[{"name":"SP-251347","title":"Presentation of TR 23.700-19 version 1.2.0: 'Study on Integration of satellite components in the 5G architecture; Phase 4' (FS_5GSAT_Ph4_ARC) for information","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"draft TR","for":"Information","abstract":"Abstract of document: The technical report includes key issue descriptions, solutions, and conclusions on the study on integration of satellite components in the 5GC architecture- phase 4 by covering following objectives: - Support of IMS voice call over NB-IoT NTN via GEO satellite connecting to EPC. - Enhancements for UE-SAT-UE communication with 5GS under NR NTN NGSO constellation with feeder link available. Changes since last presentation to TSG SA: This is the second presentation to TSG SA. The TR is considered 85% complete. KI#1 has been completed partially. Outstanding Issues: 1. KI#2 has not been completed yet as there is a contentious issue; 2. KI#3, KI#4 and KI#5 have not been completed due to time limitation. Contentious Issues: KI#2: Whether and how to support text based and\/or binary based IMS signalling during call setup procedure?","secretary_remarks":"Block noted.","agenda_item_sort_order":80,"ainumber":"7.1.2","ainame":"SA WG2 Specifications for Information","tdoc_agenda_sort_order":11880,"status":"noted","reservation_date":"2025-11-24 17:05:35","uploaded":"2025-12-01 15:41:08","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-19","crspecversion":"1.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_110_Baltimore_2025-12\/Docs\/SP-251347.zip","group":"SP","meeting":"SP-110","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-251348","title":"Presentation of TR 23.700-30 version 1.0.0: 'Study on Architecture support of Ambient power-enabled Internet of Things (AIoT); Phase 2' for Information","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"draft TR","for":"Information","abstract":"Abstract of document: The present document studies additional architecture support of Ambient IoT for the support of Rel-19 AIoT Devices defined in TS 23.369 in Topology 2 based on the RRC-based option as described in clause 8.1.3.3 of TR 23.700 13 and support for new AIoT Devices that will support the DO-A traffic type as described in the 'RAN WID Solutions for Ambient IoT (Internet of Things) in NR Phase 2' RP-251885 and 'RAN SID Study on enhancements for solutions for Ambient IoT (Internet of Things) in NR outdoor for active devices' RP-251884. Changes since last presentation to TSG SA: This is the first presentation to TSG SA sent for information. The TR is considered 75% complete. Outstanding Issues: - Key issue 1 has already used the 0.5 TU planned in the SID, and not been completed yet. However All editor's notes in the interim conclusion have been discussed and the way forward has been endorsed for the work in SA WG2#173. Therefore there is no need to request additional TU to finalize the conclusion for key issue 1. Contentious Issues: None","secretary_remarks":"Block noted.","agenda_item_sort_order":80,"ainumber":"7.1.2","ainame":"SA WG2 Specifications for Information","tdoc_agenda_sort_order":11890,"status":"noted","reservation_date":"2025-11-24 17:05:36","uploaded":"2025-12-01 15:41:08","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-30","crspecversion":"1.0.0","workitem":[{"winame":"FS_AmbientIoT_Ph2_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_110_Baltimore_2025-12\/Docs\/SP-251348.zip","group":"SP","meeting":"SP-110","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-251349","title":"Presentation of TR 23.700-56 v1.0.0: 'Study on system architecture enhancement for next generation real time communication phase 3; Stage 2' for Information","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"draft TR","for":"Information","abstract":"Abstract of document: The technical report includes key issue descriptions, solutions, and conclusions on the study Next Generation Real Tme Services by covering following objectives: - Support of Application Data Channel in alerting phase for early media - Enhancements to capability exposure framework for eMMTel Services - Supporting dynamic configuration of MDC2 endpoints Changes since last presentation to TSG SA: This is the first presentation to TSG SA. The TR is considered 80% complete. Outstanding Issues: Determining study conclusions, principles, and aspects to be specified during normative work. Contentious Issues: None - Study is progressing as planned and is expected to complete in Q1 2026.","secretary_remarks":"Block noted.","agenda_item_sort_order":80,"ainumber":"7.1.2","ainame":"SA WG2 Specifications for Information","tdoc_agenda_sort_order":11900,"status":"noted","reservation_date":"2025-11-24 17:05:36","uploaded":"2025-12-01 15:41:08","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-56","crspecversion":"1.0.0","workitem":[{"winame":"FS_NG_RTC_Ph3_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_110_Baltimore_2025-12\/Docs\/SP-251349.zip","group":"SP","meeting":"SP-110","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-251350","title":"Presentation of TR 23.700-65, version 1.0.0: 'Study on Short Message Service to Emergency Response Centre': for information","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"draft TR","for":"Information","abstract":"Abstract of document: The study item aims at investigating how to specify architectural and procedural enhancements to support Short Message Service to Emergency Response Centre in both EPS and 5GS for both roaming and non-roaming UEs, based on the requirements specified in TS 22.101 [6]. Changes since last presentation to TSG SA: This is the first presentation to TSG SA. This version contains the agreed architectural assumptions and requirements, solutions, and interim conclusions for Key Issue #1. The TR is considered 75% complete. Outstanding Issues: Determining remaining study conclusions, principles, and aspects to be specified during normative work. Contentious Issues: None - Study is progressing as planned and is expected to complete in Q1 2026.","secretary_remarks":"Block noted.","agenda_item_sort_order":80,"ainumber":"7.1.2","ainame":"SA WG2 Specifications for Information","tdoc_agenda_sort_order":11910,"status":"noted","reservation_date":"2025-11-24 17:05:37","uploaded":"2025-12-02 07:41:09","revisionof":"","revisedto":"","release":"Rel-20","crspec":"23.700-65","crspecversion":"1.0.0","workitem":[{"winame":"FS_SMS2EC_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_110_Baltimore_2025-12\/Docs\/SP-251350.zip","group":"SP","meeting":"SP-110","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]