[{"name":"R5-235275","title":"LS on Extended rejected NSSAI IE in +C5GNSSAIRDP command","source":"TSG WG RAN5","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"LS out","for":"Approval","abstract":"see R5-234961.\nDuring RAN5#100 meeting, it has been brought to the attention of RAN5 that the AT+C5GNSSAIRDP command defined in TS 27.007 clause 10.1.63 doesn`t include the cause value, e.g. S-NSSAI not available due to maximum number of UEs reached as introduced in the Extended rejected NSSAI IE in TS 24.501 table 9.11.3.75.1. \nThe AT+C5GNSSAIRDP command is used in the formal conformance test cases defined under Rel-17 WI UE Conformance - Enhancement of Network Slicing Phase 2 Work Item to check that the rejected NSSAI list with cause \u2018S-NSSAI not available due to maximum number of UEs reached\u2019 is stored and deleted in the UE.\nRAN5 conformance test development of Rel-17 WI UE Conformance - Enhancement of Network Slicing Phase 2 Work Item cannot be completed without the extension of AT+C5GNSSAIRDP command.\n2. Actions: To CT1 group: RAN5 asks CT1 to update +C5GNSSAIRDP command to cover the Extended rejected NSSAI IE defined in TS 27.007 clause 10.1.63.","secretary_remarks":"","agenda_item_sort_order":1120,"ainumber":"6.7","ainame":"Outgoing liaison statements for provisional approval","tdoc_agenda_sort_order":49611,"status":"approved","reservation_date":"2023-03-09 09:29:06","uploaded":"2023-09-03 09:31:05","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"TEI17_Test"},{"winame":" eNS_Ph2-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG WG CT1","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG5_Test_ex-T1\/TSGR5__100_Toulouse\/Docs\/R5-235275.zip","group":"R5","meeting":"R5-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]