[{"name":"S2-1908676","title":"LS from RAN WG1: Reply LS on maximum value of MDBV","source":"RAN WG1","contact":"Peter Gaal","contact-id":57198,"tdoctype":"LS in","for":"Action","abstract":"RAN WG1 would like to thank SA WG2 for the LS on maximum value of MDBV. RAN WG1 has no expertise to provide input on the SA WG2 recommendation on 500 times increase in typical values of MDBV. Regarding the potential increase of the maximum allowed value of MDBV for signalled 5QI characteristics, RAN WG1 has no concern regarding RAN WG1 operation; however, in RAN WG1's opinion, other groups should make the final decision on if the value should be increased, and what should be the larger value (e.g. 2000 kBytes). Action: RAN WG1 kindly asks SA WG2 and other involved working groups to take the above information into account.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12300,"status":"noted","reservation_date":"2019-09-16 19:37:37","uploaded":"2019-09-16 21:37:53","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, RAN WG2, RAN WG3, CT WG3, CT WG4","Cc":"SA WG1","lsoriginalls":"R1-1909894","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908676.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908689","title":"LS from RAN WG2: Reply LS on LS on maximum value of MDBV","source":"RAN WG2","contact":"Masato Kitazoe","contact-id":29801,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 would like to thank SA WG2 for the LS on maximum value of MDBV. For SA WG2 recommendation on increasing the values of MDBV by 500 times, RAN WG2 concluded: - There is no impact to RAN WG2 specifications. - There will be impacts to RAN implementation to handle the larger MDBV values. - RAN WG2 did not identify a blocking issue with increasing the values of MDBV. RAN WG2 would like to remind SA WG2 that, as RAN WG2 indicated earlier in R2-1810956, there is still no consensus whether changes are needed to guarantee that the MDBV is never exceeded in uplink in all scenarios. Action: RAN WG2 requests SA WG2 and other involved working groups to take the above information into account.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12310,"status":"noted","reservation_date":"2019-09-16 19:37:38","uploaded":"2019-09-16 21:37:53","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, RAN WG1, CT WG3, CT WG4","Cc":"SA WG1","lsoriginalls":"R2-1911864","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908689.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908691","title":"LS from RAN WG3: Reply LS on LS on maximum value of MDBV","source":"RAN WG3","contact":"Luis Lopes","contact-id":47178,"tdoctype":"LS in","for":"Action","abstract":"RAN WG3 would like to thank SA WG2 for the LS on maximum value of MDBV. Regarding the potential increase of the maximum allowed value of MDBV for signalled 5QI characteristics, RAN WG3 has found no technical obstacles to implementing such an increase. RAN WG3 will wait for a recommendation on the new desired range before working on stage 3 support in RAN WG3 specifications. Action: RAN WG3 requests SA WG2 and other involved groups to take the above information into account, and to provide updates as needed.","secretary_remarks":"Response drafted in S2-1909612. Final response in S2-1910663","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12320,"status":"replied to","reservation_date":"2019-09-16 19:37:38","uploaded":"2019-09-16 21:37:53","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, RAN WG1, RAN WG2, CT WG3, CT WG4","Cc":"SA WG1","lsoriginalls":"R3-194553","lsreply":"S2-1910663","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908691.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1908984","title":"Reflective QoS","source":"Huawei, HiSilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: clarify that the SMF generate the UL PDR for the QoS authorization of the UL traffic of the SDF, and the SMF configures the timer, the SMF removes the UL PDR for the UL traffic of the SDF until the timer stops.","secretary_remarks":"Not Handled","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12440,"status":"not treated","reservation_date":"2019-09-30 12:28:09","uploaded":"2019-10-04 08:55:54","revisionof":"","revisedto":"S2-1911676","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1732.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1908984.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909111","title":"Corrections on Session-AMBR setting and enforcement","source":"Huawei, Hisilicon","contact":"Marco Spini","contact-id":8356,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: The following changes are proposed: A general statement about Session-AMBR enforcement in UPF is added to clause 5.7.1.8. The statements about the subscribed Session-AMBR are moved from clause 5.7.2.6 to 5.7.2.7. The description in 5.8.2.7 is simplified and a reference to clause 5.7.1.8 (which describes the details of the enforcement) is added. A sentence in clause 6.3.3.3 is slightly reworded to avoid the usage of 'per PDU Session AMBR enforcement' as this could be confused with Session-AMBR.","secretary_remarks":"Not Handled","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12450,"status":"not treated","reservation_date":"2019-10-01 14:51:07","uploaded":"2019-10-04 08:58:09","revisionof":"","revisedto":"S2-1911316","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"TEI16"},{"winame":"5GS_Ph1"}],"crnumber":1755.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909111.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909126","title":"Support for Application Rate Adaptation and Explicit Congestion Notification","source":"Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adding the ECN RFC and TS 26.114 in the reference part. The NG-RAN and the UE support the RFC 3168 Explicit Congestion Notification (ECN), as described in TS 38.300, TS 36.300 and TS 26.114. Clarify that QNC and ECN can not be used at the same time, if the QNC is used, the ECN is not used. Otherwise the ECN is used. Clarify the Application \/ Service Layer Rate Adaptation based on QNC and ECN.","secretary_remarks":"Revision of (noted) S2-1907135 from S2#134 Not Handled","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12460,"status":"not treated","reservation_date":"2019-10-01 16:29:58","uploaded":"2019-10-04 15:15:37","revisionof":"S2-1907135","revisedto":"","release":"Rel-15","crspec":"23.501","crspecversion":"15.7.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1502.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909126.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909127","title":"Support for Application Rate Adaptation and Explicit Congestion Notification","source":"Tencent","contact":"Chunshan Xiong","contact-id":79110,"tdoctype":"CR","for":"Approval","abstract":"Rel-16 mirror CR: Summary of change: Adding the ECN RFC and TS 26.114 in the reference part. The NG-RAN and the UE support the RFC 3168 Explicit Congestion Notification (ECN), as described in TS 38.300, TS 36.300 and TS 26.114. Clarify that QNC and ECN can not be used at the same time, if the QNC is used, the ECN is not used. Otherwise the ECN is used. Clarify the Application \/ Service Layer Rate Adaptation based on QNC and ECN.","secretary_remarks":"Revision of (noted) S2-1907136 from S2#134 Not Handled","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12470,"status":"not treated","reservation_date":"2019-10-01 16:29:59","uploaded":"2019-10-04 15:15:37","revisionof":"S2-1907136","revisedto":"S2-1911538","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1503.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909127.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909596","title":"Discussion on increasing the value for MDBV of standardized 5QIs","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Agreement","abstract":"This contribution addresses the discussion on the proposal to increase the MDBV value of the standardized 5QIs in TS 23.501.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12350,"status":"noted","reservation_date":"2019-10-03 20:31:29","uploaded":"2019-10-04 16:39:27","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_Ph1"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909596.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909602","title":"Support for Application \/ Service Layer Rate Adaptation","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Add the description for Application \/ Service Layer Rate Adaptation","secretary_remarks":"Not Handled","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12480,"status":"not treated","reservation_date":"2019-10-03 20:51:13","uploaded":"2019-10-04 18:25:15","revisionof":"","revisedto":"S2-1911047","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"},{"winame":"TEI16"}],"crnumber":1858.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909602.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909611","title":"Remove incorrect reasoning of default MDBV value setting","source":"Qualcomm Incorporated,","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Rephrase NOTE 3 Remove NOTE 3 from delay critical GBR 5QIs and place it somewhere which makes it relevant to PDB as a whole","secretary_remarks":"Revised in parallel session to S2-1910260.","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12390,"status":"revised","reservation_date":"2019-10-04 00:26:08","uploaded":"2019-10-04 19:13:05","revisionof":"","revisedto":"S2-1910260","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1860.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909611.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909612","title":"[DRAFT] Reply LS on LS on maximum value of MDBV","source":"QUALCOMM Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"LS out","for":"Approval","abstract":"SA WG2 would like to ask RAN WG3, CT WG3 and CT WG4 to update the stage 3 specifications to support a maximum allowed MDBV value of 2000 kbytes for signalled 5QI characteristics.","secretary_remarks":"Response to S2-1908691. Revised in parallel session to S2-1910261.","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12360,"status":"revised","reservation_date":"2019-10-04 00:38:40","uploaded":"2019-10-04 19:13:05","revisionof":"","revisedto":"S2-1910261","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_Ph1"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, CT WG4, CT WG3","Cc":"RAN WG1, RAN WG2, SA WG1","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909612.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909957","title":"LS from CT WG4: Reply LS to LS on maximum value of MDBV","source":"CT WG4","contact":"Bruno Landais","contact-id":68755,"tdoctype":"LS in","for":"Action","abstract":"CT WG4 thanks SA WG2 for their LS (S2-1907955) on maximum value of MDBV. CT WG4 has found no issue with implementing an increase of the maximum allowed value of MDBV for signalled 5QI characteristics. CT WG4 will wait for a recommendation on the new desired range before working on stage 3 support in CT WG4 specifications. Action: CT WG4 kindly asks SA WG2 group to take the above information into account and to provide a recommendation on the maximum allowed value of MDBV.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12330,"status":"noted","reservation_date":"2019-10-11 13:25:15","uploaded":"2019-10-11 13:25:45","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG1, RAN WG2, RAN WG3, CT WG3, SA WG1","lsoriginalls":"C4-194314","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909957.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1909971","title":"LS from CT WG3: LS Reply on maximum value of MDBV","source":"CT WG3","contact":"Horst Brinkmann","contact-id":70091,"tdoctype":"LS in","for":"Action","abstract":"CT WG3 thanks SA WG2 for their LS (S2-1907955) on maximum value of MDBV. CT WG3 has found no issue with implementing an increase of the maximum allowed value of MDBV for signalled 5QI characteristics. CT WG3 will wait for a recommendation on the new desired range before an agreement on the stage 3 support in specification 3GPP TS 29.512. Action: CT WG3 kindly asks SA WG2 group to take the above information into account and to inform CT WG3 about the SA WG2 recommendation.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12340,"status":"noted","reservation_date":"2019-10-15 06:40:04","uploaded":"2019-10-19 07:48:01","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG1, RAN WG2, RAN WG3, CT WG4, SA WG1","lsoriginalls":"C3-194330","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1909971.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910260","title":"Remove incorrect reasoning of default MDBV value setting","source":"Qualcomm Incorporated,","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Rephrase NOTE 3 Remove NOTE 3 from delay critical GBR 5QIs and place it somewhere which makes it relevant to PDB as a whole","secretary_remarks":"Revision of S2-1909611. Revised in parallel session to S2-1910662.","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12400,"status":"revised","reservation_date":"2019-10-15 06:41:21","uploaded":"2019-10-19 07:48:02","revisionof":"S2-1909611","revisedto":"S2-1910662","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1860.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910260.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910261","title":"[DRAFT] Reply LS on LS on maximum value of MDBV","source":"QUALCOMM Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"LS out","for":"Approval","abstract":"SA WG2 would like to ask RAN WG3, CT WG3 and CT WG4 to update the stage 3 specifications to support a maximum allowed MDBV value of 2000 kbytes for signalled 5QI characteristics.","secretary_remarks":"Revision of S2-1909612. Revised in parallel session to S2-1910663.","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12370,"status":"revised","reservation_date":"2019-10-15 06:41:22","uploaded":"2019-10-19 07:48:02","revisionof":"S2-1909612","revisedto":"S2-1910663","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_Ph1"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, CT WG4, CT WG3","Cc":"RAN WG1, RAN WG2, SA WG1","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910261.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910662","title":"Remove incorrect reasoning of default MDBV value setting","source":"Qualcomm Incorporated,","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Rephrase NOTE 3 Remove NOTE 3 from delay critical GBR 5QIs and place it somewhere which makes it relevant to PDB as a whole","secretary_remarks":"Revision of S2-1910260. Revised in parallel session to S2-1910727.","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12410,"status":"revised","reservation_date":"2019-10-19 05:43:18","uploaded":"2019-10-19 07:48:14","revisionof":"S2-1910260","revisedto":"S2-1910727","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1860.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910662.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910663","title":"Reply LS on LS on maximum value of MDBV","source":"SA WG2","contact":"Hong Cheng","contact-id":25668,"tdoctype":"LS out","for":"Approval","abstract":"SA WG2 would like to ask RAN WG3, CT WG3 and CT WG4 to update the stage 3 specifications to support a maximum allowed MDBV value of 2000 kbytes for signalled 5QI characteristics.","secretary_remarks":"Revision of S2-1910261. Agreed in parallel session This was Block approved","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12380,"status":"approved","reservation_date":"2019-10-19 05:43:21","uploaded":"2019-10-19 07:48:14","revisionof":"S2-1910261","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_Ph1"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-1908691","lsto":"RAN WG3, CT WG4, CT WG3","Cc":"RAN WG1, RAN WG2, SA WG1","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910663.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910727","title":"Remove incorrect reasoning of default MDBV value setting","source":"Qualcomm Incorporated,","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Rephrase NOTE 3 Remove NOTE 3 from delay critical GBR 5QIs and place it somewhere which makes it relevant to PDB as a whole","secretary_remarks":"Revision of S2-1910662. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-1910800.","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12420,"status":"revised","reservation_date":"2019-10-19 05:43:48","uploaded":"2019-10-19 07:48:17","revisionof":"S2-1910662","revisedto":"S2-1910800","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1860.0,"crrevision":3.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910727.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1910800","title":"Remove incorrect reasoning of default MDBV value setting","source":"Qualcomm Incorporated","contact":"Hong Cheng","contact-id":25668,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Rephrase NOTE 3 Remove NOTE 3 from delay critical GBR 5QIs and place it somewhere which makes it relevant to PDB as a whole","secretary_remarks":"e-mail revision 1 of.S2-1910727. This CR was agreed","agenda_item_sort_order":17,"ainumber":"6.5","ainame":"QoS concept and functionality","tdoc_agenda_sort_order":12430,"status":"agreed","reservation_date":"2019-10-28 11:11:27","uploaded":"2019-10-28 15:13:49","revisionof":"S2-1910727","revisedto":"","release":"Rel-16","crspec":"23.501","crspecversion":"16.2.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":1860.0,"crrevision":4.0,"crcategory":"F","tsg_crp":"SP-191074","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_135_Split\/Docs\/S2-1910800.zip","group":"S2","meeting":"S2-135","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]