion","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2017-05-02 08:31:42","uploaded":"2017-05-05 12:53:06","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173059.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173060","title":"Pseudo-CR on Reference to SGW-U selection","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-02 08:31:42","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.844,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173060.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173061","title":"CUPS restoration procedures","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:42","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173196","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":351.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173061.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173062","title":"Pseudo-CR on Restoration","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:43","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173200","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173062.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173063","title":"Pseudo-CR on Restart counter","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:43","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173215","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173063.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173064","title":"Partial failure handling for CUPS","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:43","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173216","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":352.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173064.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173065","title":"Pseudo-CR on Partial failure for CUPS","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:43","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173217","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173065.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173066","title":"Pseudo-CR on UP feature for CP buffering","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173222","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173066.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173067","title":"Pseudo-CR on CP support of F-TEID allocation in UP","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173067.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173068","title":"Pseudo-CR on error reporting","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173267","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173068.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173069","title":"Pseudo-CR on OCI association in UP function","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173268","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173069.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173070","title":"Pseudo-CR on Definition of Node ID IE","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173269","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173070.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173071","title":"Pseudo-CR on Buffered data in CP fucntion","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173223","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173071.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173072","title":"Pseudo-CR on drafting guidelines and Editor's notes","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173072.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173073","title":"Remove FFS about QER correlation ID","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173272","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173073.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173074","title":"Remove FFS about QER","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173273","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173074.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173075","title":"Remove FFS about Sx association release","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173274","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173075.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173076","title":"Remove FFS about QER and URR handling on CP and UP","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173275","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173076.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173077","title":"UP function selection by DNS","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:44","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173277","release":"Rel-14","crspec":29.303,"crspecversion":"14.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":97.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173077.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173078","title":"Packets segmentation handling","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:45","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173276","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173078.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173079","title":"Clarification about URR creation for charging key","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 08:31:45","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173226","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173079.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173094","title":"Pseudo-CR on the clarification for Combined SGW\/PGW Architecture","source":"Ericsson","contact":"Yong Yang","contact-id":42295,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 11:55:49","uploaded":"2017-05-05 14:07:59","revisionof":"","revisedto":"C4-173221","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173094.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173098","title":"Pseudo-CR on the clarification for Outer Header Creation and Outer Header Removal","source":"Ericsson","contact":"Yong Yang","contact-id":42295,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-02 12:19:09","uploaded":"2017-05-05 14:07:59","revisionof":"","revisedto":"C4-173197","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173098.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173099","title":"Pseudo-CR on the clarification for CP and UP selection functions","source":"Ericsson","contact":"Yong Yang","contact-id":42295,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-02 12:44:13","uploaded":"2017-05-05 14:07:59","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173099.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173100","title":"Sx service parameters","source":"Ericsson","contact":"Yong Yang","contact-id":42295,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-03 07:41:37","uploaded":"2017-05-05 14:07:59","revisionof":"","revisedto":"C4-173278","release":"Rel-14","crspec":23.003,"crspecversion":"14.3.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":471.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173100.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173169","title":"Pseudo-CR on Envelope Reporting","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-05 09:10:47","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"C4-173225","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173169.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173170","title":"Clarification about URR creation for charging key","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-05 09:10:47","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173170.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173171","title":"Clarification on Multiple CP functions for one UP function","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2017-05-05 09:10:47","uploaded":"2017-05-05 10:42:26","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173171.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173172","title":"Miscellaneous corrections","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-05 09:30:50","uploaded":"2017-05-05 16:51:41","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173172.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173173","title":"Activating or deactivating a predefined group of PCC\/ADC rules","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-05 10:46:12","uploaded":"2017-05-05 11:23:05","revisionof":"","revisedto":"C4-173227","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173173.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173174","title":"Correction to the Usage Report within Sx Session Report","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-05 10:46:12","uploaded":"2017-05-05 11:23:05","revisionof":"","revisedto":"C4-173264","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173174.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173175","title":"Removal of the Editor\u2019s Notes for Usage monitoring and charging","source":"Huaiwei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-05 10:46:12","uploaded":"2017-05-05 11:23:05","revisionof":"","revisedto":"C4-173265","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173175.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173176","title":"Tariff Change Time for Offline Charging","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2017-05-05 10:46:12","uploaded":"2017-05-05 11:23:05","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173176.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173178","title":"Pseudo-CR on Sx-u tunnel related description and procedures","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-05 12:41:02","uploaded":"2017-05-05 13:02:19","revisionof":"","revisedto":"C4-173191, C4-173194","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173178.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173187","title":"Application for a Port Number and\/or Service Name \"PFCP-dest-port\"","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-08 16:27:08","uploaded":"2017-05-08 22:39:10","revisionof":"","revisedto":"C4-173219","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173187.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173191","title":"Pseudo-CR on Sx-u tunnel related description and procedures","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2017-05-10 12:57:05","uploaded":null,"revisionof":"C4-173178","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173192","title":"Credit pooling","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2017-05-09 20:55:39","uploaded":"2017-05-10 13:51:00","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173192.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173193","title":"QER and \u00a0FAR definition","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-09 20:55:39","uploaded":"2017-05-10 13:51:00","revisionof":"","revisedto":"C4-173321","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173193.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173194","title":"Pseudo-CR on Sx-u tunnel related description and procedures","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-10 13:05:17","uploaded":"2017-05-10 13:51:00","revisionof":"C4-173178","revisedto":"C4-173266","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173194.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173196","title":"CUPS restoration procedures","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-10 13:14:35","uploaded":"2017-05-11 15:37:35","revisionof":"C4-173061","revisedto":"C4-173209","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":351.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173196.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173197","title":"Pseudo-CR on the clarification for Outer Header Creation and Outer Header Removal","source":"Ericsson, Nokia, Alcatel-Lucent Shanghai Bell","contact":"Yong Yang","contact-id":42295,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-10 13:24:28","uploaded":"2017-05-12 07:54:14","revisionof":"C4-173098","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173197.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173200","title":"Pseudo-CR on Restoration","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-11 15:38:39","uploaded":"2017-05-11 15:46:20","revisionof":"C4-173062","revisedto":"C4-173213","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173200.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173205","title":"Downlink Data Report per FAR","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 02:27:01","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173031","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173205.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173206","title":"User Plane Path Failure","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 02:32:19","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173035","revisedto":"","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":348.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173206.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173208","title":"User Plane Path Failure","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 03:11:06","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173034","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173208.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173209","title":"CUPS restoration procedures for SGW","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 03:31:49","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173196","revisedto":"C4-173326","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":351.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173209.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173210","title":"CUPS restoration procedures for PGW","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 03:39:19","uploaded":"2017-05-19 04:17:52","revisionof":"","revisedto":"C4-173327","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":353.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173210.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173211","title":"CUPS restoration procedures for PFCP","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 03:41:26","uploaded":"2017-05-19 04:17:52","revisionof":"","revisedto":"C4-173328","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":354.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173211.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173212","title":"Reply LS on lawful interception in split EPC architecture","source":"SA3-LI","contact":"Nagaraja Rao","contact-id":67300,"tdoctype":"LS in","for":"Discussion","abstract":"SA3-LI thanks CT4 for the reply LS on \u201cConclusion on lawful interception in split EPC architecture\u201d and understands that CT4 requires assistance from SA3 LI to complete the stage 3 work on CUPS in clarifying the LI requirements on the packets dropped within the intercepting node.   \nSA3 LI discussed the topic and has the following clarification: \n-\tLI requirement is to intercept all the packets irrespective of whether they are dropped at the intercepting node. \nThere is no specific requirement to identify the dropped packets.","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2017-05-15 03:53:47","uploaded":"2017-05-19 04:17:52","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"CT4","Cc":"SA2","lsoriginalls":"S3i170157","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173212.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173213","title":"Pseudo-CR on Restoration","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 03:56:10","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173200","revisedto":"C4-173347","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173213.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173215","title":"Pseudo-CR on Restart counter","source":"Huawei, Ericsson","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 04:12:27","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173063","revisedto":"C4-173330","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173215.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173216","title":"Partial failure handling for CUPS","source":"Huawei, Ericsson","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 04:16:18","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173064","revisedto":"C4-173331","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":352.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173216.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173217","title":"Pseudo-CR on Partial failure for CUPS","source":"Huawei, Ericsson","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 04:29:22","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173065","revisedto":"C4-173332","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173217.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173218","title":"Clarification of usage of ephermal ports in Sx","source":"Cisco Systems","contact":"Arun Alex","contact-id":66713,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 06:11:30","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173012","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173218.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173219","title":"Application for a Port Number and\/or Service Name \"PFCP-dest-port\"","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 06:18:31","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173187","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173219.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173220","title":"Addition of indicator for Sxa\/Sxb\/Sxc","source":"Cisco Systems","contact":"Arun Alex","contact-id":66713,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 06:50:35","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173013","revisedto":"C4-173324","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173220.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173221","title":"Pseudo-CR on the clarification for Combined SGW\/PGW Architecture","source":"Ericsson","contact":"Yong Yang","contact-id":42295,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 06:52:45","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173094","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173221.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173222","title":"Pseudo-CR on UP feature for CP buffering","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 07:04:17","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173066","revisedto":"C4-173333","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173222.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173223","title":"Pseudo-CR on Buffered data in CP fucntion","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-15 07:19:37","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173071","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173223.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173224","title":"Online Charging","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 08:40:43","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173027","revisedto":"C4-173322","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173224.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173225","title":"Pseudo-CR on Envelope Reporting","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2017-05-15 09:00:43","uploaded":null,"revisionof":"C4-173169","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173226","title":"Clarification about URR creation for charging key","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 09:30:49","uploaded":"2017-05-19 07:47:53","revisionof":"C4-173079","revisedto":"C4-173367","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173226.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173227","title":"Activating or deactivating a predefined group of PCC\/ADC rules","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-15 10:05:38","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173173","revisedto":"C4-173323","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173227.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173264","title":"Correction to the Usage Report within Sx Session Report","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-17 06:29:48","uploaded":"2017-05-19 07:47:53","revisionof":"C4-173174","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173264.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173265","title":"Removal of the Editor\u2019s Notes for Usage monitoring and charging","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-17 06:38:17","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173175","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173265.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173266","title":"Pseudo-CR on Sx-u tunnel related description and procedures","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 07:13:09","uploaded":"2017-05-19 07:47:53","revisionof":"C4-173194","revisedto":"C4-173364","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173266.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173267","title":"Pseudo-CR on error reporting","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 07:30:59","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173068","revisedto":"C4-173334","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173267.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173268","title":"Pseudo-CR on OCI association in UP function","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 08:26:54","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173069","revisedto":"C4-173335","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173268.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173269","title":"Pseudo-CR on Definition of Node ID IE","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 08:29:14","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173070","revisedto":"C4-173336","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173269.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173272","title":"Remove FFS about QER correlation ID","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 08:52:45","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173073","revisedto":"C4-173338","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173272.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173273","title":"Remove FFS about QER","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-17 08:57:44","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173074","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173273.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173274","title":"Remove FFS about Sx association release","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 09:06:04","uploaded":"2017-05-19 07:47:53","revisionof":"C4-173075","revisedto":"C4-173366","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173274.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173275","title":"Remove FFS about QER and URR handling on CP and UP","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-17 09:10:44","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173076","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173275.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173276","title":"Packets segmentation handling","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-17 09:15:20","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173078","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173276.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173277","title":"UP function selection by DNS","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-17 09:34:33","uploaded":"2017-05-19 07:47:53","revisionof":"C4-173077","revisedto":"","release":"Rel-14","crspec":29.303,"crspecversion":"14.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":97.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173277.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173278","title":"Sx service parameters","source":"Ericsson","contact":"Yong Yang","contact-id":42295,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-17 09:40:08","uploaded":"2017-05-19 04:17:52","revisionof":"C4-173100","revisedto":"C4-173362","release":"Rel-14","crspec":23.003,"crspecversion":"14.3.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":471.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173278.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173321","title":"QER and \u00a0FAR definition","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 04:26:32","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173193","revisedto":"C4-173357","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173321.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173322","title":"Online Charging","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Bruno Landais","contact-id":68755,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 06:33:11","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173224","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173322.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173323","title":"Activating or deactivating a predefined group of PCC\/ADC rules","source":"Huawei","contact":"Yali Yan","contact-id":66362,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 06:34:23","uploaded":"2017-05-19 07:47:53","revisionof":"C4-173227","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173323.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173324","title":"Addition of indicator for Sxa\/Sxb\/Sxc","source":"Cisco Systems","contact":"Arun Alex","contact-id":66713,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 07:12:00","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173220","revisedto":"C4-173356","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173324.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173326","title":"CUPS restoration procedures for SGW","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 08:15:47","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173209","revisedto":"","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":351.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173326.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173327","title":"CUPS restoration procedures for PGW","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 08:24:13","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173210","revisedto":"C4-173346","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":353.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173327.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173328","title":"CUPS restoration procedures for PFCP","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 08:29:30","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173211","revisedto":"","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":354.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173328.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173330","title":"Pseudo-CR on Restart counter","source":"Huawei, Ericsson, Nokia, Alcatel-Lucent Shanghai Bell","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 08:52:08","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173215","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173330.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173331","title":"Partial failure handling for CUPS","source":"Huawei, Ericsson","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 08:58:33","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173216","revisedto":"","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":352.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173331.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173332","title":"Pseudo-CR on Partial failure for CUPS","source":"Huawei, Ericsson","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 08:59:54","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173217","revisedto":"C4-173348","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173332.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173333","title":"Pseudo-CR on UP feature for CP buffering","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 09:22:35","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173222","revisedto":"C4-173344","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173333.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173334","title":"Pseudo-CR on error reporting","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 09:30:06","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173267","revisedto":"C4-173349","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173334.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173335","title":"Pseudo-CR on OCI association in UP function","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 09:44:06","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173268","revisedto":"C4-173350","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173335.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173336","title":"Pseudo-CR on Definition of Node ID IE","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-18 09:53:49","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173269","revisedto":"C4-173351","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173336.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173338","title":"Remove FFS about QER correlation ID","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-18 10:28:35","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173272","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173338.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173344","title":"Pseudo-CR on UP feature for CP buffering","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 01:01:01","uploaded":"2017-05-19 04:27:52","revisionof":"C4-173333","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173344.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173346","title":"CUPS restoration procedures for PGW","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 01:14:45","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173327","revisedto":"","release":"Rel-14","crspec":23.007,"crspecversion":"14.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":353.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173346.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173347","title":"Pseudo-CR on Restoration","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 01:18:25","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173213","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173347.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173348","title":"Pseudo-CR on Partial failure for CUPS","source":"Huawei, Ericsson","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 01:26:18","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173332","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173348.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173349","title":"Pseudo-CR on error reporting","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 01:32:41","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173334","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173349.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173350","title":"Pseudo-CR on OCI association in UP function","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-19 01:38:46","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173335","revisedto":"C4-173365","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173350.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173351","title":"Pseudo-CR on Definition of Node ID IE","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 01:56:42","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173336","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173351.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173356","title":"Addition of indicator for Sxa\/Sxb\/Sxc","source":"Cisco Systems","contact":"Arun Alex","contact-id":66713,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2017-05-19 04:11:51","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173324","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173356.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173357","title":"QER and \u00a0FAR definition","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 04:12:48","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173321","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173357.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173360","title":"3GPP TS 29.244 v1.2.0","source":"Huawei Tech.(UK) Co., Ltd","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"draft TS","for":"Agreement","abstract":"Agreed as output TS in CT4#78. TS will be sent for approval in CT#76","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 06:12:07","uploaded":"2017-05-29 18:17:53","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173360.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173361","title":"3GPP TS 29.844 v1.2.0","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"draft TR","for":"Agreement","abstract":"Agreed as output TR in CT4#78. WIll be sent for approval in CT#76.","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 06:14:03","uploaded":"2017-05-29 18:17:53","revisionof":"","revisedto":"","release":"Rel-14","crspec":29.844,"crspecversion":"1.2.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173361.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173362","title":"Sx service parameters","source":"Ericsson LM","contact":"Yong Yang","contact-id":42295,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 06:18:14","uploaded":"2017-05-19 07:57:53","revisionof":"C4-173278","revisedto":"","release":"Rel-14","crspec":23.003,"crspecversion":"14.3.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":471.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"CP-171036","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173362.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173364","title":"Pseudo-CR on Sx-u tunnel related description and procedures","source":"Huawei Tech.(UK) Co., Ltd","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 06:31:25","uploaded":"2017-05-19 08:57:52","revisionof":"C4-173266","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173364.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173365","title":"Pseudo-CR on OCI association in UP function","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 06:42:29","uploaded":"2017-05-19 08:57:52","revisionof":"C4-173350","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173365.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173366","title":"Remove FFS about Sx association release","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2017-05-19 07:00:12","uploaded":"2017-05-19 08:57:52","revisionof":"C4-173274","revisedto":"C4-173369","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173366.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173367","title":"Clarification about URR creation for charging key","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 07:42:17","uploaded":"2017-05-19 08:57:52","revisionof":"C4-173226","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173367.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-173369","title":"Remove FFS about Sx association release","source":"Huawei","contact":"Peter Schmitt","contact-id":13753,"tdoctype":"pCR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"7.1.5","ainame":"CT aspects of Control and User Plane Separation of EPC nodes [CUPS-CT]","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2017-05-19 08:23:56","uploaded":"2017-05-19 08:57:52","revisionof":"C4-173366","revisedto":"","release":"Rel-14","crspec":29.244,"crspecversion":"1.1.0","workitem":[{"winame":"CUPS-CT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_78_Zhangiajie\/Docs\/C4-173369.zip","group":"C4","meeting":"C4-78","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]