[{"name":"R5-153285","title":"Update to Loopback data procedure with IMS signalling","source":"Anritsu Ltd., Qualcomm Incorporated","contact":"Ankit Banaudha","contact-id":58157,"tdoctype":"CR","for":"Decision","abstract":"","secretary_remarks":"","agenda_item_sort_order":227,"ainumber":"6.4.2","ainame":"\tRoutine Maintenance for TS 36.509","tdoc_agenda_sort_order":0,"status":"available","reservation_date":"2015-08-12 21:51:43","uploaded":"2015-08-14 23:48:36","revisionof":"","revisedto":"","release":"Rel-12","crspec":"36.509","crspecversion":"12.0.0","workitem":[{"winame":"TEI10_Test"}],"crnumber":144.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG5_Test_ex-T1\/TSGR5_68_Beijing\/Docs\/R5-153285.zip","group":"R5","meeting":"R5-68","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-153970","title":"Update to Loopback data procedure with IMS signalling","source":"Anritsu Ltd., Qualcomm Incorporated, Samsung, MCC TF160","contact":"John M Meredith","contact-id":637,"tdoctype":"CR","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":227,"ainumber":"6.4.2","ainame":"\tRoutine Maintenance for TS 36.509","tdoc_agenda_sort_order":32851,"status":"available","reservation_date":"2015-10-19 13:23:50","uploaded":"2016-10-27 10:29:02","revisionof":"","revisedto":"","release":"Rel-12","crspec":"36.509","crspecversion":"12.1.0","workitem":[{"winame":"TEI12_Test"}],"crnumber":144.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG5_Test_ex-T1\/TSGR5_68_Beijing\/Docs\/R5-153970.zip","group":"R5","meeting":"R5-68","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]