[{"name":"S2-181422","title":"LS from NGNM Alliance: LS reply to ETSI ISG NFV on lifecycle management for 3GPP service based architecture","source":"NGNM Alliance","contact":"Dan Wang","contact-id":72661,"tdoctype":"LS in","for":"Information","abstract":"In March 2017 the NGMN Alliance approved the work item for 'Service-based architecture in 5G', with the objective to investigate the SBA approach from an operational perspective and to document the high-level requirements of the SBA approach, the related use cases, and guidelines for operators to leverage a service-based architecture in 5G. NGMN would like to thank ETSI ISG NFV for the feedback with questions. NGMN 5G SBA program has discussed the questions and the answers are shown below ETSI ISG NFV Q1) In NGMN view, is a 3GPP NF Service deployed only as part of a VNF (e.g. Location service as part of AMF), or is a 3GPP NF Service expected to be deployed independently, as a single VNF? a. If the Service is deployed as part of a VNF, do you require that some (or all) LCM operations to be performed independently of the other 3GPP 5GC NF Services that are composing that VNF, or not? NGMN SBA Answer: NGMN expects that 3GPP NF Services can be deployed independently, as a single VNF. NGMN","secretary_remarks":"Postponed S2-180022 from S2#125. Noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24790,"status":"noted","reservation_date":"2018-01-29 17:29:47","uploaded":"2018-02-01 17:35:41","revisionof":"S2-180022","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ETSI ISG NFV","Cc":"SA WG5, SA WG2","lsoriginalls":"NGNM-171124","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181422.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181430","title":"LS from GSMA PACKET: LS on the definition of the Mx functionality in support of the S8HR architecture","source":"GSMA PACKET","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"GSMA NG PACKET thanks SA WG2 and CT WG1 for their LS replies on using the Mx reference point for SRVCC in S8HR architecture. Following the discussion on this option, GSMA NG PACKET has identified the need for defining SRVCC for S8HR (MSC server enhanced and ATCF) based on the Mx reference point. Action: GSMA PACKET kindly requests SA WG2 to specify stage 2 details for SRVCC using the Mx reference point in support of the S8HR architecture (MSC server enhanced and ATCF) and CT WG1 to define the stage 3 details in the relevant specifications.","secretary_remarks":"Postponed S2-180773 from S2#125. It was decided to allow 0.5 session for this at the SA WG2#127BIS meeting in May 2018. This LS was then noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25090,"status":"noted","reservation_date":"2018-01-29 17:29:48","uploaded":"2018-02-01 17:35:41","revisionof":"S2-180773","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, CT WG1","Cc":"-","lsoriginalls":"PACKET_96_113","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181430.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181431","title":"LS from NGNM:  NGMN White Paper on Service-based Architecture in 5G","source":"NGNM","contact":"Klaus Moschner","contact-id":59428,"tdoctype":"LS in","for":"Information","abstract":"Intention of the LS and required actions: NGMN is pleased to inform the recipients of this liaison statement that the White Paper of the NGMN Service-based Architecture in 5G has been published. The deliverable has been created by NGMN Mobile Network Operator-Partners. The document describes a service framework including service registration, service authorization, and service discovery. Service-based Architecture for 5G is designed in a forward-looking manner, such that the functionalities in 5G Core Network (CN) consist of services, the interface between Control Plane (CP) and User Plane (UP) should be Service Based Interface (SBI) and the Data Service should be used. The deployment aspects of SBA are explored along with the gap analysis and recommendations for related SDOs. NGMN kindly requests the recipients of this liaison to take the content of this White Paper and the recommendations into account for their ongoing work on the industry-wide 5G architecture.","secretary_remarks":"Postponed S2-181110 from S2#125. Noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24800,"status":"noted","reservation_date":"2018-01-29 17:29:48","uploaded":"2018-02-01 17:35:41","revisionof":"S2-181110","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, SA WG5, ETSI ISG NFV, GSMA","Cc":"TSG SA, SA WG3, TSG CT, CT WG4","lsoriginalls":"180105 Liaison NGMN","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181431.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181674","title":"New SID: Enhancement of URLLC supporting in 5G","source":"Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo","contact":"Runze Zhou","contact-id":60945,"tdoctype":"SID new","for":"Approval","abstract":"This new SID proposal proposes a SI for enhancement of URLLC supporting in 5G","secretary_remarks":"Revised to S2-182542.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24840,"status":"revised","reservation_date":"2018-02-14 09:28:04","uploaded":"2018-02-20 09:46:50","revisionof":"S2-181074","revisedto":"S2-182542","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181674.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181725","title":"Update of PARLOS SID","source":"SA WG2","contact":"Nicolas Drevon","contact-id":16459,"tdoctype":"SID revised","for":"Approval","abstract":"Since the requirements are now clarified by SA WG1, this revision of FS_PARLOS_SA WG2 SID is required to update the the objectives as well as the completion date.","secretary_remarks":"Revised to S2-182753.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25030,"status":"revised","reservation_date":"2018-02-16 14:18:50","uploaded":"2018-02-20 14:11:51","revisionof":"","revisedto":"S2-182753","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"FS_PARLOS_SA2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181725.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181750","title":"Study on Network Slicing Phase-2","source":"ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, NTT DoCoMo(?), NEC(?),","contact":"Tricci So","contact-id":44974,"tdoctype":"SID new","for":"Approval","abstract":"Network slicing is one of the most important features in 5G. In Rel-15, there are open issues which were agreed to be deferred from Rel-15. In addition, SA WG1 is studying additional requirements to support different business role models for network slicing for Rel-16 in FS_BMNS. The intent of this SID is to consolidate these outstanding open issues and possible new requirements from FS_BMNS as well as other relevant stage one requirements which are applicable to Network slicing into one common study in Rel-16.","secretary_remarks":"Confirm sources. Revised to S2-182754.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25050,"status":"revised","reservation_date":"2018-02-17 10:00:25","uploaded":"2018-02-20 01:09:38","revisionof":"","revisedto":"S2-182754","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181750.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181767","title":"New SID on Enhanced support of Vertical and LAN Services","source":"Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"SID new","for":"Approval","abstract":"New SID on Enhanced support of Vertical and LAN Services","secretary_remarks":"Revised to S2-182543.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24870,"status":"revised","reservation_date":"2018-02-18 01:44:41","uploaded":"2018-02-20 14:31:19","revisionof":"S2-181382","revisedto":"S2-182543","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181767.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181777","title":"New SID - Study for single radio voice continuity from 5GS to 3G","source":"China Unicom, Huawei","contact":"Chi Ren","contact-id":72309,"tdoctype":"SID new","for":"Approval","abstract":"This paper proposes a new SI on single radio voice continuity from 5GS to 3G","secretary_remarks":"Revised to S2-182544.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24920,"status":"revised","reservation_date":"2018-02-18 04:05:49","uploaded":"2018-02-18 04:20:30","revisionof":"","revisedto":"S2-182544","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181777.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181901","title":"Enhanced SRVCC for S8HR","source":"Ericsson, Vodafone, Deutsche Telekom, NTT DoCoMo","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Approval","abstract":"This contribution proposes the introduction of eSRVCC for S8HR.","secretary_remarks":"Not Handled","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25100,"status":"not treated","reservation_date":"2018-02-19 13:34:53","uploaded":"2018-02-20 14:21:32","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181901.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181961","title":"5GMBS Study Item proposal","source":"Huawei, HiSilicon","contact":"Dario Serafino Tonesi","contact-id":43468,"tdoctype":"SID new","for":"Approval","abstract":"This document proposes a new SID on 5G multicast-broadcast services","secretary_remarks":"Revised to S2-182752.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25010,"status":"revised","reservation_date":"2018-02-19 16:23:41","uploaded":"2018-02-20 13:25:41","revisionof":"","revisedto":"S2-182752","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181961.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-181990","title":"New SID for Enhancements to the Service-Based 5G System Architecture","source":"Deutsche Telekom, China Mobile, AT&T, NTT Docomo, Sprint, Vodafone, KDDI, Verizon, CATT, BT Plc, Interdigital, Telecom Italia, China Telecom, SK Telecom, Telia Company AB, Ericsson, ZTE, KT, Orange, CATR, NEC","contact":"Tao Sun","contact-id":54129,"tdoctype":"SID new","for":"Approval","abstract":"New SID proposal to enhance SBA in R16. As the update of S2-181117.","secretary_remarks":"Revised to S2-182541.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24810,"status":"revised","reservation_date":"2018-02-19 17:50:51","uploaded":"2018-02-20 14:54:51","revisionof":"","revisedto":"S2-182541","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-181990.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182105","title":"Enabling core network sharing in Rel-16","source":"NICT","contact":"Stanislav Filin","contact-id":41055,"tdoctype":"discussion","for":"Discussion","abstract":"This discussion paper proposes to enable core network sharing in Rel-16","secretary_remarks":"Noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25150,"status":"noted","reservation_date":"2018-02-20 05:36:57","uploaded":"2018-02-20 05:39:20","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182105.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182109","title":"New SID on supporting Flexible Local Area Data Network","source":"LG Electronics","contact":"Hyunsook Kim","contact-id":42013,"tdoctype":"SID new","for":"Information","abstract":"This paper was submitted for the initial discussion and we would like to propose to have a discussion about Rel.16 LADN for the future meeting.","secretary_remarks":"Noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25110,"status":"noted","reservation_date":"2018-02-20 05:58:25","uploaded":"2018-02-20 08:27:08","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182109.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182135","title":"LS from SA WG1: LS on support of Voice Service Continuity from 5G System to UTRAN CS","source":"SA WG1","contact":"Kurt Bischinger","contact-id":26063,"tdoctype":"LS in","for":"Action","abstract":"In their LS SP-171078 SA plenary has tasked SA WG1, SA WG2 and SA WG3 to work on the support of Voice Service Continuity from 5G System to UTRAN CS. SA WG1 would like to inform that the attached CR was agreed. Action: Please take the requirements into account for your further work.","secretary_remarks":"Noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24910,"status":"noted","reservation_date":"2018-02-20 08:39:22","uploaded":"2018-02-20 09:17:56","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3, SA WG2","Cc":"TSG RAN, TSG SA","lsoriginalls":"S1-180595","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182135.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182205","title":"Study on Application Awareness Interworking between LTE and NR","source":"China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO","contact":"Biao Long","contact-id":57868,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this SID is to study the mechanisms to address use cases dealing with users being directed between LTE and NR accesses. Scenario 1: The LTE access node and NG-RAN access node are connected to EPC and 5GC respectively. (Inter-system redirection) Scenario 2: The E-UTRA access node and NG-RAN access node are connected to 5GC. (Intra-system redirection) Note: The study of scenario 2 if needed, to be considered within the context of the dual connectivity with the 5GC. Potential area of study includes, evaluating the mechanism available in 5G system as well as any potential enhancements that may be investigated to improve the potential shortcomings identified by the study use cases. NG-RAN remains making any final decisions regarding handover\/reselection\/redirection as RAN has the responsibility into radio and load conditions which govern the success of such a decision.","secretary_remarks":"S2-179533. Revised to S2-182284.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24960,"status":"revised","reservation_date":"2018-02-20 09:51:10","uploaded":"2018-02-20 12:22:35","revisionof":"S2-179533","revisedto":"S2-182284","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182205.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182230","title":"Discussion on Handover Enhancement","source":"OPPO","contact":"Jianhua Liu","contact-id":72698,"tdoctype":"discussion","for":"Discussion","abstract":"Discussion on handover challenge for real-time service and handover enhancement.","secretary_remarks":"Noted.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25160,"status":"noted","reservation_date":"2018-02-20 11:18:04","uploaded":"2018-02-20 11:25:30","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182230.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182269","title":"Study on enhancement of systems using EPS for Ultra Reliability using commodity equipment","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"SID new","for":"Approval","abstract":"This proposed SID is a follow up to S2-180749 and SP-171024 which highlighted the need for a system level approach to the economic provision of ultra-reliable networks for low latency communication. Those documents also highlighted the anticipated future availability of release 15 dual connectivity devices as a potential enabler for solutions.","secretary_remarks":"Revised to S2-182755.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25120,"status":"revised","reservation_date":"2018-02-20 14:29:35","uploaded":"2018-02-20 14:45:56","revisionof":"","revisedto":"S2-182755","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182269.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182284","title":"Study on Application Awareness Interworking between LTE and NR","source":"China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO","contact":"Biao Long","contact-id":57868,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The Objective: of this SID is to study the mechanisms to address use cases dealing with users being directed between LTE and NR accesses. Scenario 1: The LTE access node and NG-RAN access node are connected to EPC and 5GC respectively. (Inter-system redirection) Scenario 2: The E-UTRA access node and NG-RAN access node are connected to 5GC. (Intra-system redirection) Note: The study of scenario 2 if needed, to be considered within the context of the dual connectivity with the 5GC. Scenario 3: The LTE access node and NG-RAN access node are connected to EPC. (Intra-system redirection) Potential area of study includes evaluating the mechanism available in 5G system as well as any potential enhancements that may improve the potential shortcomings identified by the study use cases. NG-RAN remains making any final decisions regarding handover\/reselection\/redirection as RAN has the responsibility into radio and load conditions which govern the success of such a decision.","secretary_remarks":"Revision of S2-182205. LATE DOC: Rx 25\/02, 21:20. Revised off-line to S2-182740.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24970,"status":"revised","reservation_date":"2018-02-23 08:53:49","uploaded":"2018-02-26 10:47:54","revisionof":"S2-182205","revisedto":"S2-182740","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182284.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182493","title":"5WWC SID revision","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID for recofusing and update timeplan","secretary_remarks":"Revision of S2-181918. Revised to S2-182911.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25170,"status":"revised","reservation_date":"2018-02-28 21:27:35","uploaded":"2018-03-05 11:27:55","revisionof":"S2-181918","revisedto":"S2-182911","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182493.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182541","title":"New SID for Enhancements to the Service-Based 5G System Architecture","source":"Deutsche Telekom, China Mobile, AT&T, NTT Docomo, Sprint, Vodafone, KDDI, Verizon, CATT, BT Plc, Interdigital, Telecom Italia, China Telecom, SK Telecom, Telia Company AB, Ericsson, ZTE, KT, Orange, CATR, NEC, CHTTL, Nokia, Nokia Shanghai Bell, Samsung, Rogers, Telstra, KPN, Cisco, Huawei, HiSilicon","contact":"Tao Sun","contact-id":54129,"tdoctype":"SID new","for":"Approval","abstract":"New SID proposal to enhance SBA in R16. As the update of S2-181117.","secretary_remarks":"Revision of S2-181990. Revised to S2-182904.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24820,"status":"revised","reservation_date":"2018-02-26 19:36:13","uploaded":"2018-03-05 11:27:54","revisionof":"S2-181990","revisedto":"S2-182904","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182541.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182542","title":"New SID: Enhancement of URLLC supporting in 5G","source":"Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo, LG Electronics, Nokia, Nokia Shanghai Bell","contact":"Runze Zhou","contact-id":60945,"tdoctype":"SID new","for":"Approval","abstract":"This new SID proposal proposes a SI for enhancement of URLLC supporting in 5G","secretary_remarks":"Revision of S2-181674. Revised to S2-182905.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24850,"status":"revised","reservation_date":"2018-02-26 19:36:13","uploaded":"2018-03-05 11:27:54","revisionof":"S2-181674","revisedto":"S2-182905","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182542.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182543","title":"New SID on Enhanced support of Vertical and LAN Services","source":"Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"SID new","for":"Approval","abstract":"New SID on Enhanced support of Vertical and LAN Services","secretary_remarks":"Revision of S2-181767. Revised off-line to S2-182860.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24880,"status":"revised","reservation_date":"2018-02-26 19:36:13","uploaded":"2018-03-05 11:27:54","revisionof":"S2-181767","revisedto":"S2-182860","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182543.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182544","title":"New SID - Study for single radio voice continuity from 5GS to 3G","source":"China Unicom, Huawei","contact":"Chi Ren","contact-id":72309,"tdoctype":"SID new","for":"Approval","abstract":"This paper proposes a new SI on single radio voice continuity from 5GS to 3G","secretary_remarks":"Revision of S2-181777. Revised to S2-182907.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24930,"status":"revised","reservation_date":"2018-02-26 19:36:13","uploaded":"2018-03-05 11:27:54","revisionof":"S2-181777","revisedto":"S2-182907","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182544.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182740","title":"Study on Application Awareness Interworking between LTE and NR","source":"China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO, Verizon UK Ltd","contact":"Biao Long","contact-id":57868,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The Objective: of this SID is to study the mechanisms to address use cases dealing with users being directed between LTE and NR accesses. Scenario 1: The LTE access node and NG-RAN access node are connected to EPC and 5GC respectively. (Inter-system redirection) Scenario 2: The E-UTRA access node and NG-RAN access node are connected to 5GC. (Intra-system redirection) Note: The study of scenario 2 if needed, to be considered within the context of the dual connectivity with the 5GC. Scenario 3: The LTE access node and NG-RAN access node are connected to EPC. (Intra-system redirection) Potential area of study includes evaluating the mechanism available in 5G system as well as any potential enhancements that may improve the potential shortcomings identified by the study use cases. NG-RAN remains making any final decisions regarding handover\/reselection\/redirection as RAN has the responsibility into radio and load conditions which govern the success of such a decision.","secretary_remarks":"Revision of S2-182284. Revised to S2-182751.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24980,"status":"revised","reservation_date":"2018-02-28 02:03:49","uploaded":"2018-03-05 11:37:53","revisionof":"S2-182284","revisedto":"S2-182751","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182740.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182751","title":"Study on Application Awareness Interworking between LTE and NR","source":"China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO, Verizon UK Ltd","contact":"Biao Long","contact-id":57868,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The Objective: of this SID is to study the mechanisms to address use cases dealing with users being directed between LTE and NR accesses. Scenario 1: The LTE access node and NG-RAN access node are connected to EPC and 5GC respectively. (Inter-system redirection) Scenario 2: The E-UTRA access node and NG-RAN access node are connected to 5GC. (Intra-system redirection) Note: The study of scenario 2 if needed, to be considered within the context of the dual connectivity with the 5GC. Scenario 3: The LTE access node and NG-RAN access node are connected to EPC. (Intra-system redirection) Potential area of study includes evaluating the mechanism available in 5G system as well as any potential enhancements that may improve the potential shortcomings identified by the study use cases. NG-RAN remains making any final decisions regarding handover\/reselection\/redirection as RAN has the responsibility into radio and load conditions which govern the success of such a decision.","secretary_remarks":"Revision of S2-182740. Revised to S2-182908.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24990,"status":"revised","reservation_date":"2018-02-28 02:26:57","uploaded":"2018-03-05 11:37:53","revisionof":"S2-182740","revisedto":"S2-182908","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182751.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182752","title":"5GMBS Study Item proposal","source":"Huawei, HiSilicon","contact":"Dario Serafino Tonesi","contact-id":43468,"tdoctype":"SID new","for":"Approval","abstract":"This document proposes a new SID on 5G multicast-broadcast services","secretary_remarks":"Revision of S2-181961. This was postponed.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25020,"status":"postponed","reservation_date":"2018-02-28 02:26:57","uploaded":"2018-03-05 11:37:53","revisionof":"S2-181961","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182752.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182753","title":"Update of PARLOS SID","source":"SA WG2","contact":"Nicolas Drevon","contact-id":16459,"tdoctype":"SID revised","for":"Approval","abstract":"Since the requirements are now clarified by SA WG1, this revision of FS_PARLOS_SA WG2 SID is required to update the the objectives as well as the completion date.","secretary_remarks":"Revision of S2-181725. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25040,"status":"approved","reservation_date":"2018-02-28 02:26:57","uploaded":"2018-03-05 11:37:53","revisionof":"S2-181725","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"FS_PARLOS_SA2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182753.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182754","title":"Study on Network Slicing Phase-2","source":"ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, KDDI, NTT DoCoMo, NEC, AT&T, Ericsson","contact":"Tricci So","contact-id":44974,"tdoctype":"SID new","for":"Approval","abstract":"Network slicing is one of the most important features in 5G. In Rel-15, there are open issues which were agreed to be deferred from Rel-15. In addition, SA WG1 is studying additional requirements to support different business role models for network slicing for Rel-16 in FS_BMNS. The intent of this SID is to consolidate these outstanding open issues and possible new requirements from FS_BMNS as well as other relevant stage one requirements which are applicable to Network slicing into one common study in Rel-16.","secretary_remarks":"Revision of S2-181750. Revised in parallel session to S2-182909.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25060,"status":"revised","reservation_date":"2018-02-28 02:26:57","uploaded":"2018-03-05 11:37:53","revisionof":"S2-181750","revisedto":"S2-182909","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182754.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182755","title":"Study on enhancement of systems using EPS for Ultra Reliability using commodity equipment","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"SID new","for":"Approval","abstract":"This proposed SID is a follow up to S2-180749 and SP-171024 which highlighted the need for a system level approach to the economic provision of ultra-reliable networks for low latency communication. Those documents also highlighted the anticipated future availability of release 15 dual connectivity devices as a potential enabler for solutions.","secretary_remarks":"Revision of S2-182269. Revised to S2-182910.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25130,"status":"revised","reservation_date":"2018-02-28 02:26:57","uploaded":"2018-03-05 11:37:53","revisionof":"S2-182269","revisedto":"S2-182910","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182755.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182860","title":"New SID on Enhanced support of Vertical and LAN Services","source":"Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"SID new","for":"Approval","abstract":"New SID on Enhanced support of Vertical and LAN Services","secretary_remarks":"Revision of S2-182543. Revised to S2-182906.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24890,"status":"revised","reservation_date":"2018-03-02 14:39:00","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182543","revisedto":"S2-182906","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182860.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182904","title":"New SID for Enhancements to the Service-Based 5G System Architecture","source":"Deutsche Telekom, China Mobile, AT&T, NTT Docomo, Sprint, Vodafone, KDDI, Verizon, CATT, BT Plc, Interdigital, Telecom Italia, China Telecom, SK Telecom, Telia Company AB, Ericsson, ZTE, KT, Orange, CATR, NEC, CHTTL, Nokia, Nokia Shanghai Bell, Samsung, Rogers, Telstra, KPN, Cisco, Huawei, HiSilicon","contact":"Tao Sun","contact-id":54129,"tdoctype":"SID new","for":"Approval","abstract":"New SID proposal to enhance SBA in R16. As the update of S2-181117.","secretary_remarks":"Revision of S2-182541. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24830,"status":"approved","reservation_date":"2018-03-02 14:42:03","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182541","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182904.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182905","title":"New SID: Enhancement of URLLC supporting in 5G","source":"Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo, LG Electronics, Nokia, Nokia Shanghai Bell, ZTE","contact":"Runze Zhou","contact-id":60945,"tdoctype":"SID new","for":"Approval","abstract":"This new SID proposal proposes a SI for enhancement of URLLC supporting in 5G","secretary_remarks":"Revision of S2-182542. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24860,"status":"approved","reservation_date":"2018-03-02 14:42:03","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182542","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182905.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182906","title":"New SID on Enhanced support of Vertical and LAN Services","source":"Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"SID new","for":"Approval","abstract":"New SID on Enhanced support of Vertical and LAN Services","secretary_remarks":"Revision of S2-182860. Withdrawn (not provided).","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24900,"status":"withdrawn","reservation_date":"2018-03-02 14:42:03","uploaded":null,"revisionof":"S2-182860","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182907","title":"New SID - Study for single radio voice continuity from 5GS to 3G","source":"China Unicom, Huawei","contact":"Chi Ren","contact-id":72309,"tdoctype":"SID new","for":"Approval","abstract":"This paper proposes a new SI on single radio voice continuity from 5GS to 3G","secretary_remarks":"Revision of S2-182544. Revised to S2-182912.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24940,"status":"revised","reservation_date":"2018-03-02 14:42:03","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182544","revisedto":"S2-182912","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182907.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182908","title":"Study on Application Awareness Interworking between LTE and NR","source":"China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO, Verizon UK Ltd, AT&T","contact":"Biao Long","contact-id":57868,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The Objective: of this SID is to study the mechanisms to address use cases dealing with users being directed between LTE and NR accesses. Scenario 1: The LTE access node and NG-RAN access node are connected to EPC and 5GC respectively. (Inter-system redirection) Scenario 2: The E-UTRA access node and NG-RAN access node are connected to 5GC. (Intra-system redirection) Note: The study of scenario 2 if needed, to be considered within the context of the dual connectivity with the 5GC. Scenario 3: The LTE access node and NG-RAN access node are connected to EPC. (Intra-system redirection) Potential area of study includes evaluating the mechanism available in 5G system as well as any potential enhancements that may improve the potential shortcomings identified by the study use cases. NG-RAN remains making any final decisions regarding handover\/reselection\/redirection as RAN has the responsibility into radio and load conditions which govern the success of such a decision.","secretary_remarks":"Revision of S2-182751. Revised to S2-182994.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25000,"status":"revised","reservation_date":"2018-03-02 14:42:03","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182751","revisedto":"S2-182994","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182908.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182909","title":"Study on Network Slicing Phase-2","source":"ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, KDDI, NTT DoCoMo, NEC, AT&T, Ericsson, LG, Lenovo, Motorola Mobility, China Mobile, CATR (?), CATT (?), Huawei (?)","contact":"Tricci So","contact-id":44974,"tdoctype":"SID new","for":"Approval","abstract":"Network slicing is one of the most important features in 5G. In Rel-15, there are open issues which were agreed to be deferred from Rel-15. In addition, SA WG1 is studying additional requirements to support different business role models for network slicing for Rel-16 in FS_BMNS. The intent of this SID is to consolidate these outstanding open issues and possible new requirements from FS_BMNS as well as other relevant stage one requirements which are applicable to Network slicing into one common study in Rel-16.","secretary_remarks":"Revision of S2-182754. Revised to S2-182913.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25070,"status":"revised","reservation_date":"2018-03-02 14:42:03","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182754","revisedto":"S2-182913","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182909.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182910","title":"Study on enhancement of systems using EPS for Ultra Reliability using commodity equipment","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"SID new","for":"Approval","abstract":"This proposed SID is a follow up to S2-180749 and SP-171024 which highlighted the need for a system level approach to the economic provision of ultra-reliable networks for low latency communication. Those documents also highlighted the anticipated future availability of release 15 dual connectivity devices as a potential enabler for solutions.","secretary_remarks":"Revision of S2-182755. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25140,"status":"approved","reservation_date":"2018-03-02 14:42:04","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182755","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182910.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182911","title":"5WWC SID revision","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID for recofusing and update timeplan","secretary_remarks":"Revision of S2-182493. Faulty file uploaded. Revised to S2-183016.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25180,"status":"revised","reservation_date":"2018-03-02 14:42:04","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182493","revisedto":"S2-183016","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182911.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182912","title":"New SID - Study for single radio voice continuity from 5GS to 3G","source":"China Unicom, Huawei","contact":"Chi Ren","contact-id":72309,"tdoctype":"SID new","for":"Approval","abstract":"This paper proposes a new SI on single radio voice continuity from 5GS to 3G","secretary_remarks":"Revision of S2-182907. Approved. Deutsche Telekom objected to this as they consider the Scope of the work too limited.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":24950,"status":"approved","reservation_date":"2018-03-02 14:42:38","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182907","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182912.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182913","title":"Study on Network Slicing Phase-2","source":"ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, KDDI, NTT DoCoMo, NEC, AT&T, Ericsson, LG, Lenovo, Motorola Mobility, China Mobile, CATR , CATT, Huawei, Deutsche Telekom","contact":"Tricci So","contact-id":44974,"tdoctype":"SID new","for":"Approval","abstract":"Network slicing is one of the most important features in 5G. In Rel-15, there are open issues which were agreed to be deferred from Rel-15. In addition, SA WG1 is studying additional requirements to support different business role models for network slicing for Rel-16 in FS_BMNS. The intent of this SID is to consolidate these outstanding open issues and possible new requirements from FS_BMNS as well as other relevant stage one requirements which are applicable to Network slicing into one common study in Rel-16.","secretary_remarks":"Revision of S2-182909. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25080,"status":"approved","reservation_date":"2018-03-02 14:42:38","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182909","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182913.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-182994","title":"Study on Application Awareness Interworking between LTE and NR","source":"China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO, Verizon UK Ltd, AT&T","contact":"Biao Long","contact-id":57868,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The Objective: of this SID is to study the mechanisms to address use cases dealing with users being directed between LTE and NR accesses. Scenario 1: The LTE access node and NG-RAN access node are connected to EPC and 5GC respectively. (Inter-system redirection) Scenario 2: The E-UTRA access node and NG-RAN access node are connected to 5GC. (Intra-system redirection) Note: The study of scenario 2 if needed, to be considered within the context of the dual connectivity with the 5GC. Scenario 3: The LTE access node and NG-RAN access node are connected to EPC. (Intra-system redirection) Potential area of study includes evaluating the mechanism available in 5G system as well as any potential enhancements that may improve the potential shortcomings identified by the study use cases. NG-RAN remains making any final decisions regarding handover\/reselection\/redirection as RAN has the responsibility into radio and load conditions which govern the success of such a decision.","secretary_remarks":"Revision of S2-182908. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25001,"status":"approved","reservation_date":"2018-03-05 10:37:31","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182908","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-182994.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-183016","title":"5WWC SID revision","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID for recofusing and update timeplan","secretary_remarks":"Revision of S2-182911. Revised to S2-183026.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25181,"status":"revised","reservation_date":"2018-03-05 10:40:41","uploaded":"2018-03-05 11:37:54","revisionof":"S2-182911","revisedto":"S2-183026","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-183016.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-183026","title":"5WWC SID revision","source":"Huawei","contact":"Marco Spini","contact-id":8356,"tdoctype":"SID revised","for":"Approval","abstract":"Revised SID for recofusing and update timeplan","secretary_remarks":"Revision of S2-183016. Approved.","agenda_item_sort_order":48,"ainumber":"7.1","ainame":"New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals","tdoc_agenda_sort_order":25182,"status":"approved","reservation_date":"2018-03-05 10:41:02","uploaded":"2018-03-05 11:37:54","revisionof":"S2-183016","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5WWC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_126_Montreal\/Docs\/S2-183026.zip","group":"S2","meeting":"S2-126","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]