[{"name":"SP-230507","title":"New WID on Integrated Sensing and Communication (Sensing)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective is to introduce KPIs and 5G system functional requirements for wireless sensing service that will also cover: Configuration and authorization. Network Exposure. Charging, security and privacy aspects.","secretary_remarks":"Revised to add Cybercore as a supporting company in SP-230750","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11090,"status":"revised","reservation_date":"2023-05-31 12:20:58","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"SP-230750","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230507.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230509","title":"New WID on Mobile Metaverse Services (Metaverse)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This feature will capture the conclusions of the FS_Metaverse study, as documented in TR 22.856. In particular there are requirements in the following categories: - Localized Mobile Metaverse Service Functionality - Digital representation of users and avatar functionality - Operation efficiency, exposure, Coordination of metaverse services - Digital Asset Management - Security and Privacy aspects of mobile metaverse services - Charging requirements for mobile metaverse services KPIs that were concluded by the FS_Metaverse study will also be captured in normative specification. Corresponding terminology, references, etc. will also be specified, as needed.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11140,"status":"approved","reservation_date":"2023-05-31 12:26:48","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230509.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230511","title":"New WID on Indirect Network Sharing (NetShare)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: It is proposed to define normative requirements on Indirect Network Sharing based on the consolidated requirements in TR 22.851, which covers mobility, network access control, regulatory services, and charging aspects.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11190,"status":"approved","reservation_date":"2023-05-31 12:31:43","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230511.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230512","title":"New WID on FRMCS Phase 5 (FRMCS_Ph5)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective is to consider the findings identified in FS_FRMCS_Ph5 (requirements derived from enhanced use cases and new use cases) into normative stage 1 specifications. The findings include: 1. Enhancement of Ad hoc Group (alert or call) to support Railway Emergency Communication (REC) 2. Enhancement of location-based services (e.g., Mission-critical mobility service by leveraging sophisticated controllable location information along with high accuracy)","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11150,"status":"approved","reservation_date":"2023-05-31 12:34:24","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230512.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230514","title":"New WID on AI\/ML Model Transfer Phase2 (AIML_MT_Ph2)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective is to specify KPI and functional requirements for 5GS to support the AIML data transfer by leveraging direct device connection under 5G network control","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11110,"status":"approved","reservation_date":"2023-05-31 12:40:53","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230514.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230516","title":"New WID on Satellite access - Phase 3 (5GSAT_Ph3)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Using the consolidated potential requirements captured in TR 22.865 as baseline, the objective of this work item is to introduce normative service requirements related to the 5G system with satellite access for - Store and Forward Satellite operation - UE-Satellite-UE communication - GNSS independent operation - Positioning enhancements for satellite access - Other general enhancements aspects all related to the 5G system with satellite access including information collection via satellite connections.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11180,"status":"approved","reservation_date":"2023-05-31 12:48:12","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230516.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230518","title":"New WID on UAV Phase 3 (UAV_Ph3)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item is aiming at identifying and providing Stage 1 requirements in the following aspects to improve 5GS support of UAV applications, operations, and management. The objectives include: Further enhance the network support and exposure for UAV usage by introducing requirements on: o the prediction and monitoring of network conditions, connection availability, and QoS along a flight path; o flight path planning; o tracking of UAVs without network subscription; o reliability of command and control traffic for UAV; and o Provide flexible control of UAV communication over the identified flight zone. Further enhance the control, safety, and security of UAV operations by introducing requirements on: o the detection of 3GPP connected flying UAV using non-aerial subscriptions; o UAV to UAV-C VLoS constraint; o flight path deviation and violation; and o detection of non-3GPP connected flying objects.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11160,"status":"approved","reservation_date":"2023-05-31 12:53:20","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230518.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230520","title":"New WID on Energy Efficiency as Service Criteria (EnergyServ)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work is aiming at identifying and providing Stage 1 requirements regarding enhancement on energy efficiency of 5G network and application service enabler aspects in the following areas: Energy related information as Service Criteria. Support of different energy states of network elements and network functions. Optimization of 5G network functions based on energy related information. Temporary pooling of coverage layer for energy saving. Monitoring and measurement related to energy efficiency. Energy related information exposure. Security, charging and privacy.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11130,"status":"approved","reservation_date":"2023-05-31 13:02:41","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230520.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230521","title":"New WID on UE-to-UE multi-hop relay (UEMHopRelay)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective of this WID is to update the current requirements in TS22.280 and add requirements in TS22.261 as needed to define UE-to-UE multi-hop relay requirements for public safety.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11120,"status":"approved","reservation_date":"2023-05-31 13:25:59","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230521.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230523","title":"New WID on NPN security considerations (SecNPN)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Update the stage 1 requirements to address aspects related to the security of the PLMN when it hosts an NPN.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11170,"status":"approved","reservation_date":"2023-05-31 13:34:17","uploaded":"2023-06-02 14:27:53","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230523.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230692","title":"New WID on sharing of administrative configuration between interconnected MC service systems","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Develop Stage 2 normative technical procedures and information flows for supporting the exchange of administrative configuration and information between interconnected MC systems for all mission critical services (MCPTT, MCData and MCVideo) based on the key issues, solutions, and conclusions captured in 3GPP TR 23.700-38. The Stage 2 normative technical specification will include the following aspects: a. The functional architectural enhancements to support this mechanism that ensures secure exchange between MC systems. b. the exchange of administrative group configuration data between interconnected MC systems c. the exchange of administrative service configuration data between interconnected MC systems d. the exchange of relevant information for specific MC users to migrate in partner MC system e. the required configurations to enable using this mechanism.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11250,"status":"approved","reservation_date":"2023-06-05 16:51:03","uploaded":"2023-06-07 19:49:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230692.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230693","title":"New WID on support of the 5GMSG Service phase 3","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item is to develop application layer solutions where it is necessary to solve the remaining technical issues in Rel-18. The issues are including (but not limited to): 1) Develop technical solutions to fulfil the remaining stage 1 requirements, e.g. a) the [R-5.1.2-005] in TS TS22.262 and specify a delivery mechanism in the terminating side (not triggered by the requirement from sender) when the recipient is not registered. And also specify the how to handle the message when both the new delivery mechanism and Store and Forward in Rel-18 apply. b) the [R-5.1.2-001] in TS TS22.262 and solve the EN in clause 11.2, i.e. Whether MSGin5G Server can be deployed in EDN to fulfil the delay requirement specified in [R-5.1.2-001] of 3GPP TS 22.262 [2] is FFS; 2) Develop technical solutions to solve the remaining technical issues and ENs in Rel-18, e.g. develop a set of APIs provided by MSGin5G Client to support the Application Client via MSGin5G-5 reference point; and 3) Conduct clean-up, e.g solve ENs and procedures alignment. NOTE: For potential impacts to 5G system, coordination with SA WG2 will be necessary. For potential security requirements, coordination with SA WG3 will be necessary.","secretary_remarks":"Revised to SP-230781.","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11230,"status":"revised","reservation_date":"2023-06-05 16:51:03","uploaded":"2023-06-07 19:49:17","revisionof":"","revisedto":"SP-230781","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230693.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230694","title":"New WID on Railways specific Enhancements to Mission Critical Services","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Considering the use cases and the requirements from SA WG1 (and possibly from other 3GPP groups and different SDOs) and the results achieved in Rel-18, the objectives of the work include: 1. Specify several enhancements on ad hoc group communications, new procedures for all MC services to cover the gaps if any identified and ad hoc group emergency alerts (e.g., enhanced location information, migration, multi-talker feature, change criteria during an active communication, addition information IE, recording, merging of ad hoc groups) 2. Specify the architecture and procedures to support interworking with GSM-R for MCPTT private calls, MCPTT ad hoc group calls, MCData SDS and automatic subsequent MCPTT ad hoc group calls following an ad hoc group emergency alert. 3. Several enhancements and corrections to existing procedures to support Interconnection and Migration for Railways (e.g., functional alias, multi-talker feature) 4. Further enhancements to the existing architecture and procedures to support MC gateway Ues, e.g., migration, interconnection, support of multiple gateway Ues per service. 5. Specify the architecture and procedures to support the separation of the signalling and the media paths within an MC system.","secretary_remarks":"Revised to SP-230780.","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11210,"status":"revised","reservation_date":"2023-06-05 16:51:03","uploaded":"2023-06-07 19:49:17","revisionof":"","revisedto":"SP-230780","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230694.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230695","title":"New WID on Enhanced Mission Critical Architecture for Rel-19","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objectives include: 1. Review and identify requirements from Stage 1, which are applicable to the MC services, and are yet to be fully supported by the MC functional architecture and information flows, including new capabilities and features. This includes support MC architecture that need to be further specified for below items (but are not limited to): a. Enhancements related to MC Service Reliability improvements such as handling of bearer establishment failure for Group Calls; b. Further work to complete temporary MCX User with Limited Service mode (An MC user can use an MCX UE without requiring to Login); c. Discreet listening and logging for mission critical services; d. Expand the message storage coverage to also MCPTT and MCVideo services; e. Enhancements related to ongoing ETSI plug-tests and field tests for MC services; f. Enhancements to the existing procedures or specify new procedures for all MC services to cover the gaps if any identified, and g. Enhancements to support Broadband Callout Feature (A TETRA like mechanism to reliably alert personnel about incidents). 2. Analyze the overall MC architecture to identify those architectural aspects that have not been fully specified. 3. For those architectural aspects identified in objectives (1) and (2): - Specify the MC architectural requirements, procedures, information flows, and configuration parameters as needed. - Where the underlying requirements support MCPTT solutions that are applicable to MCVideo or MCData, specify these solutions such that they can be applied to these other services. This work item will build upon the stage 2 architecture developed for Release 18 and will provide for backward compatibility. Stage 2 architecture for MCPTT is contained both in 3GPP TS 23.280 and 3GPP TS 23.379.","secretary_remarks":"This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11200,"status":"approved","reservation_date":"2023-06-05 16:51:03","uploaded":"2023-06-07 19:49:17","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230695.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230733","title":"New WID on Further Enhancements for 5G multicast-broadcast services","source":"TCL Communication Ltd.","contact":"Ahmed Mohammed Mikaeil","contact-id":92321,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The goal of this work item is to specify the necessary enhancements to the 5G MBS architecture to support Objective: B uses-cases and to support media contents distribution over combination of a 5G terrestrial access, satellite access and non-3GPP DTT access networks. The detailed objectives of this work item are as listed below: 1. Study the necessary 5GS architecture enhancements to support objective B related uses-cases by supporting of FTA\/ROM modes, inter-gNB SFN operations for efficient media content distribution. 2. Study and specify architecture enhancements required to enable integration of MBS 5Gs and non-3GPP digital terrestrial TV (DTT) broadcasting systems. More specifically the enhancements related to, - Defining the architecture, network functions, entities and interfaces necessary for interworking of 5G MBS and DTT broadcasting systems. - Defining the interworking options for DTT and MBS i.e., whether is a service, a session, a transport and\/or an architecture-based. - Defining the delivery method for DTT services i.e., whether it is a per-session based delivery same as MBS and whether it will be delivered separately or simultaneously with MBS services. - Specifying the UP and CP signaling enhancements e.g., the enhancements related to headers and GTP-U tunnels configurations for delivery of MBS\/DTT services over the integrated 5G MBS and DTT broadcasting systems. - Other related aspects of enhancements if identified. NOTE 1A: Any impact on the non-3GPP digital terrestrial broadcast standard is out of scope of 3GPP standardization. 3. Study the required enhancements to enable MBS\/DTT media content delivery over satellite access. For example, enhancements related to the scenario when the network function e.g., a gNB or a UPF\/MB-UPF or both are delivered on-board of satellites, including studying and sspecifying, - The enhancements to address the issue of frequent MBS\/DTT session update, IP multicast session update and GTP-U tunnel end-points configuration change due to the movements satellite. - The enhancements to reduce the signaling messages impacts due to the MBS\/DTT mobility involving a large number of UEs per MBS\/DTT sessions. Inputs from RAN WGs are expected for meeting the objectives of this WID if identified or needed.","secretary_remarks":"UID needs to be allocated. Noted","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11080,"status":"noted","reservation_date":"2023-06-07 12:38:40","uploaded":"2023-06-07 17:56:04","revisionof":"","revisedto":"S2-2310426","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230733.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230750","title":"New WID on Integrated Sensing and Communication (Sensing)","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"WID new","for":"Approval","abstract":"Objective: The objective is to introduce KPIs and 5G system functional requirements for wireless sensing service that will also cover: Configuration and authorization. Network Exposure. Charging, security and privacy aspects.","secretary_remarks":"Revision of SP-230507. This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11100,"status":"approved","reservation_date":"2023-06-13 09:59:37","uploaded":"2023-06-14 01:54:06","revisionof":"SP-230507","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230750.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230780","title":"New WID on Railways specific Enhancements to Mission Critical Services","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: Considering the use cases and the requirements from SA WG1 (and possibly from other 3GPP groups and different SDOs) and the results achieved in Rel-18, the objectives of the work include: 1. Specify several enhancements on ad hoc group communications, new procedures for all MC services to cover the gaps if any identified and ad hoc group emergency alerts (e.g., enhanced location information, migration, multi-talker feature, change criteria during an active communication, addition information IE, recording, merging of ad hoc groups) 2. Specify the architecture and procedures to support interworking with GSM-R for MCPTT private calls, MCPTT ad hoc group calls, MCData SDS and automatic subsequent MCPTT ad hoc group calls following an ad hoc group emergency alert. 3. Several enhancements and corrections to existing procedures to support Interconnection and Migration for Railways (e.g., functional alias, multi-talker feature) 4. Further enhancements to the existing architecture and procedures to support MC gateway Ues, e.g., migration, interconnection, support of multiple gateway Ues per service. 5. Specify the architecture and procedures to support the separation of the signalling and the media paths within an MC system.","secretary_remarks":"Revision of SP-230694. This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11220,"status":"approved","reservation_date":"2023-06-16 05:51:45","uploaded":"2023-06-16 06:01:07","revisionof":"SP-230694","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230780.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-230781","title":"New WID on support of the 5GMSG Service phase 3","source":"SA WG6","contact":"Bernt Mattsson","contact-id":14585,"tdoctype":"WID new","for":"Approval","abstract":"Objective: This work item is to develop application layer solutions where it is necessary to solve the remaining technical issues in Rel-18. The issues are including (but not limited to): 1) Develop technical solutions to fulfil the remaining stage 1 requirements, e.g. a) the [R-5.1.2-005] in TS TS22.262 and specify a delivery mechanism in the terminating side (not triggered by the requirement from sender) when the recipient is not registered. And also specify the how to handle the message when both the new delivery mechanism and Store and Forward in Rel-18 apply. b) the [R-5.1.2-001] in TS TS22.262 and solve the EN in clause 11.2, i.e. Whether MSGin5G Server can be deployed in EDN to fulfil the delay requirement specified in [R-5.1.2-001] of 3GPP TS 22.262 [2] is FFS; 2) Develop technical solutions to solve the remaining technical issues and ENs in Rel-18, e.g. develop a set of APIs provided by MSGin5G Client to support the Application Client via MSGin5G-5 reference point; and 3) Conduct clean-up, e.g solve ENs and procedures alignment. NOTE: For potential impacts to 5G system, coordination with SA WG2 will be necessary. For potential security requirements, coordination with SA WG3 will be necessary.","secretary_remarks":"Revision of SP-230693. This WID NEW was approved","agenda_item_sort_order":37,"ainumber":"6.5","ainame":"New Release 19 Work Item Descriptions","tdoc_agenda_sort_order":11240,"status":"approved","reservation_date":"2023-06-16 05:51:45","uploaded":"2023-06-16 06:01:07","revisionof":"SP-230693","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_100_Taipei_2023-06\/Docs\/SP-230781.zip","group":"SP","meeting":"SP-100","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]