[{"name":"S2-2003013","title":"EBI of default EPS bearer","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: SMF\/H-SMF indicates which EBI is default bearer to I-SMF\/V-SMF.","secretary_remarks":"e-meeting r02 agreed. Revised to S2-2003311.","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11680,"status":"revised","reservation_date":"2020-04-10 09:33:56","uploaded":"2020-04-10 16:00:53","revisionof":"","revisedto":"S2-2003311","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"TEI16"},{"winame":"5GS_Ph1"}],"crnumber":2247.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003013.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2003014","title":"CN tunnel info allocation for non roaming and LBO case","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: For Non roaming\/LBO case, the tunnel for EPS bearer should be allocated during PDU Session establishment\/modification procedure. Change step 2b in Figure 4.11.1.2.1-1 to the dot line. The PGW-C+SMF is not need to allocate tunnel for EPS bearer during IRAT handover preparation if it has been allocated before. The PGW-C+SMF is not need to allocate tunnel for EPS bearer during IRAT mobility if it has been allocated before.","secretary_remarks":"Confirm Specification Number - CR states 23.501! Revised to S2-2003208.","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11700,"status":"revised","reservation_date":"2020-04-10 09:33:57","uploaded":"2020-04-10 16:00:53","revisionof":"","revisedto":"S2-2003208","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"TEI16"},{"winame":"5GS_Ph1"}],"crnumber":2248.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003014.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2003027","title":"Fix the incorrect figure and description in 5GS - EPS HO.","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Correct the step 21 in the 5GS to EPS HO figure. Remove the V-SMF description in the step 8 in EPS to 5GS HO excution phase.","secretary_remarks":"e-meeting r02 agreed. Revised to S2-2003312.","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11730,"status":"revised","reservation_date":"2020-04-10 09:40:44","uploaded":"2020-04-10 11:34:02","revisionof":"","revisedto":"S2-2003312","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":2256.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003027.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2003208","title":"CN tunnel info allocation for non roaming and LBO case","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: For Non roaming\/LBO case, the tunnel for EPS bearer should be allocated during PDU Session establishment\/modification procedure. Change step 2b in Figure 4.11.1.2.1-1 to the dot line. The PGW-C+SMF is not need to allocate tunnel for EPS bearer during IRAT handover preparation if it has been allocated before. The PGW-C+SMF is not need to allocate tunnel for EPS bearer during IRAT mobility if it has been allocated before.","secretary_remarks":"Revision of S2-2003014. Original version agreed, clean up needed. Revised to S2-2003267.","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11710,"status":"revised","reservation_date":"2020-04-15 06:54:32","uploaded":"2020-04-15 07:01:41","revisionof":"S2-2003014","revisedto":"S2-2003267","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"TEI16"},{"winame":"5GS_Ph1"}],"crnumber":2248.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003208.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2003267","title":"CN tunnel info allocation for non roaming and LBO case","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: For Non roaming\/LBO case, the tunnel for EPS bearer can optionally be allocated during PDU Session Establishment\/Modification procedure. Change step 2b in Figure 4.11.1.2.1-1 to the dotted line. The PGW-C+SMF does not need to allocate tunnel for EPS bearer(s) during IRAT handover preparation if the CN tunnel info has been allocated before. The PGW-C+SMF does not need to allocate tunnel for EPS bearer(s) during IRAT idle mobility if the CN tunnel info has been allocated before.","secretary_remarks":"Revision of S2-2003208. Approved","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11720,"status":"agreed","reservation_date":"2020-04-27 09:07:59","uploaded":"2020-04-28 06:57:52","revisionof":"S2-2003208","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"TEI16"},{"winame":"5GS_Ph1"}],"crnumber":2248.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"SP-200552","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003267.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2003311","title":"EBI of default EPS bearer","source":"Huawei, HiSilicon, Ericsson","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: SMF\/H-SMF indicates which EBI is the default bearer to the I-SMF\/V-SMF.","secretary_remarks":"Revision of S2-2003013. Approved","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11690,"status":"agreed","reservation_date":"2020-04-27 09:08:56","uploaded":"2020-04-28 06:57:52","revisionof":"S2-2003013","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"TEI16"},{"winame":"5GS_Ph1"}],"crnumber":2247.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200552","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003311.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-2003312","title":"Fix the incorrect figure and description in 5GS - EPS HO.","source":"ZTE","contact":"Zhendong Li","contact-id":38521,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Corrects the step 21 in the 5GS to EPS HO figure. Removes the V-SMF description in the step 8 in EPS to 5GS HO excution phase.","secretary_remarks":"Revision of S2-2003027. Approved","agenda_item_sort_order":20,"ainumber":"6.9","ainame":"Interworking and Migration","tdoc_agenda_sort_order":11740,"status":"agreed","reservation_date":"2020-04-27 09:08:58","uploaded":"2020-04-28 06:57:52","revisionof":"S2-2003027","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.4.0","workitem":[{"winame":"5GS_Ph1"},{"winame":"TEI16"}],"crnumber":2256.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"SP-200551","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_138e_Electronic\/Docs\/S2-2003312.zip","group":"S2","meeting":"S2-ah-35701","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]