[{"name":"R5-197746","title":"Draft specification V0.1.0 for TS 34.229-5","source":"ROHDE & SCHWARZ","contact":"Hans Rohnert","contact-id":50081,"tdoctype":"draft TS","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":77460,"status":"approved","reservation_date":"2019-10-24 15:17:41","uploaded":"2019-11-08 13:32:24","revisionof":"","revisedto":"","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-197746.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-197871","title":"Addition of NR IMS TC 6.2-423 Interval Too Brief","source":"Huawei,Hisilicon","contact":"Yuchun Wu","contact-id":77331,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":78710,"status":"revised","reservation_date":"2019-10-28 07:15:32","uploaded":"2019-10-30 12:27:19","revisionof":"","revisedto":"R5-198899","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-197871.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-197934","title":"Corrections to IMS test case 6.1 on Initial Registration","source":"ROHDE & SCHWARZ","contact":"Hans Rohnert","contact-id":50081,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":79340,"status":"approved","reservation_date":"2019-10-29 08:58:59","uploaded":"2019-11-08 13:32:24","revisionof":"","revisedto":"","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-197934.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198014","title":"Discussion on interworking test cases definition for 5GS","source":"CATT, TDIA","contact":"Xiaozhong Chen","contact-id":50266,"tdoctype":"discussion","for":"Discussion","abstract":"In 3GPP TR 38.801, several options of 5GS have been defined with different AS\/NAS network structures. Based on the recent feedback from the network operators, Options 2, 3, 4, 5 and 7 are all expected to be commercially deployed before the end of 2020.\n2.\tDiscussion\nBased on the definition of network structures, UE supporting different Options may have duplicated requirements on features level. Therefore, the following assumption should be considered by drafting work plans\nUE supporting Option 4 (NE-DC) should also support Option 2 (NR\/5GC).\nUE supporting Option 7 (NGEN-DC) should also support Option 5 (E-UTRA\/5GC).\nInter-RAT is defined as interworking between MCGs with different access technologies (E-UTRA and NR considered at current stage).\nInter-System is defined as interworking between different type of Core Networks (EPC and 5GC considered at current stage).\n3.\tProposals\nThe following rules are proposed for endorsement to updating test case titles with unified pre-fix in current and future 38.523 specs and work plans for clearly identifing interworking test cases for outside world (operators\/certification orgnizations).\n1.\tAdding\/moving Inter-RAT prefix when testing for AS layer:\n2.\tAdding\/moving Inter-system prefix when testing for NAS layer.\n3.\tAdding\/moving Inter-RAT, Inter-system or Inter-system\/Inter-RAT prefix to multilayer test cases depending on the test purpose.","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":80140,"status":"revised","reservation_date":"2019-10-31 04:49:32","uploaded":"2019-11-08 05:50:44","revisionof":"","revisedto":"R5-198845","release":"Rel-16","crspec":"38.523-1","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198014.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198195","title":"SS-SINR consideration for FR2 Default levels for multi-cell signalling tests in 38.508-1","source":"QUALCOMM Europe Inc. - Spain","contact":"yogesh tugnawat","contact-id":63855,"tdoctype":"discussion","for":"Endorsement","abstract":"Introduction\nDuring RAN5#83, an agreement was made for FR2 default power levels for intra and inter-frequency neighbour cells [1]. As per this agreement, 3 distinct power levels were defined with 9dB differences. However, the proposal [1] did not account for minimum requirements for SS-SINR as per TS 38.133 [3] cl 10.1.13.1 Intra-frequency SINR accuracy requirements for FR2 and 10.1.15.1 Inter-frequency SS-SINR accuracy requirements in FR2. This now creates SINR issue defining suitable power levels of multi NR measurement tests where neighbour is at higher power than serving.\nCurrent signal power levels for serving and suitable neighbour intra-frequency cells as agreed in [1] are as mentioned below [..]\nConclusion and Way Forward\n1.\tWe propose to change the FR2 power levels to \u2018FFS\u2019 for ENDC measurement TCs from TS 38.523-1 [4], 8.2.3.6.1\/a\/b, 8.2.3.7.1\/a\/b and 8.2.3.8.1\/a\/b and similarly also for the respective SA TCs 8.1.3.1.2\/3\/4, 8.1.3.1.5\/6\/7, 8.1.3.1.8\/9\/10. \n2.\tTo reduce impact, for A4 measurement, in TC 8.2.3.7.1\/a\/b from TS 38.523-1 because of the trigger conditions, we propose to change the serving cell power level at in Table 8.2.3.7.1.3.2-1A time instance T1 to -82 dBm\/SCS.\n3.\tRevisit the discussion for OTA signal levels [1] and come up with revised power level which considers the minimum requirement for SS-SINR levels as per TS 38.133 Cl 10.1.13, which can be applied to measurement testcases.","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":81950,"status":"revised","reservation_date":"2019-11-06 01:31:10","uploaded":"2019-11-19 05:07:56","revisionof":"","revisedto":"R5-199018","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198195.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198200","title":"NR-NR DC Addition in RRC WP","source":"QUALCOMM Europe Inc. - Spain","contact":"yogesh tugnawat","contact-id":63855,"tdoctype":"discussion","for":"Endorsement","abstract":"As per agreement in RAN5#84 (R5-196274), NR-DC is to be considerted higher priority task out of remaining Rel-15 5GS work item with target completion of signaling areas by RAN5#86 (Feb-2020). The industry interest focusses on FR1+FR2 NR-DC where FR1 is the MCG and FR2 is the SCG.This discussion paper highlights some general impacts to 5GS WP along with scoping of RRC test cases.","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":82000,"status":"revised","reservation_date":"2019-11-06 01:31:14","uploaded":"2019-11-19 05:07:56","revisionof":"","revisedto":"R5-198846","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198200.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198239","title":"New IMS over 5GS test case 6.4","source":"ROHDE & SCHWARZ","contact":"Hans Rohnert","contact-id":50081,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":82390,"status":"approved","reservation_date":"2019-11-06 12:19:35","uploaded":"2019-11-08 13:32:24","revisionof":"","revisedto":"","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198239.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198240","title":"New IMS over 5GS test case 6.7","source":"ROHDE & SCHWARZ","contact":"Hans Rohnert","contact-id":50081,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":82400,"status":"approved","reservation_date":"2019-11-06 12:22:40","uploaded":"2019-11-08 13:32:24","revisionof":"","revisedto":"","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198240.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198241","title":"New IMS over 5GS test case 6.9","source":"ROHDE & SCHWARZ","contact":"Hans Rohnert","contact-id":50081,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":82410,"status":"approved","reservation_date":"2019-11-06 12:24:46","uploaded":"2019-11-08 13:32:24","revisionof":"","revisedto":"","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198241.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198365","title":"FR1 Signalling Test cases: Maximum power level consideration","source":"ANRITSU LTD","contact":"Narendra Kalahasti","contact-id":59863,"tdoctype":"discussion","for":"Endorsement","abstract":"Introduction\nIn last RAN5 meeting, default signal levels are agreed in R5-194879.\nMaximum FR1 power level defined inTable 6.2.2.1-1, TS 38.508-1, are calculated based on the assumption that power applied for full number of RBs for a Maximum BandWidth( 273 RBs for 100MHz). However, signalling test cases does not require full number of RBs for most number of test cases. If Maximum power level is calculated based on number of RBs required, then, it provide more flexibility to define FR1 power table.\n\nObservation#3 : Maximum number of RBs for most of the signalling test cases would be 24 ( ie Maximum 17 RBs for downlink allocation while 7 RBs for SIB1 or SI)\nProposal: Maximum power level allocation for 24 RBs would be := -53 - 10log10(12*24) = -53 \u2013 24.5 = -77.5 ~ -78","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":83650,"status":"noted","reservation_date":"2019-11-08 01:10:24","uploaded":"2019-11-08 17:38:48","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198365.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198467","title":"On Option 5 and 7 protocol positioning tests","source":"ROHDE & SCHWARZ","contact":"Adrian Cardalda Garcia","contact-id":66591,"tdoctype":"discussion","for":"Endorsement","abstract":"During RAN5 #84, new test configurations were added to the protocol positioning tests in [1]. These test configurations covered the NE-DC, NG-RAN E-UTRA and NGEN-DC deployments.\nDiscussion\nTest Configuration D covers the case where a E-UTRA eNB is connected to the NR core network. Thus, although the LPP protocol remains unchanged, the NAS messages used as LPP transport mechanism are the 5GC NAS messages instead of the EPC NAS messages used for legacy LTE tests. \nObservation 1: Test configuration D relies on 5GC NAS messages.\nThus, the functionality of Test Configuration D cannot be covered completely by the equivalent LTE protocol test. The functionality could be covered by a combination of the LTE test in Chapter  7 and the corresponding 5G test in chapter 9 using Test Configuration B. However, a NG-RAN E-UTRA supporting DUT does not necessarily support NG-RAN NR. Thus, this option would also not ensure all DUTs are properly tested. \nObservation 2: Test configuration D cannot be covered by any other already existing test configuration or a combination of them.\nProposal 1: Test configuration D needs to be tested.\nTest configuration E faces the same issue: the LTE test cannot covered the test functionality, since the 5GC NAS messages would remain untested. \nObservation 3: Test configuration E also relies on 5GC NAS messages.\nHowever, Test Configuration E builds upon Test Configuration D (it adds a NR PSCell in DC). All the message exchange for the test would be done over the LTE PCell, so only the initial attach procedure would be different. The NGEN-DC attach procedure will already be covered in standard protocol tests, so Test Configuration E adds no value on top of Test Configuration D for positioning.\nProposal 2: Test configuration E functionality is covered by Test Configuration D\nPlease notice that this approach is the same that was followed to justify why Test Configuration A does not need to be explicitly tested.","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":84670,"status":"noted","reservation_date":"2019-11-08 06:46:02","uploaded":"2019-11-08 07:03:44","revisionof":"","revisedto":"","release":"Rel-16","crspec":"37.571-2","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198467.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198738","title":"Discussion on Multiple PDU sessions \/ Multiple DRBs","source":"MCC TF160","contact":"Olivier Genoud","contact-id":58316,"tdoctype":"discussion","for":"Decision","abstract":"38.508-1 allows for multiple PDU sessions to be configured in the preamble, and to remain configured throughout the test body.\nThis is not fully accounted for in either the rest of 38.508-1 or 38.523-1.\n2.\tDiscussion\n2.1 New requirements for Multi-PDU session design\nAs default in the preamble of a test case, each PDU session requested by the UE is allocated one DRB, therefore it will never be known during the test body how many PDU sessions, nor how many DRBs have already been allocated.\n2.2\tThe use of DRB2\n38.508-1 Table 4.6.1-13 configures SRB2 with DRB1, but there is no procedure which specifies the use of DRB2.  The first PDU session established therefore will use DRB1.  If the UE only configures one PDU session in the preamble and the test case goes on to configure a voice call, DRB2 will be used to carry the voice call.  If, however the UE configures a second PDU session in the preamble, this will use DRB2 and so the voice call configured in the test body must use another DRB.\nThis results in possible confusion in the test case about which DRB is used for what.\n2.3\tIMS DRB\nAs an example, let us consider a UE which is configured to automatically request 2 PDU sessions when it is switched on.  One for Internet and the other for IMS.  38.508-1 currently defines the default DRB of the first PDU session to be allocated DRB1 and the default DRB of the second PDU session to be allocated DRB2.\nIn LTE we have specific PICS: pc_Provide_IMS_as_second_APN and pc_Provide_Internet_as_second_APN to determine the order in which the UE will always configure the APNs.\nQuestion 1: Is it always possible to guarantee the order in 5G? e.g. If we switch the UE on and it requests a PDU session for IMS first, if we then switch it off and on again, will the UE always request the IMS PDU session first (so always use DRB1 for IMS)?  Or is it possible that this time the UE may request the IMS PDU session second (so according to 38.508-1, DRB2 will now be used for IMS)?\nQuestion 2: 36.508 currently defines the IMS session to use DRB1 and EPS Bearer Id 5.  If the PDU session for IMS is not requested first, the DRB id used in 5G will not be DRB1.  This may cause issues for intersystem tests.\n3.\tProposals\nProposal 1: \nNever hard code either the PDU session, or the DRB id, used in any specific message contents in any 38.523-1 test case.  Instead, always consider for instance \u201cthe DRB id of the first PDU session created in the preamble\u201d, or \u201cthe DRB id of the PDU session configured for IMS\u201d.\nProposal 2:\nA test case can specify a minimum number of PDU sessions it expects to be configured in the preamble, e.g. at least a PDU session for IMS and a PDU session for Internet, but never a maximum (unless the test case is only applicable e.g. for IoT, in which case no PDU sessions will be configured).\nProposal 3:\nDefine in 38-508-1 that DRB1 shall always be used for the PDU session configured for IMS.  This will align SA Option 2 with what has already been defined for 5G EN-DC.  \nAll other DRBs, both those used for the default DRB of further PDU sessions (such as Internet) and non-default DRBs, should be allocated a value from 2 onwards.","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":87380,"status":"noted","reservation_date":"2019-11-08 17:32:51","uploaded":"2019-11-14 14:47:04","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198738.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198845","title":"Discussion on interworking test cases definition for 5GS","source":"CATT, TDIA","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":80141,"status":"noted","reservation_date":"2019-11-26 18:03:46","uploaded":"2019-11-26 18:08:01","revisionof":"R5-198014","revisedto":"","release":"Rel-16","crspec":"38.523-1","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198845.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198846","title":"NR-NR DC Addition in RRC WP","source":"QUALCOMM Europe Inc. - Spain","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":82001,"status":"noted","reservation_date":"2019-11-26 18:03:46","uploaded":"2019-11-26 18:08:01","revisionof":"R5-198200","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198846.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-198899","title":"Addition of NR IMS TC 6.2-423 Interval Too Brief","source":"Huawei,Hisilicon","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":377,"ainumber":"6.3.5.","ainame":"\tTS 34.229-5 (pCRs only)","tdoc_agenda_sort_order":78711,"status":"approved","reservation_date":"2019-11-26 18:04:58","uploaded":"2019-11-26 18:08:01","revisionof":"R5-197871","revisedto":"","release":"Rel-15","crspec":"34.229-5","crspecversion":"0.1.0","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-198899.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-199018","title":"SS-SINR consideration for FR2 Default levels for multi-cell signalling tests in 38.508-1","source":"QUALCOMM Europe Inc. - Spain","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":387,"ainumber":"6.3.5.","ainame":"\tDiscussion Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":81951,"status":"noted","reservation_date":"2019-11-26 18:07:36","uploaded":"2019-11-26 18:08:02","revisionof":"R5-198195","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"5GS_NR_LTE-UEConTest"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_85_Reno\/Docs\/R5-199018.zip","group":"R5","meeting":"R5-85","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]