[{"name":"S2-153791","title":"Architectural Requirements for Key Issue 3","source":"KDDI, Sprint, ZTE","contact":"Takeshi Usui","contact-id":59388,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes architectural requirements for Key issue 3: change of user plane session identity.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15620,"status":"revised","reservation_date":"2015-11-05 16:42:17","uploaded":"2015-11-11 09:40:40","revisionof":"","revisedto":"S2-154346","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153791.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153796","title":"Solution to key issue #2: Selection mechanism for user plane functional entities","source":"Cisco","contact":"Nirav Salot","contact-id":56645,"tdoctype":"pCR","for":"Approval","abstract":"Solution to key issue #2 'Selection mechanism for user plane functional entities' is proposed. The high level principle is to keep the logic for the selection mechanism of the user plane for a given functional entity with the control plane of the correspo","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15580,"status":"revised","reservation_date":"2015-11-06 10:15:17","uploaded":"2015-11-11 11:05:36","revisionof":"","revisedto":"S2-154269","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153796.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153797","title":"Solution to key issue# 3: Control plane changing the user plane session identity","source":"Cisco","contact":"Nirav Salot","contact-id":56645,"tdoctype":"pCR","for":"Approval","abstract":"This P-CR proposes solution to key issue# 3: Change of user plane session identity (due to other than UE mobility scenarios). It is proposed that the control plane initiates procedure and messaging for change of user plane session identity. High level des","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15640,"status":"revised","reservation_date":"2015-11-06 10:17:26","uploaded":"2015-11-11 11:05:36","revisionof":"","revisedto":"S2-154347","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153797.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153824","title":"Key issue for Online and Offline Charging Function Support in CP & UP separation","source":"KDDI, Sprint, ZTE, China Mobile","contact":"Takeshi Usui","contact-id":59388,"tdoctype":"pCR","for":"Approval","abstract":"This contribution describes the key issue for charging function when separating EPC architecture into control and user plane functions.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15680,"status":"revised","reservation_date":"2015-11-08 17:01:21","uploaded":"2015-11-11 09:34:00","revisionof":"","revisedto":"S2-154348","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153824.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153863","title":"Functional split","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a solution to Key issue 1 on functional split between control plane and use plane","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15490,"status":"merged","reservation_date":"2015-11-09 20:47:14","uploaded":"2015-11-11 13:32:34","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153863.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153880","title":"Key issue of interworking with legacy SGW\/PGW","source":"Intel, China Unicom","contact":"Changhong Shan","contact-id":45586,"tdoctype":"pCR","for":"Approval","abstract":"Propose a new key issue of interconnecting with legacy SGW\/PGW for FS_CUPS.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15720,"status":"noted","reservation_date":"2015-11-10 02:16:42","uploaded":"2015-11-10 07:15:25","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153880.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153884","title":"Architectural assumptions","source":"CATT","contact":"Yunjing Hou","contact-id":46707,"tdoctype":"pCR","for":"Approval","abstract":"It is proposed to add new architectural assumptions for FS_CUPS.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15440,"status":"revised","reservation_date":"2015-11-10 02:49:12","uploaded":"2015-11-10 07:58:43","revisionof":"","revisedto":"S2-154266","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153884.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153886","title":"Information exchange for S2a and S2b access","source":"CATT","contact":"Yunjing Hou","contact-id":46707,"tdoctype":"pCR","for":"Approval","abstract":"It is proposed to add a solution about the information exchange between the control plane function and the user plane function of PGW to support the GTP based S2a and S2b.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15550,"status":"available","reservation_date":"2015-11-10 04:06:06","uploaded":"2015-11-10 09:40:06","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153886.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153901","title":"Key issue of TAI list allocation","source":"ZTE, China Telecom, KDDI","contact":"Tricci So","contact-id":44974,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a new key issue of TAI list allocation and a solution to this key issue.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15730,"status":"revised","reservation_date":"2015-11-10 06:08:07","uploaded":"2015-11-11 09:09:15","revisionof":"","revisedto":"S2-154349","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153901.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153902","title":"Solution of TAI list allocation","source":"ZTE, China Telecom, KDDI","contact":"Tricci So","contact-id":44974,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a new key issue of TAI list allocation and a solution to this key issue","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15780,"status":"available","reservation_date":"2015-11-10 06:11:32","uploaded":"2015-11-11 09:09:16","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153902.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153903","title":"Functional partitioning proposal for S-GW, P-GW and TDF","source":"ZTE","contact":"Tricci So","contact-id":44974,"tdoctype":"pCR","for":"Approval","abstract":"This proposal presents the functional partitioning of S-GW, P-GW and TDF for the control and user plane separation study","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15540,"status":"merged","reservation_date":"2015-11-10 06:14:26","uploaded":"2015-11-11 09:09:16","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153903.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153942","title":"Key issue of interoperation with non-3GPP accesses","source":"China Telecom, ZTE","contact":"Biao Long","contact-id":55854,"tdoctype":"pCR","for":"Approval","abstract":"Propose a new key issue of interoperation with non-3GPP accesses for FS_CUPS.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15750,"status":"noted","reservation_date":"2015-11-10 19:46:45","uploaded":"2015-11-10 19:49:55","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153942.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153950","title":"Control plane and User plane functional split for S-GW, P-GW and TDF","source":"Nokia Networks","contact":"Devaki Chandramouli","contact-id":68275,"tdoctype":"pCR","for":"Approval","abstract":"In this contribution, the existing functionality of S-GW, P-GW and TDF is split into control and user plane functions.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15530,"status":"merged","reservation_date":"2015-11-10 20:49:40","uploaded":"2015-11-11 04:51:25","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153950.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-153999","title":"Solution to key issue 2 - UPE selection at CPE","source":"Huawei, HiSilicon","contact":"Runze Zhou","contact-id":60945,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes a solution for the key issue 2-selection mechanism for user plane functional entities.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15610,"status":"merged","reservation_date":"2015-11-11 01:52:23","uploaded":"2015-11-11 13:22:22","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-153999.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154000","title":"Lawful interception in split architectures","source":"Huawei, HiSilicon","contact":"Runze Zhou","contact-id":60945,"tdoctype":"discussion","for":"Approval","abstract":"This paper discusses lawful interception for split architectures.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15770,"status":"available","reservation_date":"2015-11-11 01:52:23","uploaded":"2015-11-11 13:22:38","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154000.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154001","title":"[DRAFT] LS on Lawful interception in split architectures","source":"Huawei, HiSilicon","contact":"Runze Zhou","contact-id":60945,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG3-LI. Attachment: S2-154000","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15760,"status":"noted","reservation_date":"2015-11-11 01:52:23","uploaded":"2015-11-11 13:22:39","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154001.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154022","title":"Solution to key issue 3: SGW-C initiated SGW-U relocation","source":"ZTE","contact":"Tricci So","contact-id":44974,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a solution to key issue 3: SGW-C initiated SGW-U relocation.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15670,"status":"merged","reservation_date":"2015-11-11 06:10:08","uploaded":"2015-11-11 09:09:15","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154022.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154054","title":"Existing functionality of S-GW, P-GW and TDF","source":"Huawei, HiSilicon","contact":"Mirko Schramm","contact-id":23396,"tdoctype":"pCR","for":"Approval","abstract":"The existing functionality of S-GW, P-GW and TDF is listed and structured in a table to have a common basis for all solution descriptions in the study.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15460,"status":"revised","reservation_date":"2015-11-11 09:03:45","uploaded":"2015-11-11 14:27:42","revisionof":"","revisedto":"S2-154267","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154054.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154088","title":"Solution to Key Issue 1 - User plane TEID and IP Address Allocation","source":"Huawei, HiSilicon","contact":"Runze Zhou","contact-id":60945,"tdoctype":"pCR","for":"Approval","abstract":"In this contribution, the function 'user plane TEID and IP address allocation' is discussed and a solution is proposed to address it.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15560,"status":"available","reservation_date":"2015-11-11 12:18:07","uploaded":"2015-11-11 13:40:52","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154088.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154089","title":"Solution to Key Issue 1 - Single gateway controller","source":"Huawei, HiSilicon","contact":"Runze Zhou","contact-id":60945,"tdoctype":"pCR","for":"Approval","abstract":"In this paper, an enhanced architecture with a single gateway controller is proposed as solution to key issue 1.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15570,"status":"available","reservation_date":"2015-11-11 12:18:07","uploaded":"2015-11-11 13:40:52","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154089.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154116","title":"Key Issue on Gx\/Gy support","source":"Alcatel-Lucent, Alcatel-Lucent Shanghai Bell","contact":"Laurent Thiebaut","contact-id":68713,"tdoctype":"pCR","for":"Approval","abstract":"addition of a Key issue on Gx\/Gy support","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15710,"status":"merged","reservation_date":"2015-11-11 14:21:01","uploaded":"2015-11-11 14:39:45","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154116.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154266","title":"Architectural assumptions","source":"CATT","contact":"Yunjing Hou","contact-id":46707,"tdoctype":"pCR","for":"Approval","abstract":"It is proposed to add new architectural assumptions for FS_CUPS.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15450,"status":"approved","reservation_date":"2015-11-23 11:57:43","uploaded":"2016-10-27 10:31:31","revisionof":"S2-153884","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154266.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154267","title":"Existing functionality of S-GW, P-GW and TDF","source":"Huawei, HiSilicon","contact":"Mirko Schramm","contact-id":23396,"tdoctype":"pCR","for":"Approval","abstract":"The existing functionality of S-GW, P-GW and TDF is listed and structured in a table to have a common basis for all solution descriptions in the study.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15470,"status":"revised","reservation_date":"2015-11-23 11:57:43","uploaded":"2016-10-27 10:31:31","revisionof":"S2-154054","revisedto":"S2-154350","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154267.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154268","title":"Functional split","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a solution to Key issue 1 on functional split between control plane and use plane","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15500,"status":"revised","reservation_date":"2015-11-23 11:57:43","uploaded":"2016-10-27 10:31:31","revisionof":"","revisedto":"S2-154351","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154268.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154269","title":"Solution to key issue #2: Selection mechanism for user plane functional entities","source":"Cisco","contact":"Nirav Salot","contact-id":56645,"tdoctype":"pCR","for":"Approval","abstract":"Solution to key issue #2 'Selection mechanism for user plane functional entities' is proposed. The high level principle is to keep the logic for the selection mechanism of the user plane for a given functional entity with the control plane of the correspo","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15590,"status":"revised","reservation_date":"2015-11-23 11:57:44","uploaded":"2016-10-27 10:31:31","revisionof":"S2-153796","revisedto":"S2-154421","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154269.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154346","title":"Solution Requirements for Key Issue 3","source":"KDDI, Sprint, ZTE, Sandvine, China Telecom","contact":"Takeshi Usui","contact-id":59388,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes architectural requirements for Key issue 3: change of user plane session identity.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15630,"status":"approved","reservation_date":"2015-11-23 11:57:58","uploaded":"2016-10-27 10:31:32","revisionof":"S2-153791","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154346.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154347","title":"Solution to key issue# 3: Control plane changing the user plane session identity","source":"Cisco, ZTE","contact":"Nirav Salot","contact-id":56645,"tdoctype":"pCR","for":"Approval","abstract":"This P-CR proposes solution to key issue# 3: Change of user plane session identity (due to other than UE mobility scenarios). It is proposed that the control plane initiates procedure and messaging for change of user plane session identity. High level des","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15650,"status":"revised","reservation_date":"2015-11-23 11:57:58","uploaded":"2016-10-27 10:31:32","revisionof":"S2-153797","revisedto":"S2-154422","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154347.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154348","title":"Key issue for Online and Offline Charging Function Support in CP & UP separation","source":"KDDI, Sprint, ZTE, China Mobile","contact":"Takeshi Usui","contact-id":59388,"tdoctype":"pCR","for":"Approval","abstract":"This contribution describes the key issue for charging function when separating EPC architecture into control and user plane functions.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15690,"status":"revised","reservation_date":"2015-11-23 11:57:58","uploaded":"2016-10-27 10:31:32","revisionof":"S2-153824","revisedto":"S2-154423","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154348.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154349","title":"Key issue of TAI list allocation","source":"ZTE, China Telecom, KDDI","contact":"Tricci So","contact-id":44974,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a new key issue of TAI list allocation and a solution to this key issue.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15740,"status":"approved","reservation_date":"2015-11-23 11:57:58","uploaded":"2016-10-27 10:31:32","revisionof":"S2-153901","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154349.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154350","title":"Existing functionality of S-GW, P-GW and TDF","source":"Huawei, HiSilicon, Allot Communications, Nokia Networks, ZTE, Cisco, Ericsson, Alcatel-Lucent, Intel, China Telecom","contact":"Mirko Schramm","contact-id":23396,"tdoctype":"pCR","for":"Approval","abstract":"The existing functionality of S-GW, P-GW and TDF is listed and structured in a table to have a common basis for all solution descriptions in the study.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15480,"status":"approved","reservation_date":"2015-11-23 11:57:58","uploaded":"2016-10-27 10:31:32","revisionof":"S2-154267","revisedto":"","release":"Rel-14","crspec":23.714,"crspecversion":"0.1.0","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154350.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154351","title":"Functional split","source":"Ericsson, Nokia Networks, ZTE, Allot Communications, Alcatel-Lucent, Huawei","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a solution to Key issue 1 on functional split between control plane and use plane","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15510,"status":"revised","reservation_date":"2015-11-23 11:57:58","uploaded":"2016-10-27 10:31:32","revisionof":"S2-154268","revisedto":"S2-154420","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154351.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154420","title":"Functional split","source":"Ericsson, Nokia Networks, ZTE, Allot Communications, Alcatel-Lucent, Huawei","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a solution to Key issue 1 on functional split between control plane and use plane","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15520,"status":"approved","reservation_date":"2015-11-23 11:58:15","uploaded":"2016-10-27 10:31:32","revisionof":"S2-154351","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"FS_CUPS"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154420.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154421","title":"Solution to key issue #2: Selection mechanism for user plane functional entities","source":"Cisco","contact":"Nirav Salot","contact-id":56645,"tdoctype":"pCR","for":"Approval","abstract":"Solution to key issue #2 'Selection mechanism for user plane functional entities' is proposed. The high level principle is to keep the logic for the selection mechanism of the user plane for a given functional entity with the control plane of the correspo","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15600,"status":"approved","reservation_date":"2015-11-23 11:58:16","uploaded":"2016-10-27 10:31:32","revisionof":"S2-154269","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154421.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154422","title":"Solution to key issue# 3: Control plane changing the user plane session identity","source":"Cisco, ZTE","contact":"Nirav Salot","contact-id":56645,"tdoctype":"pCR","for":"Approval","abstract":"This P-CR proposes solution to key issue# 3: Change of user plane session identity (due to other than UE mobility scenarios). It is proposed that the control plane initiates procedure and messaging for change of user plane session identity. High level des","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15660,"status":"approved","reservation_date":"2015-11-23 11:58:16","uploaded":"2016-10-27 10:31:32","revisionof":"S2-154347","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154422.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-154423","title":"Key issue for Online and Offline Charging Function Support in CP & UP separation","source":"KDDI, Sprint, China Mobile, China Telecom, ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Sandvine, Allot Communications","contact":"Takeshi Usui","contact-id":59388,"tdoctype":"pCR","for":"Approval","abstract":"This contribution describes the key issue for charging function when separating EPC architecture into control and user plane functions.","secretary_remarks":"","agenda_item_sort_order":23,"ainumber":"6.8","ainame":"Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)","tdoc_agenda_sort_order":15700,"status":"approved","reservation_date":"2015-11-23 11:58:16","uploaded":"2016-10-27 10:31:32","revisionof":"S2-154348","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_112_Anaheim\/Docs\/S2-154423.zip","group":"S2","meeting":"S2-112","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]