[{"name":"S5-226615","title":"Rel-18 pCR 28.829 Use case on Energy System Recovery","source":"Samsung","contact":"Erik Guttman","contact-id":18782,"tdoctype":"pCR","for":"Approval","abstract":"This pCR provides a use case to address objective 3 of the FS_NSOEU study.","secretary_remarks":"","agenda_item_sort_order":192,"ainumber":"6.9.3.9","ainame":"FS_NSOEU_WoP#9","tdoc_agenda_sort_order":100,"status":"revised","reservation_date":"2022-11-04 15:53:19","uploaded":"2022-11-04 15:59:10","revisionof":"","revisedto":"S5-226809","release":"Rel-18","crspec":28.829,"crspecversion":"0.4.0","workitem":[{"winame":"FS_NSOEU"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG5_TM\/TSGS5_146\/Docs\/S5-226615.zip","group":"S5","meeting":"S5-146","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"S5-226809","title":"Rel-18 pCR 28.829 Use case on Energy System Recovery","source":"Samsung","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":192,"ainumber":"6.9.3.9","ainame":"FS_NSOEU_WoP#9","tdoc_agenda_sort_order":101,"status":"approved","reservation_date":"2022-11-18 13:19:00","uploaded":"2022-11-18 13:19:00","revisionof":"S5-226615","revisedto":"","release":"Rel-18","crspec":28.829,"crspecversion":"0.4.0","workitem":[{"winame":"FS_NSOEU"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG5_TM\/TSGS5_146\/Docs\/S5-226809.zip","group":"S5","meeting":"S5-146","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]