[{"name":"S2-1907344","title":"Removal of the EN how the network can re-activate the UP resources on non-3GPP access for a MA PDU Session","source":"MediaTek Inc.","contact":"Guillaume Sebire","contact-id":45073,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The description that the network can re-activate the user-plane resources over Non-3GPP access for a MA PDU session is added","secretary_remarks":"Merged into S2-1907795","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16310,"status":"merged","reservation_date":"2019-06-17 09:57:24","uploaded":"2019-06-18 13:26:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1566.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907344.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907345","title":"Removal of the EN how the network can re-activate the UP resources on non-3GPP access for a MA PDU Session","source":"MediaTek Inc.","contact":"Guillaume Sebire","contact-id":45073,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The description is to align with the description in clause 5.32.2 of TS 23.501","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16320,"status":"not treated","reservation_date":"2019-06-17 09:57:25","uploaded":"2019-06-18 13:26:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1548.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907345.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907346","title":"Discussion on ATSSS and interworking with EPS","source":"MediaTek Inc.","contact":"Guillaume Sebire","contact-id":45073,"tdoctype":"discussion","for":"Discussion","abstract":"This paper discusses how to handle an MA PDU session when the UE moves from 5GS to EPS and from EPS to 5GS","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16010,"status":"noted","reservation_date":"2019-06-17 09:57:26","uploaded":"2019-06-18 13:26:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"ATSSS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907346.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907347","title":"MA PDU session handling when UE moves between EPS and 5GS","source":"MediaTek Inc.","contact":"Guillaume Sebire","contact-id":45073,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Two parts are added to describe how the MA PDU session is handled when UE moves between EPS and 5GS 1) UE moves from 5GS to EPS 2) UE moves from EPS to 5GS","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16030,"status":"not treated","reservation_date":"2019-06-17 09:57:26","uploaded":"2019-06-18 13:26:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1567.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907347.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907348","title":"MA PDU session handling when UE moves between EPS and 5GS","source":"MediaTek Inc.","contact":"Guillaume Sebire","contact-id":45073,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Two parts are added to describe how the MA PDU session is handled when UE moves between EPS and 5GS 1) UE moves from 5GS to EPS 2) UE moves from EPS to 5GS","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16040,"status":"not treated","reservation_date":"2019-06-17 09:57:27","uploaded":"2019-06-18 13:26:38","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1549.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907348.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907356","title":"Interworking for MA-PDU Session","source":"OPPO, ITRI","contact":"Haorui Yang","contact-id":77684,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. A PDN Connection established in EPS can be changed into an MA PDU Session after having been moved from EPS to 5GS if the PGW-C+SMF supports ATSSS feature. Since ATSSS feature is not supported in EPS, the two tunnels of MA PDU Session can only be established in 5GS. 2. For interworking from EPC to 5GC, after moving to 5GC, UE updates ATSSS capability to PGW-C+SMF. After receiving UE's MA PDU Session Capability, PGW-C+SMF determines to whether to change this PDU Session to an MA PDU Session based on its support of ATSSS and local policies. If PGW-C+SMF decides to change, PGW-C+SMF responses MA PDU Session Indication and ATSSS rules to UE. 3. EBI allocation applies to all the QoS Flows established in MA PDU Session, independent to the access the QoS Flow is transmitted. SMF does not request EBI allocation when only user-plane resources over Non-3GPP access are established.","secretary_remarks":"Revised in parallel session to S2-1907807.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16110,"status":"revised","reservation_date":"2019-06-17 10:05:26","uploaded":"2019-06-18 10:04:33","revisionof":"","revisedto":"S2-1907807","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1571.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907356.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907359","title":"Interworking Procedures for MA PDU Session","source":"OPPO","contact":"Haorui Yang","contact-id":77684,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the interworking procedures for MA PDU Session.","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16150,"status":"not treated","reservation_date":"2019-06-17 10:08:02","uploaded":"2019-06-18 10:04:33","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1552.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907359.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907375","title":"Re-activation of MA PDU Session of Non-3GPP access for DL traffic","source":"OPPO","contact":"ChenHo CHIN","contact-id":80545,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: When DL data arrives for non-3GPP access of a MA PDU Session, and network knows of UE's non-3GPP access availability, the network initiates a notification procedure. Upon receiving the NOTIFICATION message, UE request re-activation of the user plane over non-3GPP access if non-3GPP access is available.","secretary_remarks":"Merged into S2-1907795","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16290,"status":"merged","reservation_date":"2019-06-17 10:37:17","uploaded":"2019-06-18 08:58:35","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1575.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907375.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907376","title":"Re-activation of MA PDU Session of Non-3GPP access for DL traffic","source":"OPPO","contact":"ChenHo CHIN","contact-id":80545,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Allow the UE, if non-3GPP access is avaialble, to respond to a notification procedure with Access Type = non-3GPP access, over the non-3GPP access to re-activate the user plane over non-3GPP.","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16300,"status":"not treated","reservation_date":"2019-06-17 10:37:18","uploaded":"2019-06-18 08:58:35","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1558.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907376.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907410","title":"Network request re-activation of user-plane resources","source":"ZTE","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revised in parallel session, merging S2-1907594, S2-1907567, S2-1907375 and S2-1907344, to S2-1907795.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16210,"status":"revised","reservation_date":"2019-06-17 13:07:31","uploaded":"2019-06-18 13:55:08","revisionof":"","revisedto":"S2-1907795","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1586.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907410.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907411","title":"Network request re-activation of user-plane resources","source":"ZTE","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revised in parallel session to S2-1907796.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16250,"status":"revised","reservation_date":"2019-06-17 13:07:32","uploaded":"2019-06-18 13:55:08","revisionof":"","revisedto":"S2-1907796","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1572.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907411.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907566","title":"Discussion on network initiated reactivation","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"discussion","for":"Discussion","abstract":"This paper discusses how to prevent packet loss during the PDU Session reactivation.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16160,"status":"noted","reservation_date":"2019-06-18 04:56:22","uploaded":"2019-06-18 09:51:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"ATSSS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907566.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907567","title":"Clarification on network initiated reactivation","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the related editor's note and clarify that if the user plane activation is failed, the UPF drops buffered packets. Clarify that the UE sends access availability \/ unavailability report to the network when the UE enters Non-Allowed Area \/ Allowed Area.","secretary_remarks":"Merged into S2-1907795","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16170,"status":"merged","reservation_date":"2019-06-18 04:56:22","uploaded":"2019-06-18 09:51:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1627.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907567.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907568","title":"Clarification on network behaviour in case of reactivation failuire","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove the related editor's note and clarify that if the user plane activation is failed, the UPF drops buffered packets.","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16180,"status":"not treated","reservation_date":"2019-06-18 04:56:23","uploaded":"2019-06-18 09:51:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1608.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907568.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907572","title":"Discussion on EPC interworking for MA PDU Session","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"discussion","for":"Discussion","abstract":"This paper discusses EPC interworking for MA PDU Session.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16020,"status":"noted","reservation_date":"2019-06-18 04:56:29","uploaded":"2019-06-18 09:51:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"ATSSS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907572.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907573","title":"EPS interworking for MA PDU","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a description on EPS interworking for MA PDU Session.","secretary_remarks":"Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16050,"status":"not treated","reservation_date":"2019-06-18 04:56:29","uploaded":"2019-06-18 09:51:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1629.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907573.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907574","title":"EPS interworking for MA PDU","source":"LG Electronics","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a description on EPS interworking for MA PDU Session.","secretary_remarks":"Revised in parallel session to S2-1907808.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16060,"status":"revised","reservation_date":"2019-06-18 04:56:30","uploaded":"2019-06-18 09:51:45","revisionof":"","revisedto":"S2-1907808","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1611.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907574.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907594","title":"Resolve EN in Clause 5.32.2","source":"ITRI","contact":"Samer Talat","contact-id":66527,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove an EN in Clause 5.32.2 by adding a note: Note: The re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session from network can refer to Network Triggered re-activation of UP connection of existing PDU Sessions as describe in clause 5.6.8.","secretary_remarks":"Wrong CR Rev number on cover sheet. Merged into S2-1907795","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16190,"status":"merged","reservation_date":"2019-06-18 07:03:59","uploaded":"2019-06-18 08:16:18","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1634.0,"crrevision":"","crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907594.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907596","title":"Resolve EN in Clause 4.22.7","source":"ITRI","contact":"Samer Talat","contact-id":66527,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Remove an EN in Clause 4.22.7 by adding a note: Note: The re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session from network can refer to Network Triggered Service Request procedure as describe in clause 4.2.3.3.","secretary_remarks":"Wrong CR Rev number on cover sheet. Not Handled","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16200,"status":"not treated","reservation_date":"2019-06-18 07:08:08","uploaded":"2019-06-18 08:16:18","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1615.0,"crrevision":"","crcategory":"D","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907596.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907795","title":"Network request re-activation of user-plane resources","source":"ZTE, LG Electronics?, OPPO?, MediaTek?, ITRI?","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revision of S2-1907410, merging S2-1907594, S2-1907567, S2-1907375 and S2-1907344. Revised in parallel session to S2-1907885.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16220,"status":"revised","reservation_date":"2019-07-04 09:07:33","uploaded":"2019-07-04 09:07:55","revisionof":"S2-1907410","revisedto":"S2-1907885","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1586.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907795.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907796","title":"Network request re-activation of user-plane resources","source":"ZTE, LG Electronics?, OPPO?, MediaTek?, ITRI?","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revision of S2-1907411. Revised in parallel session to S2-1907886.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16260,"status":"revised","reservation_date":"2019-07-04 09:07:35","uploaded":"2019-07-04 09:07:55","revisionof":"S2-1907411","revisedto":"S2-1907886","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1572.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907796.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907807","title":"Interworking for MA-PDU Session","source":"OPPO, ITRI","contact":"Haorui Yang","contact-id":77684,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. A PDN Connection established in EPS can be changed into an MA PDU Session after having been moved from EPS to 5GS if the PGW-C+SMF supports ATSSS feature. Since ATSSS feature is not supported in EPS, the two tunnels of MA PDU Session can only be established in 5GS. 2. For interworking from EPC to 5GC, after moving to 5GC, UE updates ATSSS capability to PGW-C+SMF. After receiving UE's MA PDU Session Capability, PGW-C+SMF determines to whether to change this PDU Session to an MA PDU Session based on its support of ATSSS and local policies. If PGW-C+SMF decides to change, PGW-C+SMF responses MA PDU Session Indication and ATSSS rules to UE. 3. EBI allocation applies to all the QoS Flows established in MA PDU Session, independent to the access the QoS Flow is transmitted. SMF does not request EBI allocation when only user-plane resources over Non-3GPP access are established.","secretary_remarks":"Revision of S2-1907356. Revised in parallel session to S2-1907883.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16120,"status":"revised","reservation_date":"2019-07-04 09:07:47","uploaded":"2019-07-04 09:07:55","revisionof":"S2-1907356","revisedto":"S2-1907883","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1571.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907807.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907808","title":"EPS interworking for MA PDU","source":"LG Electronics, Qualcomm Incorporated","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a description on EPS interworking for MA PDU Session.","secretary_remarks":"Revision of S2-1907574. Revised in parallel session to S2-1907884.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16070,"status":"revised","reservation_date":"2019-07-04 09:07:48","uploaded":"2019-07-04 09:07:55","revisionof":"S2-1907574","revisedto":"S2-1907884","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1611.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907808.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907883","title":"Interworking for MA-PDU Session","source":"OPPO, ITRI","contact":"Haorui Yang","contact-id":77684,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. A PDN Connection established in EPS can be changed into an MA PDU Session after having been moved from EPS to 5GS if the PGW-C+SMF supports ATSSS feature. Since ATSSS feature is not supported in EPS, the two tunnels of MA PDU Session can only be established in 5GS. 2. For interworking from EPC to 5GC, after moving to 5GC, UE updates ATSSS capability to PGW-C+SMF. After receiving UE's MA PDU Session Capability, PGW-C+SMF determines to whether to change this PDU Session to an MA PDU Session based on its support of ATSSS and local policies. If PGW-C+SMF decides to change, PGW-C+SMF responses MA PDU Session Indication and ATSSS rules to UE. 3. EBI allocation applies to all the QoS Flows established in MA PDU Session, independent to the access the QoS Flow is transmitted. SMF does not request EBI allocation when only user-plane resources over Non-3GPP access are established.","secretary_remarks":"Revision of S2-1907807. Revised in parallel session to S2-1907937.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16130,"status":"revised","reservation_date":"2019-07-04 09:09:08","uploaded":"2019-07-04 09:17:56","revisionof":"S2-1907807","revisedto":"S2-1907937","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1571.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907883.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907884","title":"EPS interworking for MA PDU","source":"LG Electronics, Qualcomm Incorporated","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a description on EPS interworking for MA PDU Session.","secretary_remarks":"Revision of S2-1907808. Revised in parallel session to S2-1907935.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16080,"status":"revised","reservation_date":"2019-07-04 09:09:09","uploaded":"2019-07-04 09:17:56","revisionof":"S2-1907808","revisedto":"S2-1907935","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1611.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907884.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907885","title":"Network request re-activation of user-plane resources","source":"ZTE","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revision of S2-1907795. Revised in parallel session to S2-1907940.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16230,"status":"revised","reservation_date":"2019-07-04 09:09:10","uploaded":"2019-07-04 09:17:56","revisionof":"S2-1907795","revisedto":"S2-1907940","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1586.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907885.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907886","title":"Network request re-activation of user-plane resources","source":"ZTE, LG Electronics, OPPO, MediaTek, ITRI","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revision of S2-1907796. Revised in parallel session to S2-1907939.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16270,"status":"revised","reservation_date":"2019-07-04 09:09:12","uploaded":"2019-07-04 09:17:56","revisionof":"S2-1907796","revisedto":"S2-1907939","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1572.0,"crrevision":2.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907886.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907935","title":"EPS interworking for MA PDU","source":"LG Electronics, Qualcomm Incorporated","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a description on EPS interworking for MA PDU Session.","secretary_remarks":"Revision of S2-1907884. Revised in parallel session to S2-1907938.","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16090,"status":"revised","reservation_date":"2019-07-04 09:09:59","uploaded":"2019-07-04 09:17:57","revisionof":"S2-1907884","revisedto":"S2-1907938","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1611.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907935.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907937","title":"Interworking for MA PDU Session","source":"OPPO, ITRI, LG Electronics, MediaTek Inc.","contact":"Haorui Yang","contact-id":77684,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: 1. A PDN Connection established in EPS can be changed into an MA PDU Session after having been moved from EPS to 5GS if the PGW-C+SMF supports ATSSS feature. Since ATSSS feature is not supported in EPS, the two tunnels of MA PDU Session can only be established in 5GS. 2. For interworking from EPC to 5GC, after moving to 5GC, UE updates ATSSS capability to PGW-C+SMF. After receiving UE's MA PDU Session Capability, PGW-C+SMF determines to whether to change this PDU Session to an MA PDU Session based on its support of ATSSS and local policies. If PGW-C+SMF decides to change, PGW-C+SMF responses MA PDU Session Indication and ATSSS rules to UE. 3. EBI allocation applies to all the QoS Flows established in MA PDU Session, independent to the access the QoS Flow is transmitted. SMF does not request EBI allocation when only user-plane resources over Non-3GPP access are established.","secretary_remarks":"Revision of S2-1907883. Agreed in parallel session. This was Block approved","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16360,"status":"agreed","reservation_date":"2019-07-04 09:10:01","uploaded":"2019-07-04 09:17:57","revisionof":"S2-1907883","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1571.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-190610","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907937.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907938","title":"EPS interworking for MA PDU","source":"LG Electronics, Qualcomm Incorporated, OPPO, MediaTek Inc.","contact":"Myungjune Youn","contact-id":60905,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add a description on EPS interworking for MA PDU Session.","secretary_remarks":"Revision of S2-1907935. Agreed in parallel session. This was Block approved","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16320,"status":"agreed","reservation_date":"2019-07-04 09:10:02","uploaded":"2019-07-04 09:17:57","revisionof":"S2-1907935","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1611.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"SP-190610","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907938.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907939","title":"Network request re-activation of user-plane resources","source":"ZTE, LG Electronics, OPPO, MediaTek, ITRI","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revision of S2-1907886. Agreed in parallel session. This was Block approved","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16500,"status":"agreed","reservation_date":"2019-07-04 09:10:03","uploaded":"2019-07-04 09:17:57","revisionof":"S2-1907886","revisedto":"","release":"Rel-16","crspec":23.502,"crspecversion":"16.1.1","workitem":[{"winame":"ATSSS"}],"crnumber":1572.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-190610","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907939.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1907940","title":"Network request re-activation of user-plane resources","source":"ZTE, LG Electronics, OPPO, MediaTek, ITRI","contact":"Jinguo Zhu","contact-id":32987,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add description on how network can request the re-activation of user-plane resources for the Non-3GPP access of the MA PDU Session","secretary_remarks":"Revision of S2-1907885. Agreed in parallel session. This was Block approved","agenda_item_sort_order":33,"ainumber":"6.8.1","ainame":"Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) - Exception","tdoc_agenda_sort_order":16460,"status":"agreed","reservation_date":"2019-07-04 09:10:05","uploaded":"2019-07-04 09:17:57","revisionof":"S2-1907885","revisedto":"","release":"Rel-16","crspec":23.501,"crspecversion":"16.1.0","workitem":[{"winame":"ATSSS"}],"crnumber":1586.0,"crrevision":3.0,"crcategory":"B","tsg_crp":"SP-190610","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_134_Sapporo\/Docs\/S2-1907940.zip","group":"S2","meeting":"S2-134","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]