[{"name":"R4-2500461","title":"Additional test points for CA_n40A-n41C and CA_n41C-n79A with n41C UL","source":"Skyworks Solutions Inc.","contact":"Dominique Brunel","contact-id":75756,"tdoctype":"other","for":"Approval","abstract":"In R4#113, we proposed additional MSD test points for CA_n40A-n41C and CA_n41C-n79A with n41C UL and captured other companies input together with some agreements in a way forward. In this contribution, we readjusted slightly our proposals in view of the latest agreements.","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-02-06 17:11:27","uploaded":"2025-02-07 21:10:39","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2500461.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2500779","title":"Draft CR for TS38.101-1 Rel-19 for adding new NRCA combinations for FR1 for 2 DL","source":"SoftBank Corp.","contact":"Satoru Suzuki","contact-id":100615,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-07 05:49:58","uploaded":"2025-02-07 08:53:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2500779.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2500785","title":"draft TP to TR 38.719-02-01 include  CA_n7A-n40A","source":"Huawei, HiSilicon","contact":"Ling Lin","contact-id":96801,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-02-07 05:52:35","uploaded":"2025-02-07 14:03:24","revisionof":"","revisedto":"R4-2502928","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.3.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2500785.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2500793","title":"draft TP to TR 38.719-02-01 include CA_n1A-n41A","source":"Huawei, HiSilicon","contact":"Ling Lin","contact-id":96801,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-02-07 05:52:35","uploaded":"2025-02-07 14:03:24","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.3.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2500793.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2500794","title":"draft TP to TR 38.719-02-01 include CA_n20A-n41A","source":"Huawei, HiSilicon","contact":"Ling Lin","contact-id":96801,"tdoctype":"pCR","for":"Approval","abstract":"MCC: This was not made available at tdoc submission deadline.","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-02-07 05:52:35","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.3.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2500953","title":"TP for TR38.719-02-01_CA_n8A-n104C","source":"ZTE Corporation, Sanechips","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-02-07 07:32:34","uploaded":"2025-02-07 09:34:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2500953.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2500954","title":"TP for TR38.719-02-01_Intra-band UL CA for CA_n41-n104","source":"ZTE Corporation, Sanechips","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-02-07 07:32:34","uploaded":"2025-02-07 09:34:16","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2500954.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501058","title":"CR for TS 38.101-1 2U\/2D n5-n8","source":"CATT, China Telecom, Huawei","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-02-07 07:36:56","uploaded":"2025-02-07 14:41:38","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":2658.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501058.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501435","title":"Discussion on UL CA_n41C MSD test point and its capture in TS","source":"Huawei, HiSilicon","contact":"Peng Zhang","contact-id":83353,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-02-07 10:10:37","uploaded":"2025-02-07 12:02:44","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501435.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501437","title":"Draft CR for TS 38.101-1 to introduce CA_n8A-n77(2A)","source":"Huawei, HiSilicon, Xiaomi","contact":"Peng Zhang","contact-id":83353,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-02-07 10:10:37","uploaded":"2025-02-07 12:02:44","revisionof":"","revisedto":"R4-2502902","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501437.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501574","title":"Corrections to Harmonic Mixing UL allocations","source":"Qualcomm France","contact":"Antti Immonen","contact-id":93248,"tdoctype":"CR","for":"Agreement","abstract":"MCC: The moderator of [114][105] NR_Baskets_Part_2 provided to chair agreed.","secretary_remarks":"Source modified on 2\/7\/2025. Original source : Qualcomm France","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"agreed","reservation_date":"2025-02-07 11:36:32","uploaded":"2025-02-07 16:50:42","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_R18_2BDL_xBUL-Core"},{"winame":" HPUE_FR1_TDD_NR_CADC_SUL_R18"},{"winame":" HPUE_FR1_FDD_NR_CADC_R18"},{"winame":" NR_CADC_SUL_R19-Core"},{"winame":" HPUE_NR_CADC_SUL_R19-Core"}],"crnumber":2678.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-250602","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501574.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"7.3A.4 ","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501577","title":"CA_n40A-n41C and CA_n41C-n79A MSD","source":"Qualcomm France","contact":"Antti Immonen","contact-id":93248,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-02-07 11:36:33","uploaded":"2025-02-07 16:50:42","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501577.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501644","title":"(NR_CADC_R19_2BDL_xBUL) Draft CR on TS 38.101-1 to correct two bands inter-band CA configurations and reference sensitivity exceptions","source":"ZTE Corporation, Sanechips","contact":"Zhifeng Ma","contact-id":61569,"tdoctype":"draftCR","for":"Endorsement","abstract":"Objective: NR_CADC_R19_2BDL_xBUL","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-02-07 12:16:52","uploaded":"2025-02-07 16:32:16","revisionof":"","revisedto":"R4-2502903","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501644.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501670","title":"Draft CR 38.101-1 to add new NR CA 2BDL configurations","source":"Ericsson, AT&T","contact":"Reihaneh Malekafzaliardakani","contact-id":79411,"tdoctype":"draftCR","for":"Endorsement","abstract":"Draft CR 38.101-1 to add new NR CA 2BDL configurations","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-07 12:32:04","uploaded":"2025-02-07 14:50:46","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501670.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501673","title":"Draft CR 38.101-3 to add new NR CADC 2BDL configurations including FR2","source":"Ericsson,T-Mobile USA","contact":"Reihaneh Malekafzaliardakani","contact-id":79411,"tdoctype":"draftCR","for":"Endorsement","abstract":"Draft CR 38.101-3 to add new NR CADC 2BDL configurations including FR2","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-02-07 12:32:04","uploaded":"2025-02-07 14:50:46","revisionof":"","revisedto":"R4-2502904","release":"Rel-19","crspec":"38.101-3","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501673.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501684","title":"Draft CR for TS 38.101-1 to add new inter-band CA combinations (two bands)","source":"Samsung, Boost Mobile Network, Fujitsu","contact":"Dan Liu","contact-id":93980,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-02-07 12:40:47","uploaded":"2025-02-07 15:45:31","revisionof":"","revisedto":"R4-2502905","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501684.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501777","title":"draft CR 38.101-3 adding CADC_n77(3A)-n260A\/G\/H\/I\/J\/K\/L\/M","source":"Ericsson, US Cellular","contact":"Per Lindell","contact-id":56972,"tdoctype":"draftCR","for":"Endorsement","abstract":"draft CR 38.101-3 adding CADC_n77(3A)-n260A\/G\/H\/I\/J\/K\/L\/M","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-07 14:18:44","uploaded":"2025-02-07 18:55:36","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-3","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501777.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501848","title":"CR for TS 38.101-1 2U\/2D n5-n8","source":"CATT, China Telecom, Huawei","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-02-07 15:05:22","uploaded":"2025-02-07 15:12:31","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":2702.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501848.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501865","title":"CR for TS 38.101-1 2U\/2D n5-n8","source":"CATT, China Telecom, Huawei","contact":"Aijun Cao","contact-id":105513,"tdoctype":"CR","for":"Agreement","abstract":"MCC: The moderator of [114][105] NR_Baskets_Part_2 stated to chair postponed","secretary_remarks":"Source modified on 2\/7\/2025. Original source : CATT, China Telecom, Huawei","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"postponed","reservation_date":"2025-02-07 15:13:46","uploaded":"2025-02-07 15:20:47","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":2704.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501865.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":false,"me_affected":true,"ran_affected":false,"cn_affected":false,"clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501924","title":"TP for adding MSD result for CA_n74-n77 to TR38.719-02-01","source":"KDDI Corporation","contact":"Feng LU","contact-id":98619,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-02-07 15:47:59","uploaded":"2025-02-07 22:18:51","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.3.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501924.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2501987","title":"On near-miss for Rx harmonic mixing","source":"Skyworks Solutions Inc., Anritsu, Qualcomm France, Oppo","contact":"Laurent Noel","contact-id":75860,"tdoctype":"discussion","for":"Approval","abstract":"This contributions clarifies rules for harmonic mixing requirements due to near-miss interference. Some MSD requirements corrections are proposed. New MSD test point is proposed for CA_n14-n30.","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-02-07 16:45:04","uploaded":"2025-02-07 22:24:15","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2501987.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2502902","title":"Draft CR for TS 38.101-1 to introduce CA_n8A-n77(2A)","source":"Huawei, HiSilicon, Xiaomi","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-11 12:48:48","uploaded":"2025-02-20 06:21:08","revisionof":"R4-2501437","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2502902.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2502903","title":"(NR_CADC_R19_2BDL_xBUL) Draft CR on TS 38.101-1 to correct two bands inter-band CA configurations and reference sensitivity exceptions","source":"ZTE Corporation, Sanechips","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"Objective: NR_CADC_R19_2BDL_xBUL","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-11 12:48:48","uploaded":"2025-02-20 13:11:11","revisionof":"R4-2501644","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2502903.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2502904","title":"Draft CR 38.101-3 to add new NR CADC 2BDL configurations including FR2","source":"Ericsson,T-Mobile USA","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"Draft CR 38.101-3 to add new NR CADC 2BDL configurations including FR2","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-11 12:48:48","uploaded":"2025-02-20 13:11:11","revisionof":"R4-2501673","revisedto":"","release":"Rel-19","crspec":"38.101-3","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2502904.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2502905","title":"Draft CR for TS 38.101-1 to add new inter-band CA combinations (two bands)","source":"Samsung, Boost Mobile Network, Fujitsu","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-02-11 12:48:48","uploaded":"2025-02-21 12:51:18","revisionof":"R4-2501684","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.0.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2502905.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2502928","title":"draft TP to TR 38.719-02-01 include  CA_n7A-n40A","source":"Huawei, HiSilicon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":141,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-02-11 12:48:48","uploaded":"2025-02-20 13:11:11","revisionof":"R4-2500785","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.3.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114\/Docs\/R4-2502928.zip","group":"R4","meeting":"R4-114","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503210","title":"Draft CR for TS38.101-1 to add BCS4 and 5 for CA_n77-n79","source":"SoftBank Corp.","contact":"Takehiko Narita","contact-id":100530,"tdoctype":"draftCR","for":"Endorsement","abstract":"to add BCS4 and 5 for CA_n77-n79","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-26 02:53:08","uploaded":"2025-03-28 04:40:30","revisionof":"","revisedto":"R4-2505162","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503210.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503220","title":"Draft CR for TR 38.101-1 include CA_n20-n41","source":"Huawei, HiSilicon","contact":"Ling Lin","contact-id":96801,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-03-26 06:28:44","uploaded":"2025-03-28 12:29:02","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503220.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503240","title":"Cross-band isolation exception cases and corrections","source":"Skyworks Solutions Inc.","contact":"Laurent Noel","contact-id":75860,"tdoctype":"other","for":"Approval","abstract":"This document flags cross-band isolation MSD requirements that deviate from the agreed PRD rules and proposes 1) new MSD test points for invalid requirements, 2) MSD test point for missing requirements, 3) amendments to PRD rules for the 2nd MSD test points.","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-26 21:07:06","uploaded":"2025-03-28 23:53:31","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503240.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503339","title":"Reply LS on UE capability for FDD-FDD inter-band CA simultaneous Rx\/Tx","source":"MediaTek Korea Inc.","contact":"Suhwan Lim","contact-id":109319,"tdoctype":"LS out","for":"Approval","abstract":"RAN4 kindly reply on the RAN2 questions and ask to take above feedback information into account for RAN2 decision to define UE capability if necessary","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-27 12:17:20","uploaded":"2025-03-28 08:28:47","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R2-2501572","lsto":"RAN2","Cc":"RAN1","lsoriginalls":"R4-2420410","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503339.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503482","title":"draft reply LS to RAN2 on UE capability for FDD-FDD inter-band CA simultaneous Rx\/Tx","source":"CATT","contact":"Aijun Cao","contact-id":105513,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-27 14:06:58","uploaded":"2025-03-28 13:31:53","revisionof":"","revisedto":"R4-2505124","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R2-2501572","lsto":"RAN2","Cc":"RAN1","lsoriginalls":"R4-2420410","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503482.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503686","title":"TP for TR 38.719-02-01 on introduction of CA_n40A-n71A","source":"Huawei, HiSilicon","contact":"Peng Zhang","contact-id":83353,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 03:20:49","uploaded":"2025-03-28 10:23:56","revisionof":"","revisedto":"R4-2505163","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503686.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503687","title":"TP for TR 38.719-02-01 on introduction of CA_n28A-n71A","source":"Huawei, HiSilicon","contact":"Peng Zhang","contact-id":83353,"tdoctype":"pCR","for":"Approval","abstract":"MCC: This was changed from revised to noted. The revised tdoc have been withdrawn.","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 03:20:49","uploaded":"2025-03-28 10:23:56","revisionof":"","revisedto":"R4-2505164","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503687.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503692","title":"Discussion and replied LS on UL CA_n5-n8","source":"Huawei, HiSilicon","contact":"Peng Zhang","contact-id":83353,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 03:20:49","uploaded":"2025-03-28 10:23:56","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503692.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503812","title":"Views on RAN2 reply LS on UE capability for FDD-FDD inter-band CA simultaneous Rx-Tx","source":"Apple","contact":"Alexander Sayenko","contact-id":102931,"tdoctype":"other","for":"Approval","abstract":"MCC: R4-2503812 is moved from AI 8.1 to AI 6.3.3 and treated in [103].","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 07:41:58","uploaded":"2025-03-28 19:20:13","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503812.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503972","title":"Clarification on ULCA_n41C IMD MSD test point","source":"ZTE Corporation, Sanechips","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"other","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 08:47:48","uploaded":"2025-03-28 12:32:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503972.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503973","title":"Reply LS on UE capability for FDD-FDD inter-band CA simultaneous RxTx","source":"ZTE Corporation, Sanechips","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 08:47:48","uploaded":"2025-03-28 12:32:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R2-2501572","lsto":"RAN2","Cc":"RAN1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503973.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503975","title":"TP for TR38.719-02-01_CA_n40A-n41C","source":"ZTE Corporation, Sanechips","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-03-28 08:47:48","uploaded":"2025-03-28 12:32:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503975.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503976","title":"TP for TR38.719-02-01_CA_n41C-n79A","source":"ZTE Corporation, CMCC","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-03-28 08:47:48","uploaded":"2025-03-28 12:32:26","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503976.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2503977","title":"draft CR to TS38.101-1_CA_n41A-n104C and CA_n41C-n104A","source":"ZTE Corporation, Sanechips","contact":"Wubin Zhou","contact-id":43891,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 08:47:48","uploaded":"2025-03-28 12:32:26","revisionof":"","revisedto":"R4-2505165","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2503977.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504082","title":"Draft CR for TS 38.101-3 to introduce DC band combinations consist of two bands","source":"Huawei, HiSilicon","contact":"Xiang Gao","contact-id":89062,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:08:34","uploaded":"2025-03-28 11:55:00","revisionof":"","revisedto":"R4-2505166","release":"Rel-19","crspec":"38.101-3","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504082.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504116","title":"CA_n5A-n8A capabilities","source":"Qualcomm France","contact":"Antti Immonen","contact-id":93248,"tdoctype":"other","for":"Approval","abstract":"UE capabilities and other issues for CA_n5A-n8A are discussed in this contribution.","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 10:46:43","uploaded":"2025-03-28 16:03:51","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504116.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504117","title":"Reply LS on UE capability for FDD-FDD inter-band CA simultaneous Rx\/Tx","source":"Qualcomm France","contact":"Antti Immonen","contact-id":93248,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 10:46:43","uploaded":"2025-03-28 16:03:51","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN2","Cc":"RAN1","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504117.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504124","title":"On LS response to RAN1 on UE capability for non-simultaneous RxTx FDD-FDD inter-band CA","source":"Nokia","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"discussion","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:16:37","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504124.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504133","title":"TP to TR 38.719-02-01 CA_n2-n5","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504133.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504134","title":"TP to TR 38.719-02-01 CA_n2-n48","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"R4-2505167","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504134.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504135","title":"TP to TR 38.719-02-01 CA_n2-n77","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"R4-2505168","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504135.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504136","title":"TP to TR 38.719-02-01 CA_n5-n48","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"R4-2505169","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504136.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504137","title":"TP to TR 38.719-02-01 CA_n5-n77","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"R4-2505170","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504137.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504138","title":"TP to TR 38.719-02-01 CA_n48-n66","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"R4-2505171","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504138.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504139","title":"TP to TR 38.719-02-01 CA_n66-n77","source":"Nokia, Verizon","contact":"Johannes Hejselbaek","contact-id":84086,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 10:59:04","uploaded":"2025-03-28 13:04:51","revisionof":"","revisedto":"R4-2505172","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504139.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504412","title":"Draft CR for TS 38.101-1 to add bandwidth combination set 4 and 5 for inter-band CA combinations (two bands)","source":"Samsung, Boost Mobile Network","contact":"Dan Liu","contact-id":93980,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"revised","reservation_date":"2025-03-28 14:39:11","uploaded":"2025-03-28 17:10:55","revisionof":"","revisedto":"R4-2505173","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504412.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504492","title":"TP for TR 38.719-02-01 to correct CA_n20-n77","source":"ZTE Corporation, Sanechips","contact":"Zhifeng Ma","contact-id":61569,"tdoctype":"pCR","for":"Approval","abstract":"Objective:\nNR_CADC_R19_2BDL_xBUL","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-03-28 16:39:25","uploaded":"2025-03-28 17:16:07","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.5.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504492.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504493","title":"Draft CR on TS 38.101-1 to correct inter-band CA configurations for two bands combinations","source":"ZTE Corporation, Sanechips","contact":"Zhifeng Ma","contact-id":61569,"tdoctype":"draftCR","for":"Endorsement","abstract":"Objective:\nNR_CADC_R19_2BDL_xBUL","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-03-28 16:39:25","uploaded":"2025-03-28 17:16:07","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504493.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504574","title":"draft CR for TS38.101-1 to add new NR DL CA n78(2A)-n79A with UL n78(2A)","source":"NTT DOCOMO, INC.","contact":"Ryu Kitagawa","contact-id":88621,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-03-28 20:39:28","uploaded":"2025-03-28 22:12:57","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504574.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2504625","title":"IMD range definition for inter-band MSD due to one band contiguous CA UL configuration","source":"Skyworks Solutions Inc.","contact":"Dominique Brunel","contact-id":75756,"tdoctype":"other","for":"Approval","abstract":"A way forward [2] captured this MSD test points, accounting for other companies\u2019 contributions. Additionally, the way forward encouraged companies to provide clarification on the source of IMD for such MSD test points. In this contribution, we provide our definition and suggest that such definition is captured in the RAN4 band-combination PRD.","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-03-28 23:25:01","uploaded":"2025-03-28 23:47:12","revisionof":"","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2504625.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505124","title":"draft reply LS to RAN2 on UE capability for FDD-FDD inter-band CA simultaneous Rx\/Tx","source":"CATT","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2025-01-04 10:44:20","uploaded":"2025-04-11 01:31:12","revisionof":"R4-2503482","revisedto":"","release":"Rel-19","crspec":"","crspecversion":"","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"R2-2501572","lsto":"RAN2","Cc":"RAN1","lsoriginalls":"R4-2420410","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505124.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505162","title":"Draft CR for TS38.101-1 to add BCS4 and 5 for CA_n77-n79","source":"SoftBank Corp.","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"to add BCS4 and 5 for CA_n77-n79","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2503210","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505162.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505163","title":"TP for TR 38.719-02-01 on introduction of CA_n40A-n71A","source":"Huawei, HiSilicon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2503686","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505163.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505164","title":"TP for TR 38.719-02-01 on introduction of CA_n28A-n71A","source":"Huawei, HiSilicon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2503687","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505164.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505165","title":"draft CR to TS38.101-1_CA_n41A-n104C and CA_n41C-n104A","source":"ZTE Corporation, Sanechips","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2503977","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505165.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505166","title":"Draft CR for TS 38.101-3 to introduce DC band combinations consist of two bands","source":"Huawei, HiSilicon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 09:51:11","revisionof":"R4-2504082","revisedto":"","release":"Rel-19","crspec":"38.101-3","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505166.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505167","title":"TP to TR 38.719-02-01 CA_n2-n48","source":"Nokia, Verizon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504134","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505167.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505168","title":"TP to TR 38.719-02-01 CA_n2-n77","source":"Nokia, Verizon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504135","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505168.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505169","title":"TP to TR 38.719-02-01 CA_n5-n48","source":"Nokia, Verizon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504136","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505169.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505170","title":"TP to TR 38.719-02-01 CA_n5-n77","source":"Nokia, Verizon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504137","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505170.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505171","title":"TP to TR 38.719-02-01 CA_n48-n66","source":"Nokia, Verizon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504138","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505171.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505172","title":"TP to TR 38.719-02-01 CA_n66-n77","source":"Nokia, Verizon","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"approved","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504139","revisedto":"","release":"Rel-19","crspec":"38.719-02-01","crspecversion":"0.4.0","workitem":[{"winame":"NR_CADC_SUL_R19"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505172.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2505173","title":"Draft CR for TS 38.101-1 to add bandwidth combination set 4 and 5 for inter-band CA combinations (two bands)","source":"Samsung, Boost Mobile Network","contact":"Carolyn Taylor","contact-id":90657,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":33,"ainumber":"6.3.3","ainame":"UE RF requirements for NR inter-band CA\/DC configurations including inter band CA for 2 DL with up to 2UL (NR_CADC_R19_2BDL_xBUL)","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-01-04 10:44:21","uploaded":"2025-04-10 06:51:10","revisionof":"R4-2504412","revisedto":"","release":"Rel-19","crspec":"38.101-1","crspecversion":"19.1.0","workitem":[{"winame":"NR_CADC_SUL_R19-Core"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_114bis\/Docs\/R4-2505173.zip","group":"R4","meeting":"R4-114-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]