[{"name":"SP-231417","title":"New SID: Study on AI and ML management phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of the study on AI\/ML management phase 2 include: WT-1. Continue the study on AI\/ML emulation, AI\/ML inference coordination and ML knowledge transfer that are leftover from Rel-18. WT-2. Study the management aspects (LCM CM and PM) of AI\/ML functionalities defined by other 3GPP WGs, including WT-2.1. AI\/ML model transfer in 5GS (SA WG1, Rel-18 WID 920037 and Rel-19 WID 1000030), WT-2.2. 5GS support for AI\/ML-based services (SA WG2, Rel-18 WID 980019 and the potential Rel-19 enhancements) WT-2.3. Support for AI\/ML services at application enablement layer (SA WG6, Rel-18 WID 970036), WT-2.4. AI\/ML for Air interface (RAN WG1, Rel-18 SID 940084 and the potential Rel-19 WID). WT-3. Study the management aspects (LCM CM and PM) of AI\/ML functionalities defined by SA WG5 WG, including WT-3.1. MDA (Management Data Analytics) phase 3 (SA WG5) WT-4. Study the AI\/ML management and operation capabilities to support different types of AI\/ML technologies as needed to support the AI\/ML in 5GS, such as Federated Learning, Reinforcement Learning, Online and Offline training, Distributed Learning, and Generative AI. WT-5. Study the sustainability aspect of AI\/ML, including WT-5.1 Evaluation of energy consumption\/efficiency impacts associated with AI\/ML solutions for all operational phases (training, emulation, deployment, inference). WT-6. Further study the trustworthiness aspects related to the AI\/ML functionalities in 5GS, including WT-6.1 Concept of trustworthiness for AI\/ML in the context of OAM, WT-6.2 Data (e.g., measurements, events) to support calculation of trustworthiness indicators.","secretary_remarks":"Revised to SP-231722.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11080,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231722","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231417.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231418","title":"New SID: Study on intent driven management services for mobile networks phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study item is to study the following areas for enhancing the intent driven management services of 5G network: WT-1 Continuation of Rel-18 intent driven management service topics enhancement: WT-1.1 Intent driven management for user experience assurance WT-1.2 Enablers for Intent Fulfilment, including Intent-driven Closed Loop control, Intent-driven SON orchestration and Intent-driven for MDA. WT-2 New scenarios for intent driven management for mobile network, including but not limited to: WT-2.1 Intent driven management for Uncrewed Aerial Vehicle (UAV)). WT-2.2 Intent driven management for 5G radio network traffic assurance. WT-3 New requirements for additional intent driven management functionalities. WT-3.1 Intent negotiation functionalities, including WT-3.1.1 Management capability to enable MnS producer to ask the MnS consumer to decide which out of many possible outcomes is preferred from the MnS consumer s perspective. WT-3.1.2 Management capability to enable MnS consumer to verify or check the feasibility if proposed intent expectation is possible for an MnS producer. WT-3.1.3 Management capability to enable MnS consumer to explore the best value that can be achieved from an specific intent expectation or target. WT-3.2 Intent handling state management, the management system (including MnS consumer and MnS producer) needs to know the state of an intent instance to pursue the intent lifecycle management WT-3.3 Implicit intent report subscription, the intent report subscription action is triggered by intent creation request automatically. This functionality is to support MnS consumer who expresses the intent can obtain the fulfilment report by default. WT-4 Study how Intent Utility Function can be used to allow Intent driven MnS consumer to improve priority handling by assigning relative preferences to Expectations. Study whether utility may impact existing use cases. WT-5 Intent driven approach for network slicing delivering and assurance. Note: WT-6 depends on the outcome of TR 28.836 (FS_ NETSLICE_IDMS) WT-6 Investigate the scenario and possibility to further use natural language to express the intent.","secretary_remarks":"Revised to SP-231737.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11410,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231737","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231418.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231419","title":"New SID: Study on Closed Control loop management","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of the study includes studying the requirements and potential solutions for the following functionalities: WT-1: Dynamic CCL creation: The CCL for communication service assurance (including network slice and network slice subnet) can be created by the management system implicitly based on some network events including but not limited to performance degradation, threshold crossing, slice Intent creation. WT-2: Multi-vendor CCL management: The CCL for communication service assurance can be disintegrated into multiple parts each coming from different vendor implying the standardized interaction between them. It is to be studied whether there would be any advantages and\/or constraints for the use of multi-vendor CCL. This may also include determining which SA WG5 defined management services can support individual steps of a CCL. WT-3: Conflict Detection and Resolution: CCL related conflicts (including Initiation Conflict and Execution Conflicts) should be identified, mitigated or solved. WT-4: CCL scope: The Rel-16 COSLA and Rel-17 eCOSLA defined the CCL only used for communication service assurance scenarios (including network slice and network slice subnet). It is to be studied if the CCL scope can be extended to cover other scenarios including but not limited to RAN UE throughput optimization, fault management, network coverage optimization. WT-5: Management Coordination: Study the relation between closed loops and other management features (e.g. SON functions, MDA, Intent) with the objective to harmonize, as appropriate. WT-6: Monitoring: Study the advanced monitoring functionalities that provide real-time insights into the performance and outcomes of CCLs. WT-7: Other Enhancements: Study other probable measures (e.g CCL feedback, historical learning) to enhance the capabilities of a CCL for better and efficient operations. The study will be done considering the work done with ETSI ZSM, as appropriate.","secretary_remarks":"Revised to SP-231735.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11370,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231735","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231419.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231420","title":"New SID: Study on cloud aspects of management and orchestration","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: To study the cloud aspects of management and orchestration, including WT-1: Study the use cases which utilize the new VNF generic OAM functions (specified in ETSI) and their potential impacts on the 3GPP management system, i.e., the requirements to support such use cases and the potential solutions. WT-2: Study the use cases that utilize the newly developed industry solutions for management of cloud native network functions which leverage industry standards not limited to NFV MANO; study the potential impact of supporting such use cases on the 3GPP management system, i.e., the potential requirements and solutions. Note: WT-2 includes studying the terminology to determine the appropriate term and definition for cloud native network functions for use in the 3GPP management system. WT-3: Study the use cases, potential requirements and possible solutions for 3GPP management system to support different cloud deployment scenarios, such as public-cloud, private-cloud, hybrid-cloud and multi-cloud deployment scenarios.","secretary_remarks":"Revised to SP-231730.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11260,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231730","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231420.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231421","title":"New SID: Study on SBMA enhancement phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: Potential objectives include: WT-1 Further elaboration on usage guidance of model driven service based management services. Study how to enhance the SBMA definitions in TS 28.533 to clarify the model driven approach. WT-2 Study restructuring TSs, including WT-2.1 Study restructuring the PM TSs, TS 32.401 and TS 28.550, as it is difficult to make good implementations due to that information is needed from many different TSs. WT-2.2 Study restructuring the CM TSs, TS 28.622, as it is difficult to make good implementations due to that information is needed from many different TSs WT-3 Study aspects of alarm and notification including WT-3.1 Study whether a new 3GPP alarm type in Alarm definition if needed. WT-3.2 Study how to enhance reliability of notification transfer and how to document notification definitions. WT-4 Study how to advertise the management capabilities supported by a MnS Producer. WT-5 Study if and how to name a MnS supporting a specific set of capabilities. WT-6 Study how to configure a MnF with the MnS producers to be consumed. WT-7 Study where generic mechanisms (e.g. for data node selection or triggering action) can be applied to SA WG5 defined functions. WT-8 Study how to clarify the usage of MnsAgent. WT-9 Study the introduction of common data type definitions. WT-10 Study operations aspects including WT-10.1 Study how to use OpenAPI when the interface needs to support many, a priori unknown resource schemas e.g. North Bound Interface of a management system. WT-10.2 Study how to allow operations which might take longer than http timeout with progress information. WT-10.3 Study needs for transactional behavior. Client should be able to request atomic behavior of operations fully succeed or not at all.","secretary_remarks":"Revised to SP-231725.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11150,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231725","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231421.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231422","title":"New SID: Study on data management, regarding subscriptions and reporting","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: To study: WT-1 Study how the load on the NFs and\/or 3GPP mgmt. system can be decreased by extracting some of the required functionality to be deployed outside the NFs implementing management capabilities defined in SA WG5. WT-2 Study how to solve to get unique job identifiers for performance measurement, Trace\/MDT and QoE subscriptions\/requests within a PLMN from different consumers. Propose potential requirements, use cases and solutions for this issue.","secretary_remarks":"Revised to SP-231732.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11310,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231732","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231422.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231423","title":"New SID: Study on Management Aspects of NTN Phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: This study item is to investigate the following aspects of the satellite access by taking into account the relevant works in RAN WG2, RAN WG3 and SA WG2, including: WT-1: Management capabilities to support new network architecture or functions for satellite regenerative payloads, considering different types of satellite constellations (both GSO and NGSO). WT-2: Management requirement, usecase and solution to support Store and Forward (S&F) satellite operation and UE-Satellite-UE communication. WT-3: Requirements and potential solutions to support end to end management (including RAN domain and CN domain) in NTN scenarios, such as coordinate with non-3GPP part (e.g. Satellite Control System, Transport System) to provide the NTN specific requirements. WT-4: Management enhancement for NTN-TN and NTN-NTN mobility coordination and better service continuity. NOTE: This study depends on the progress in RAN WGs and SA WG2 WG and may require cooperation with them.","secretary_remarks":"Revised to SP-231733.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11330,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231733","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231423.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231424","title":"New SID: Study on Management of IAB Nodes","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of this study include the following: WT-1 Identify the use cases and scenarios in which how IAB node connects to OAM system. WT-2 Investigate the potential enhancement to Plug and Connect NE to OAM system. WT-3 Identify the potential requirements and solutions to support the continuity of OAM connectivity during IAB node mobility and MBSR roaming over PLMNs. WT-4 Investigate the potential impact to CM, PM, and FM, and identify the potential requirements and solutions to support IAB FCAP management.","secretary_remarks":"Revised to SP-231729.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11240,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231729","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231424.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231425","title":"New SID: Study on Management of Network Sharing Phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: WT-1 Trace job and collection requirements for POPs.","secretary_remarks":"Revised to SP-231731.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11290,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231731","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231425.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231426","title":"New SID: Study on Enablers for Security Monitoring","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: This study item aims at investigating the mechanisms to enhance the collection and aggregation of data required for continuous security monitoring like security alarms from various network entities(possibly radio and core NFs, MnFs, UEs). The entities sending such relevant security data to the management systems will be considered but not limited to in this study include radio network functions and entities, core network functions, network management systems. This study considers 5G system architecture including and up to the features defined in Rel-18. Accordingly, this study aims at identifying the standardization enhancements required for: WT-1 - collection, management and corelation of security alarms, Specific scope is WT-1.1 Filtering of security alarms WT-1.2 Alarm reporting WT-1.3 Retention policies of security alarms The above data could be possibly collected from radio and core NFs, MnFs and UEs.","secretary_remarks":"Revised to SP-231736.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11390,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231736","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231426.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231427","title":"New SID: Study on management aspects of RedCap feature","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: WT-1 Study potential requirements related to management of RedCap based features in RAN network WT-1.1 Enhancement on management of RedCap related initial BWP; WT-1.2 Enhancement on management of eDRX for RedCap; WT-1.3 Potential management enhancements related to other WGs; WT- 2 Study new performance measurements and new key performance indicators to evaluated performance of RedCap WT-2.1 Investigate the metrics for resource load of RedCap network; WT-2.2 Investigate new measurements or KPIs for Inactive UEs; WT- 3 Study the estimation method for RedCap energy consumption of network and the energy efficiency of RedCap. WT- 4 Study what information about RedCap can be exposed between CSP and CSC, according to different RedCap use cases and different deployment scenarios.","secretary_remarks":"Revised to SP-231734.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11350,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231734","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231427.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231428","title":"New SID: Study on Management aspect of Network Digital Twin","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study will focus on the following aspects: WT-1 Investigate and define the terms related to Digital Twin (e.g. NDT) in the 3GPP management system. WT-2 Study scenarios and requirements for the use of NDT, e.g., for verification of the network operations. Scenarios may include RAN optimization and service assurance. WT-3 Collaboration\/alignment for NDT management with other SDOs, especially ETSI ZSM.","secretary_remarks":"Revised to SP-231727.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11190,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231727","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231428.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231429","title":"New SID: Study on Management Data Analytics (MDA) Phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of the study on Management Data Analytics (MDA), Phase 3 is to investigate and discuss use cases along with the corresponding potential requirements and solutions for the following topics: WT-1 Energy efficiency analytics, Note: The work on this aspect will be in collaboration with SA WG5 5GEE work on any new enabling data requirements e.g., new relevant performance measurements and\/or new KPIs will be developed under the scope of 5GEE work. WT-2 End-to-End performance analytics including Edge computing domain, WT-3 Data correlation analytics including, but not limited to supporting and facilitating e.g., ML model training operational tasks, WT-4 ATSSS performance analytics, WT-5 Non-3GPP access performance analytics, WT-6 UE throughput analytics, WT-7 Fault management related analytics and alarm prediction, WT-8 Software Upgrade Validation: Using MDAS predictions to validate the software upgrade for a future point of time, Note: Relation with CICD needs to be studied, as appropriate.","secretary_remarks":"Revised to SP-231726.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11170,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231726","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231429.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231430","title":"New SID: Study on Enhancement of Management Aspects related to NWDAF Phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: While keeping aligning with the study of Management of AI\/ML in SA WG5, it is proposed to study the followings items to enhance the management of NWDAF in SA WG5: WT-1 Investigate the potential CM enhancements for NWDAF to support the new features introduced in Rel-18, including accuracy checking capability, Analytics Exposure in Roaming Case and Federated Learning. WT-2 Study how to evaluate the efficiency of the network data collection of NWDAF, data volume related to the data related services provided by NWDAF and the existed measurement about the number of NWDAF services invoked.","secretary_remarks":"Revised to SP-231724.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11130,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231724","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231430.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231431","title":"New SID: Study on energy efficiency and energy saving aspects of 5G networks and services","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of this study include: WT-1: Left-over SA WG5 topics from Rel-18 WT-1.1 Study new or enhanced Energy Consumption (EC) and Energy Efficiency (EE) KPIs and measurements, e.g. for new types of network slices, RAN sharing, etc. WT-1.2 Consideration of containerized VNFs, study enhancements to virtualized NF EC KPIs, including containerized VNF\/VNFCs, and possible impacts to metrics collected from NFV MANO so as to be able to estimate their energy consumption based on e.g. their virtual CPU usage, virtual memory usage, etc. WT-1.3 Study new use cases, requirements and solutions for energy efficiency and energy saving, applying to NG-RAN and\/or 5GC and\/or network slicing, (including but not limited to intent based, analytics based and AI\/ML assisted energy saving) WT-1.4 Study deployment scenarios involving multiple actors, e.g. in case of passive RAN sharing, active RAN sharing, MNO VNFs hosted on private cloud or public cloud, etc. WT-2: New Rel-19 topics from other SA WGs WT-2.1 Consideration of energy consumption measurement\/estimation at various granularities WT-2.2 Study whether and how mapping measured or estimated energy consumption measurements on to carbon emissions is possible. Study the estimation of carbon emissions efficiency and how to achieve carbon emissions saving in the 5G system. Additionally, whether and how renewable energy consumption information can be obtained will be studied WT-2.3 Study the support of different energy states of network elements and network functions. SA WG5 may have to provide OAM support NOTE: the exact scope of WoP#2 may have to be adjusted depending on ongoing Rel-19 SA WG1 work item (EnergyServ) and SA WG2 study item (FS_CNEES) outcomes. WT-3: OAM support to new Rel-19 RAN energy saving features WT-3.1 Study OAM support for requirements of RAN WGs related work as suitable and whether new performance measurements and\/or new KPIs and\/or new configuration parameters are needed to support energy saving features specified by RAN TSG\/WGs NOTE: whether new performance measurements and\/or KPIs and\/or configuration parameters will be needed is unknown yet, since RAN TSG has not yet approved any Rel-19 SI or WI related to energy efficiency or energy saving. WT-4: Coordination with other SDOs \/ fora to build comprehensive and consistent solutions for EE WT-4.1 Continue the existing collaboration with ETSI TC EE 02 on a unified architecture for the control and monitoring of PEE (Power, Energy, Environmental) parameters of ICT equipment in RAN sites WT-4.2 Potentially start collaborating with ETSI EE EEPS \/ ITU-T SG5 on multi-dimensional network energy efficiency metrics (including e.g. QoE, coverage, etc.) WT-4.3 Continue considering recommendations from NGMN GFN project WT-4.4 Continue exchanging information with ITU-T study groups on our respective outcomes WT-4.5 Potential collaboration with other SDOs, fora, etc. WT-5: Other WT-5.1 Continue maintaining SA WG5 comprehensive view of 3GPP work on energy efficiency and energy saving started in Rel-18 WT-5.2 This study on EE aspects of 5G networks and services may also have to monitor other study and\/or work items in SA WG5 or in other WGs where some EE aspects are addressed, and propose harmonized solutions to them if deemed relevant. Potential collaboration will be needed with the following groups: SA WG1, SA WG2, RAN WGs, NGMN GFN, ETSI EE 02, ETSI EE EEPS, ITU-T SG5, SG11, SG13, ETSI NFV, ETSI GS OEU.","secretary_remarks":"Revised to SP-231723.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11110,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231723","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231431.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231433","title":"New SID: Study on Enhanced OAM for management exposure to external consumers","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study will be: WT-1 Exposure of management services to external consumers WT-1.1 Identify generic requirements for exposure of SA WG5 management services to external consumers, irrespective of the vertical industry. WT-1.2 Identify 1) potential mechanisms to discover management service producers and their respective capabilities while leveraging as much as possible the existing solutions and extending where necessary. Compare existing solutions (e.g., CAPIF, EGMF, MnS Registry and\/or MSAC) that could be leveraged. 2) procedures for exposure of management services based on CAPIF, EGMF, MnS Registry, MSAC or a combination thereof, as listed in S5-236381. WT-1.3 Identify potential requirements that would be provided to the access control (MSAC) work item. WT-1.4 Study whether and how SA WG5 defined exposure mechanisms fit within the GSMA Open Gateway framework. This framework includes OPG, CAMARA and TM Forum, as declared at https:\/\/www.gsma.com\/futurenetworks\/wp-content\/uploads\/2023\/05\/The-Ecosystem-for-Open-Gateway-NaaS-API-development.pdf . WT-2 management exposure WT-2.1 Study whether and how the requirements of communication services can be captured with <> (datatype) WT-2.2 Study the definition of a new service management information model (focused on service requirements, and in scope of CSP), separated from the NRM fragment (focused on network constructions, and in scope of NOP). This new model would give the NOP the flexibility to decide which solution (e.g., with either network slicing, or DNN provisioning, or SNPN, ) is most appropriate to fulfil the requirements of a given communication service. WT-2.3 Study modelling solutions that provide alternative means to fulfil ServiceProfile other than via network slicing. Examples of these means include DNN provisioning and SNPN provisioning. WT-2.4 clarify the role of communication service (TS 28.530) in 3GPP management system, and the relationship with PDU session definition in 3GPP 5G system architecture (23.501) WT-3 Exposing network slice management capabilities in network sharing scenarios: WT-3.1 identify network slicing management aspects in network sharing scenarios beyond RAN sharing, e.g. backhaul sharing. These scenarios are motivated with the increasing tendency of telco operators to offload the ownership and management of access infrastructures on 3rd parties. WT-3.2 study the impact of these aspects in the provisioning (28.531) and the models (Slice NRM fragment and the information elements of a potential new management information model). For this work, NSaaS and NSSaaS description reported 28.811 will be considered into account.","secretary_remarks":"Revised, merging SP-231641, to SP-231728.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11210,"status":"revised","reservation_date":"2023-11-30 10:18:18","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231728","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231433.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231528","title":"New SID: Study on Plan management","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective is to study WT-1 methods for creating planned configurations. WT-2 methods for updating planned configurations. WT-3 methods for validating the planned configurations. WT-4 methods for activating the planned configurations.","secretary_remarks":"Revised to SP-231721.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11060,"status":"revised","reservation_date":"2023-12-01 14:52:59","uploaded":"2023-12-04 15:35:23","revisionof":"","revisedto":"SP-231721","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231528.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231641","title":"New SID: Study on Enhanced OAM for management exposure to external consumers","source":"Samsung","contact":"Suresh Chitturi","contact-id":61003,"tdoctype":"SID new","for":"Approval","abstract":"Revision of SP-231433 (SA WG5 agreed SID) to remove a reference in the WT-1.2 objective.","secretary_remarks":"Revision of SP-231433 (SA WG5 agreed SID). Merged into SP-231728.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11230,"status":"merged","reservation_date":"2023-12-06 16:28:11","uploaded":"2023-12-06 16:31:48","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231641.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231721","title":"New SID: Study on Management of planned configurations","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective is to study WT-1 methods for creating planned configurations. WT-2 methods for updating planned configurations. WT-3 methods for validating the planned configurations. WT-4 methods for activating the planned configurations.","secretary_remarks":"Revision of SP-231528. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11070,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231528","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231721.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231722","title":"New SID: Study on AI and ML management phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of the study on AI\/ML management phase 2 include: WT-1. Continue the study on AI\/ML emulation, AI\/ML inference coordination and ML knowledge transfer that are leftover from Rel-18. WT-2. Study the management aspects (LCM CM and PM) of AI\/ML functionalities defined by other 3GPP WGs, including WT-2.1. AI\/ML model transfer in 5GS (SA WG1, Rel-18 WID 920037 and Rel-19 WID 1000030), WT-2.2. 5GS support for AI\/ML-based services (SA WG2, Rel-18 WID 980019 and the potential Rel-19 enhancements) WT-2.3. Support for AI\/ML services at application enablement layer (SA WG6, Rel-18 WID 970036), WT-2.4. AI\/ML for Air interface (RAN WG1, Rel-18 SID 940084 and the potential Rel-19 WID). WT-3. Study the management aspects (LCM CM and PM) of AI\/ML functionalities defined by SA WG5 WG, including WT-3.1. MDA (Management Data Analytics) phase 3 (SA WG5) WT-4. Study the AI\/ML management and operation capabilities to support different types of AI\/ML technologies as needed to support the AI\/ML in 5GS, such as Federated Learning, Reinforcement Learning, Online and Offline training, Distributed Learning, and Generative AI. WT-5. Study the sustainability aspect of AI\/ML, including WT-5.1 Evaluation of energy consumption\/efficiency impacts associated with AI\/ML solutions for all operational phases (training, emulation, deployment, inference). WT-6. Further study the trustworthiness aspects related to the AI\/ML functionalities in 5GS, including WT-6.1 Concept of trustworthiness for AI\/ML in the context of OAM, WT-6.2 Data (e.g., measurements, events) to support calculation of trustworthiness indicators.","secretary_remarks":"Revision of SP-231417. Revised to SP-231780.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11090,"status":"revised","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:10","revisionof":"SP-231417","revisedto":"SP-231780","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231722.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231723","title":"New SID: Study on energy efficiency and energy saving aspects of 5G networks and services","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of this study include: WT-1: Left-over SA WG5 topics from Rel-18 WT-1.1 Study new or enhanced Energy Consumption (EC) and Energy Efficiency (EE) KPIs and measurements, e.g. for new types of network slices, RAN sharing, etc. WT-1.2 Consideration of containerized VNFs, study enhancements to virtualized NF EC KPIs, including containerized VNF\/VNFCs, and possible impacts to metrics collected from NFV MANO so as to be able to estimate their energy consumption based on e.g. their virtual CPU usage, virtual memory usage, etc. WT-1.3 Study new use cases, requirements and solutions for energy efficiency and energy saving, applying to NG-RAN and\/or 5GC and\/or network slicing, (including but not limited to intent based, analytics based and AI\/ML assisted energy saving) WT-1.4 Study deployment scenarios involving multiple actors, e.g. in case of passive RAN sharing, active RAN sharing, MNO VNFs hosted on private cloud or public cloud, etc. WT-2: New Rel-19 topics from other SA WGs WT-2.1 Consideration of energy consumption measurement\/estimation at various granularities WT-2.2 Study whether and how mapping measured or estimated energy consumption measurements on to carbon emissions is possible. Study the estimation of carbon emissions efficiency and how to achieve carbon emissions saving in the 5G system. Additionally, whether and how renewable energy consumption information can be obtained will be studied WT-2.3 Study the support of different energy states of network elements and network functions. SA WG5 may have to provide OAM support NOTE: the exact scope of WoP#2 may have to be adjusted depending on ongoing Rel-19 SA WG1 work item (EnergyServ) and SA WG2 study item (FS_CNEES) outcomes. WT-3: OAM support to new Rel-19 RAN energy saving features WT-3.1 Study OAM support for requirements of RAN WGs related work as suitable and whether new performance measurements and\/or new KPIs and\/or new configuration parameters are needed to support energy saving features specified by RAN TSG\/WGs NOTE: whether new performance measurements and\/or KPIs and\/or configuration parameters will be needed is unknown yet, since RAN TSG has not yet approved any Rel-19 SI or WI related to energy efficiency or energy saving. WT-4: Coordination with other SDOs \/ fora to build comprehensive and consistent solutions for EE WT-4.1 Continue the existing collaboration with ETSI TC EE 02 on a unified architecture for the control and monitoring of PEE (Power, Energy, Environmental) parameters of ICT equipment in RAN sites WT-4.2 Potentially start collaborating with ETSI EE EEPS \/ ITU-T SG5 on multi-dimensional network energy efficiency metrics (including e.g. QoE, coverage, etc.) WT-4.3 Continue considering recommendations from NGMN GFN project WT-4.4 Continue exchanging information with ITU-T study groups on our respective outcomes WT-4.5 Potential collaboration with other SDOs, fora, etc. WT-5: Other WT-5.1 Continue maintaining SA WG5 comprehensive view of 3GPP work on energy efficiency and energy saving started in Rel-18 WT-5.2 This study on EE aspects of 5G networks and services may also have to monitor other study and\/or work items in SA WG5 or in other WGs where some EE aspects are addressed, and propose harmonized solutions to them if deemed relevant. Potential collaboration will be needed with the following groups: SA WG1, SA WG2, RAN WGs, NGMN GFN, ETSI EE 02, ETSI EE EEPS, ITU-T SG5, SG11, SG13, ETSI NFV, ETSI GS OEU.","secretary_remarks":"Revision of SP-231431. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11120,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231431","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231723.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231724","title":"New SID: Study on Enhancement of Management Aspects related to NWDAF Phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: While keeping aligning with the study of Management of AI\/ML in SA WG5, it is proposed to study the followings items to enhance the management of NWDAF in SA WG5: WT-1 Investigate the potential CM enhancements for NWDAF to support the new features introduced in Rel-18, including accuracy checking capability, Analytics Exposure in Roaming Case and Federated Learning. WT-2 Study how to evaluate the efficiency of the network data collection of NWDAF, data volume related to the data related services provided by NWDAF and the existed measurement about the number of NWDAF services invoked.","secretary_remarks":"Revision of SP-231430. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11140,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231430","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231724.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231725","title":"New SID: Study on Service Based Management Architecture enhancement phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: Potential objectives include: WT-1 Further elaboration on usage guidance of model driven service based management services. Study how to enhance the SBMA definitions in TS 28.533 to clarify the model driven approach. WT-2 Study restructuring TSs, including WT-2.1 Study restructuring the PM TSs, TS 32.401 and TS 28.550, as it is difficult to make good implementations due to that information is needed from many different TSs. WT-2.2 Study restructuring the CM TSs, TS 28.622, as it is difficult to make good implementations due to that information is needed from many different TSs WT-3 Study aspects of alarm and notification including WT-3.1 Study whether a new 3GPP alarm type in Alarm definition if needed. WT-3.2 Study how to enhance reliability of notification transfer and how to document notification definitions. WT-4 Study how to advertise the management capabilities supported by a MnS Producer. WT-5 Study if and how to name a MnS supporting a specific set of capabilities. WT-6 Study how to configure a MnF with the MnS producers to be consumed. WT-7 Study where generic mechanisms (e.g. for data node selection or triggering action) can be applied to SA WG5 defined functions. WT-8 Study how to clarify the usage of MnsAgent. WT-9 Study the introduction of common data type definitions. WT-10 Study operations aspects including WT-10.1 Study how to use OpenAPI when the interface needs to support many, a priori unknown resource schemas e.g. North Bound Interface of a management system. WT-10.2 Study how to allow operations which might take longer than http timeout with progress information. WT-10.3 Study needs for transactional behavior. Client should be able to request atomic behavior of operations fully succeed or not at all.","secretary_remarks":"Revision of SP-231421. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11160,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231421","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231725.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231726","title":"New SID: Study on Management Data Analytics (MDA) Phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of the study on Management Data Analytics (MDA), Phase 3 is to investigate and discuss use cases along with the corresponding potential requirements and solutions for the following topics: WT-1 Energy efficiency analytics, Note: The work on this aspect will be in collaboration with SA WG5 5GEE work on any new enabling data requirements e.g., new relevant performance measurements and\/or new KPIs will be developed under the scope of 5GEE work. WT-2 End-to-End performance analytics including Edge computing domain, WT-3 Data correlation analytics including, but not limited to supporting and facilitating e.g., ML model training operational tasks, WT-4 ATSSS performance analytics, WT-5 Non-3GPP access performance analytics, WT-6 UE throughput analytics, WT-7 Fault management related analytics and alarm prediction, WT-8 Software Upgrade Validation: Using MDAS predictions to validate the software upgrade for a future point of time, Note: Relation with CICD needs to be studied, as appropriate.","secretary_remarks":"Revision of SP-231429. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11180,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231429","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231726.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231727","title":"New SID: Study on management aspects of Network Digital Twin","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study will focus on the following aspects: WT-1 Investigate and define the terms related to Digital Twin (e.g. NDT) in the 3GPP management system. WT-2 Study scenarios and requirements for the use of NDT, e.g., for verification of the network operations. Scenarios may include RAN optimization and service assurance. WT-3 Collaboration\/alignment for NDT management with other SDOs, especially ETSI ZSM.","secretary_remarks":"Revision of SP-231428. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11200,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231428","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231727.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231728","title":"New SID: Study on Enhanced OAM for management exposure to external consumers","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study will be: WT-1 Exposure of management services to external consumers WT-1.1 Identify generic requirements for exposure of SA WG5 management services to external consumers, irrespective of the vertical industry. WT-1.2 Identify 1) potential mechanisms to discover management service producers and their respective capabilities while leveraging as much as possible the existing solutions and extending where necessary. Compare existing solutions (e.g., CAPIF, EGMF, MnS Registry and\/or MSAC) that could be leveraged. 2) procedures for exposure of management services based on CAPIF, EGMF, MnS Registry, MSAC or a combination thereof, as listed in S5-236381. WT-1.3 Identify potential requirements that would be provided to the access control (MSAC) work item. WT-1.4 Study whether and how SA WG5 defined exposure mechanisms fit within the GSMA Open Gateway framework. This framework includes OPG, CAMARA and TM Forum, as declared at https:\/\/www.gsma.com\/futurenetworks\/wp-content\/uploads\/2023\/05\/The-Ecosystem-for-Open-Gateway-NaaS-API-development.pdf . WT-2 management exposure WT-2.1 Study whether and how the requirements of communication services can be captured with <> (datatype) WT-2.2 Study the definition of a new service management information model (focused on service requirements, and in scope of CSP), separated from the NRM fragment (focused on network constructions, and in scope of NOP). This new model would give the NOP the flexibility to decide which solution (e.g., with either network slicing, or DNN provisioning, or SNPN, ) is most appropriate to fulfil the requirements of a given communication service. WT-2.3 Study modelling solutions that provide alternative means to fulfil ServiceProfile other than via network slicing. Examples of these means include DNN provisioning and SNPN provisioning. WT-2.4 clarify the role of communication service (TS 28.530) in 3GPP management system, and the relationship with PDU session definition in 3GPP 5G system architecture (23.501) WT-3 Exposing network slice management capabilities in network sharing scenarios: WT-3.1 identify network slicing management aspects in network sharing scenarios beyond RAN sharing, e.g. backhaul sharing. These scenarios are motivated with the increasing tendency of telco operators to offload the ownership and management of access infrastructures on 3rd parties. WT-3.2 study the impact of these aspects in the provisioning (28.531) and the models (Slice NRM fragment and the information elements of a potential new management information model). For this work, NSaaS and NSSaaS description reported 28.811 will be considered into account.","secretary_remarks":"Revision of SP-231433, merging SP-231641. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11220,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231433","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231728.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231729","title":"New SID: Study on Management of IAB Nodes","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of this study include the following: WT-1 Identify the use cases and scenarios in which how IAB node connects to OAM system. WT-2 Investigate the potential enhancement to Plug and Connect NE to OAM system. WT-3 Identify the potential requirements and solutions to support the continuity of OAM connectivity during IAB node mobility and MBSR roaming over PLMNs. WT-4 Investigate the potential impact to CM, PM, and FM, and identify the potential requirements and solutions to support IAB FCAP management.","secretary_remarks":"Revision of SP-231424. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11250,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231424","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231729.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231730","title":"New SID: Study on cloud aspects of management and orchestration","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: To study the cloud aspects of management and orchestration, including WT-1: Study the use cases which utilize the new VNF generic OAM functions (specified in ETSI) and their potential impacts on the 3GPP management system, i.e., the requirements to support such use cases and the potential solutions. WT-2: Study the use cases that utilize the newly developed industry solutions for management of cloud native network functions which leverage industry standards not limited to NFV MANO; study the potential impact of supporting such use cases on the 3GPP management system, i.e., the potential requirements and solutions. Note: WT-2 includes studying the terminology to determine the appropriate term and definition for cloud native network functions for use in the 3GPP management system. WT-3: Study the use cases, potential requirements and possible solutions for 3GPP management system to support different cloud deployment scenarios, such as public-cloud, private-cloud, hybrid-cloud and multi-cloud deployment scenarios.","secretary_remarks":"Revision of SP-231420. Revised to SP-231781.","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11270,"status":"revised","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:10","revisionof":"SP-231420","revisedto":"SP-231781","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231730.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231731","title":"New SID: Study on Management of Network Sharing Phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: WT-1 Trace job and collection requirements for POPs.","secretary_remarks":"Revision of SP-231425. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11300,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231425","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231731.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231732","title":"New SID: Study on data management regarding subscriptions and reporting","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: To study: WT-1 Study how the load on the NFs and\/or 3GPP mgmt. system can be decreased by extracting some of the required functionality to be deployed outside the NFs implementing management capabilities defined in SA WG5. WT-2 Study how to solve to get unique job identifiers for performance measurement, Trace\/MDT and QoE subscriptions\/requests within a PLMN from different consumers. Propose potential requirements, use cases and solutions for this issue.","secretary_remarks":"Revision of SP-231422. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11320,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231422","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231732.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231733","title":"New SID: Study on Management Aspects of NTN Phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: This study item is to investigate the following aspects of the satellite access by taking into account the relevant works in RAN WG2, RAN WG3 and SA WG2, including: WT-1: Management capabilities to support new network architecture or functions for satellite regenerative payloads, considering different types of satellite constellations (both GSO and NGSO). WT-2: Management requirement, usecase and solution to support Store and Forward (S&F) satellite operation and UE-Satellite-UE communication. WT-3: Requirements and potential solutions to support end to end management (including RAN domain and CN domain) in NTN scenarios, such as coordinate with non-3GPP part (e.g. Satellite Control System, Transport System) to provide the NTN specific requirements. WT-4: Management enhancement for NTN-TN and NTN-NTN mobility coordination and better service continuity. NOTE: This study depends on the progress in RAN WGs and SA WG2 WG and may require cooperation with them.","secretary_remarks":"Revision of SP-231423. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11340,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231423","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231733.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231734","title":"New SID: Study on management aspects of RedCap feature","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: WT-1 Study potential requirements related to management of RedCap based features in RAN network WT-1.1 Enhancement on management of RedCap related initial BWP; WT-1.2 Enhancement on management of eDRX for RedCap; WT-1.3 Potential management enhancements related to other WGs; WT- 2 Study new performance measurements and new key performance indicators to evaluated performance of RedCap WT-2.1 Investigate the metrics for resource load of RedCap network; WT-2.2 Investigate new measurements or KPIs for Inactive UEs; WT- 3 Study the estimation method for RedCap energy consumption of network and the energy efficiency of RedCap. WT- 4 Study what information about RedCap can be exposed between CSP and CSC, according to different RedCap use cases and different deployment scenarios.","secretary_remarks":"Revision of SP-231427. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11360,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231427","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231734.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231735","title":"New SID: Study on Closed Control loop management","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of the study includes studying the requirements and potential solutions for the following functionalities: WT-1: Dynamic CCL creation: The CCL for communication service assurance (including network slice and network slice subnet) can be created by the management system implicitly based on some network events including but not limited to performance degradation, threshold crossing, slice Intent creation. WT-2: Multi-vendor CCL management: The CCL for communication service assurance can be disintegrated into multiple parts each coming from different vendor implying the standardized interaction between them. It is to be studied whether there would be any advantages and\/or constraints for the use of multi-vendor CCL. This may also include determining which SA WG5 defined management services can support individual steps of a CCL. WT-3: Conflict Detection and Resolution: CCL related conflicts (including Initiation Conflict and Execution Conflicts) should be identified, mitigated or solved. WT-4: CCL scope: The Rel-16 COSLA and Rel-17 eCOSLA defined the CCL only used for communication service assurance scenarios (including network slice and network slice subnet). It is to be studied if the CCL scope can be extended to cover other scenarios including but not limited to RAN UE throughput optimization, fault management, network coverage optimization. WT-5: Management Coordination: Study the relation between closed loops and other management features (e.g. SON functions, MDA, Intent) with the objective to harmonize, as appropriate. WT-6: Monitoring: Study the advanced monitoring functionalities that provide real-time insights into the performance and outcomes of CCLs. WT-7: Other Enhancements: Study other probable measures (e.g CCL feedback, historical learning) to enhance the capabilities of a CCL for better and efficient operations. The study will be done considering the work done with ETSI ZSM, as appropriate.","secretary_remarks":"Revision of SP-231419. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11380,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231419","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231735.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231736","title":"New SID: Study on Enablers for Security Monitoring","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: This study item aims at investigating the mechanisms to enhance the collection and aggregation of data required for continuous security monitoring like security alarms from various network entities(possibly radio and core NFs, MnFs, UEs). The entities sending such relevant security data to the management systems will be considered but not limited to in this study include radio network functions and entities, core network functions, network management systems. This study considers 5G system architecture including and up to the features defined in Rel-18. Accordingly, this study aims at identifying the standardization enhancements required for: WT-1 - collection, management and corelation of security alarms, Specific scope is WT-1.1 Filtering of security alarms WT-1.2 Alarm reporting WT-1.3 Retention policies of security alarms The above data could be possibly collected from radio and core NFs, MnFs and UEs.","secretary_remarks":"Revision of SP-231426. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11400,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231426","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231736.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231737","title":"New SID: Study on intent driven management services for mobile network phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study item is to study the following areas for enhancing the intent driven management services of 5G network: WT-1 Continuation of Rel-18 intent driven management service topics enhancement: WT-1.1 Intent driven management for user experience assurance WT-1.2 Enablers for Intent Fulfilment, including Intent-driven Closed Loop control, Intent-driven SON orchestration and Intent-driven for MDA. WT-2 New scenarios for intent driven management for mobile network, including but not limited to: WT-2.1 Intent driven management for Uncrewed Aerial Vehicle (UAV)). WT-2.2 Intent driven management for 5G radio network traffic assurance. WT-3 New requirements for additional intent driven management functionalities. WT-3.1 Intent negotiation functionalities, including WT-3.1.1 Management capability to enable MnS producer to ask the MnS consumer to decide which out of many possible outcomes is preferred from the MnS consumer s perspective. WT-3.1.2 Management capability to enable MnS consumer to verify or check the feasibility if proposed intent expectation is possible for an MnS producer. WT-3.1.3 Management capability to enable MnS consumer to explore the best value that can be achieved from an specific intent expectation or target. WT-3.2 Intent handling state management, the management system (including MnS consumer and MnS producer) needs to know the state of an intent instance to pursue the intent lifecycle management WT-3.3 Implicit intent report subscription, the intent report subscription action is triggered by intent creation request automatically. This functionality is to support MnS consumer who expresses the intent can obtain the fulfilment report by default. WT-4 Study how Intent Utility Function can be used to allow Intent driven MnS consumer to improve priority handling by assigning relative preferences to Expectations. Study whether utility may impact existing use cases. WT-5 Intent driven approach for network slicing delivering and assurance. Note: WT-6 depends on the outcome of TR 28.836 (FS_ NETSLICE_IDMS) WT-6 Investigate the scenario and possibility to further use natural language to express the intent.","secretary_remarks":"Revision of SP-231418. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11420,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231418","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231737.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231780","title":"New SID: Study on AI\/ML management - phase 2","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objectives of the study on AI\/ML management phase 2 include: WT-1. Continue the study on AI\/ML emulation, AI\/ML inference coordination and ML knowledge transfer that are leftover from Rel-18. WT-2. Study the management aspects (LCM CM and PM) of AI\/ML functionalities defined by other 3GPP WGs, including WT-2.1. AI\/ML model transfer in 5GS (SA WG1, Rel-18 WID 920037 and Rel-19 WID 1000030), WT-2.2. 5GS support for AI\/ML-based services (SA WG2, Rel-18 WID 980019 and the potential Rel-19 enhancements) WT-2.3. Support for AI\/ML services at application enablement layer (SA WG6, Rel-18 WID 970036), WT-2.4. AI\/ML for Air interface (RAN WG1, Rel-18 SID 940084 and the potential Rel-19 WID). WT-3. Study the management aspects (LCM CM and PM) of AI\/ML functionalities defined by SA WG5 WG, including WT-3.1. MDA (Management Data Analytics) phase 3 (SA WG5) WT-4. Study the AI\/ML management and operation capabilities to support different types of AI\/ML technologies as needed to support the AI\/ML in 5GS, such as Federated Learning, Reinforcement Learning, Online and Offline training, Distributed Learning, and Generative AI. WT-5. Study the sustainability aspect of AI\/ML, including WT-5.1 Evaluation of energy consumption\/efficiency impacts associated with AI\/ML solutions for all operational phases (training, emulation, deployment, inference). WT-6. Further study the trustworthiness aspects related to the AI\/ML functionalities in 5GS, including WT-6.1 Concept of trustworthiness for AI\/ML in the context of OAM, WT-6.2 Data (e.g., measurements, events) to support calculation of trustworthiness indicators.","secretary_remarks":"Revision of SP-231722. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11100,"status":"approved","reservation_date":"2023-12-15 13:20:10","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231722","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231780.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"SP-231781","title":"New SID: Study on cloud aspects of management and orchestration","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: To study the cloud aspects of management and orchestration, including WT-1: Study the use cases which utilize the new VNF generic OAM functions (specified in ETSI) and their potential impacts on the 3GPP management system, i.e., the requirements to support such use cases and the potential solutions. WT-2: Study the use cases that utilize the newly developed industry solutions for management of cloud native network functions which leverage industry standards not limited to NFV MANO; study the potential impact of supporting such use cases on the 3GPP management system, i.e., the potential requirements and solutions. Note: WT-2 includes studying the terminology to determine the appropriate term and definition for cloud native network functions for use in the 3GPP management system. WT-3: Study the use cases, potential requirements and possible solutions for 3GPP management system to support different cloud deployment scenarios, such as public-cloud, private-cloud, hybrid-cloud and multi-cloud deployment scenarios.","secretary_remarks":"Revision of SP-231730. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11280,"status":"approved","reservation_date":"2023-12-15 13:20:10","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231730","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231781.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]