[{"name":"S2-1812034","title":"[DRAFT] LS on Mobility Management with Satellite Access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG2, RAN WG3","secretary_remarks":"Postponed in parallel session","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24670,"status":"postponed","reservation_date":"2018-11-19 22:01:30","uploaded":"2018-11-20 08:05:26","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN2, RAN3","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812034.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812035","title":"[DRAFT] LS on Position requirements when considering Satellite Access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG3-LI","secretary_remarks":"Postponed in parallel session","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24680,"status":"postponed","reservation_date":"2018-11-19 22:05:09","uploaded":"2018-11-20 08:05:26","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3-LI","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812035.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812036","title":"Rapporteur proposed editorial adjustment to TR 23 737","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes to introduce an editorial adjustment by numbering two sections that should have been numbered during the latest edition of TR 23.73. The content of an Editor's Note is also proposed to be modified for clarification(removing a reference to a battery for a RAN).","secretary_remarks":"Agreed in parallel session. This was Block approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24460,"status":"approved","reservation_date":"2018-11-19 22:08:54","uploaded":"2018-11-20 08:05:26","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812036.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812041","title":"Key Issue: RAN mobility with NGSO regenerative-based satellite access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes a introduce a new key issue to discuss the impact of RAN mobility when gNBs are embarked on board non-geostationary satellites with payloads including on processing and inter satellite links.","secretary_remarks":"Revised in parallel session to S2-1812776.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24510,"status":"revised","reservation_date":"2018-11-19 22:32:10","uploaded":"2018-11-20 08:05:26","revisionof":"","revisedto":"S2-1812776","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812041.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812043","title":"Key Issue on multi connectivity with satellite access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes a introduce a new key issue to discuss Multi connectivity addressing a satellite access in the presence of another satellite access and or terrestrial access.","secretary_remarks":"Revised in parallel session to S2-1812777.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24530,"status":"revised","reservation_date":"2018-11-19 22:38:14","uploaded":"2018-11-20 08:05:26","revisionof":"","revisedto":"S2-1812777","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812043.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812237","title":"Update of solution 1","source":"CATT","contact":"Hucheng Wang","contact-id":56627,"tdoctype":"pCR","for":"Approval","abstract":"This paper would like to update the solution 1.","secretary_remarks":"Revised in parallel session to S2-1812779.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24600,"status":"revised","reservation_date":"2018-11-20 08:30:12","uploaded":"2018-11-20 09:22:59","revisionof":"","revisedto":"S2-1812779","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812237.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812262","title":"New key issue - local access for relay gNB scenario","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new key issue about support for local access for a relay gNB scenario.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24560,"status":"noted","reservation_date":"2018-11-20 08:44:14","uploaded":"2018-11-20 13:30:13","revisionof":"","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812262.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812263","title":"Key Issues update for the impact to PCC framework","source":"CATT","contact":"Yali Guo","contact-id":67048,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes to update the Key Issues for the impact to PCC framework.","secretary_remarks":"Revised in parallel session to S2-1812778.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24570,"status":"revised","reservation_date":"2018-11-20 08:48:00","uploaded":"2018-11-20 08:58:29","revisionof":"","revisedto":"S2-1812778","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812263.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812265","title":"New satellite backhaul scenario - hybrid satellite terrestrial backhaul","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new satellite backhaul scenario describing hybrid satellite terrestrial backhaul.","secretary_remarks":"Revised in parallel session to S2-1812774.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24470,"status":"revised","reservation_date":"2018-11-20 08:55:17","uploaded":"2018-11-20 13:13:42","revisionof":"","revisedto":"S2-1812774","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812265.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812269","title":"New satellite backhaul scenario - relay gNB","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new satellite backhaul scenario relay gNB","secretary_remarks":"Revised in parallel session to S2-1812775.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24490,"status":"revised","reservation_date":"2018-11-20 09:00:02","uploaded":"2018-11-20 13:30:13","revisionof":"","revisedto":"S2-1812775","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812269.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812272","title":"New solution - addition of new RAT type satellite","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new solution for Key Issue QoS with satellite access - Addition of new RAT type satellite.","secretary_remarks":"Revised in parallel session to S2-1812780.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24630,"status":"revised","reservation_date":"2018-11-20 09:03:39","uploaded":"2018-11-20 13:30:13","revisionof":"","revisedto":"S2-1812780","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812272.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812280","title":"New solution - Backhaul triggered QoS adaptation","source":"TNO, THALES","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a solution for QoS with Satellite Backhaul by using UPF information to inform SMF about the need for QoS adaptation in case of the use of satellite connections for backhaul.","secretary_remarks":"Revised in parallel session to S2-1812781.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24650,"status":"revised","reservation_date":"2018-11-20 09:10:23","uploaded":"2018-11-20 12:43:52","revisionof":"","revisedto":"S2-1812781","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812280.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812735","title":"Study on architecture aspects for using satellite access in 5G","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"SID revised","for":"Approval","abstract":"Update to timescales","secretary_remarks":"Revised in parallel session to S2-1812782.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24690,"status":"revised","reservation_date":"2018-11-28 19:48:57","uploaded":"2018-12-03 14:19:09","revisionof":"","revisedto":"S2-1812782","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812735.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812774","title":"New satellite backhaul scenario - hybrid satellite terrestrial backhaul","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new satellite backhaul scenario describing hybrid satellite terrestrial backhaul.","secretary_remarks":"Revision of S2-1812265. Withdrawn","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24480,"status":"withdrawn","reservation_date":"2018-11-28 19:49:16","uploaded":null,"revisionof":"S2-1812265","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812775","title":"New satellite backhaul scenario - relay gNB","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new satellite backhaul scenario relay gNB","secretary_remarks":"Revision of S2-1812269. Withdrawn","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24500,"status":"withdrawn","reservation_date":"2018-11-28 19:49:16","uploaded":null,"revisionof":"S2-1812269","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812776","title":"Key Issue: RAN mobility with NGSO regenerative-based satellite access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes a introduce a new key issue to discuss the impact of RAN mobility when gNBs are embarked on board non-geostationary satellites with payloads including on processing and inter satellite links.","secretary_remarks":"Revision of S2-1812041. Agreed in parallel session. This was Block approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24520,"status":"approved","reservation_date":"2018-11-28 19:49:16","uploaded":"2018-12-03 14:24:03","revisionof":"S2-1812041","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812776.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812777","title":"Key Issue on multi connectivity with satellite access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes a introduce a new key issue to discuss Multi connectivity addressing a satellite access in the presence of another satellite access and or terrestrial access.","secretary_remarks":"Revision of S2-1812043. Revised in parallel session to S2-1813212.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24540,"status":"revised","reservation_date":"2018-11-28 19:49:16","uploaded":"2018-12-03 14:24:03","revisionof":"S2-1812043","revisedto":"S2-1813212","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812777.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812778","title":"Key Issues update for the impact to PCC framework","source":"CATT","contact":"Yali Guo","contact-id":67048,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes to update the Key Issues for the impact to PCC framework.","secretary_remarks":"Revision of S2-1812263. Revised in parallel session to S2-1813223.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24580,"status":"revised","reservation_date":"2018-11-28 19:49:16","uploaded":"2018-12-03 14:24:04","revisionof":"S2-1812263","revisedto":"S2-1813223","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812778.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812779","title":"Update of solution 1","source":"CATT","contact":"Hucheng Wang","contact-id":56627,"tdoctype":"pCR","for":"Approval","abstract":"This paper would like to update the solution 1.","secretary_remarks":"Revision of S2-1812237. Revised in parallel session to S2-1813224.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24610,"status":"revised","reservation_date":"2018-11-28 19:49:16","uploaded":"2018-12-03 14:24:04","revisionof":"S2-1812237","revisedto":"S2-1813224","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812779.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812780","title":"New solution - addition of new RAT type satellite","source":"TNO","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a new solution for Key Issue QoS with satellite access - Addition of new RAT type satellite.","secretary_remarks":"Revision of S2-1812272. Agreed in parallel session. This was Block approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24640,"status":"approved","reservation_date":"2018-11-28 19:49:16","uploaded":"2018-12-03 14:24:05","revisionof":"S2-1812272","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812780.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812781","title":"New solution - Backhaul triggered QoS adaptation","source":"TNO, THALES","contact":"Wieger IJntema","contact-id":73291,"tdoctype":"pCR","for":"Approval","abstract":"This document proposes to add a solution for QoS with Satellite Backhaul by using UPF information to inform SMF about the need for QoS adaptation in case of the use of satellite connections for backhaul.","secretary_remarks":"Revision of S2-1812280. Agreed in parallel session. This was Block approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24660,"status":"approved","reservation_date":"2018-11-28 19:49:17","uploaded":"2018-12-03 14:24:05","revisionof":"S2-1812280","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812781.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1812782","title":"Study on architecture aspects for using satellite access in 5G","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"SID revised","for":"Approval","abstract":"Update to timescales","secretary_remarks":"Revision of S2-1812735. Revised to S2-1813347.","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24700,"status":"revised","reservation_date":"2018-11-28 19:49:17","uploaded":"2018-12-03 14:24:06","revisionof":"S2-1812735","revisedto":"S2-1813347","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1812782.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1813212","title":"Key Issue on multi connectivity with satellite access","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes a introduce a new key issue to discuss Multi connectivity addressing a satellite access in the presence of another satellite access and or terrestrial access.","secretary_remarks":"Revision of S2-1812777. Agreed in parallel session. This was Block approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24550,"status":"approved","reservation_date":"2018-12-01 15:00:30","uploaded":"2018-12-03 14:29:18","revisionof":"S2-1812777","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1813212.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1813223","title":"Key Issues update for the impact to PCC framework","source":"CATT","contact":"Yali Guo","contact-id":67048,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes to update the Key Issues for the impact to PCC framework.","secretary_remarks":"Revision of S2-1812778. WITHDRAWN","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24590,"status":"withdrawn","reservation_date":"2018-12-01 15:00:30","uploaded":null,"revisionof":"S2-1812778","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1813224","title":"Update of solution 1","source":"CATT","contact":"Hucheng Wang","contact-id":56627,"tdoctype":"pCR","for":"Approval","abstract":"This paper would like to update the solution 1.","secretary_remarks":"Revision of S2-1812779. Approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24620,"status":"approved","reservation_date":"2018-12-01 15:00:30","uploaded":"2018-12-03 14:29:22","revisionof":"S2-1812779","revisedto":"","release":"Rel-16","crspec":23.737,"crspecversion":"0.3.0","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1813224.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-1813347","title":"Study on architecture aspects for using satellite access in 5G","source":"THALES","contact":"Cyril MICHEL","contact-id":66699,"tdoctype":"SID revised","for":"Approval","abstract":"Update to timescales","secretary_remarks":"Revision of S2-1812782. Approved","agenda_item_sort_order":43,"ainumber":"6.24","ainame":"Study on architecture aspects for using satellite access in 5G","tdoc_agenda_sort_order":24710,"status":"approved","reservation_date":"2018-11-30 17:10:38","uploaded":"2018-12-03 14:28:58","revisionof":"S2-1812782","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"FS_5GSAT_ARCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_129BIS_West_Palm_Beach\/Docs\/S2-1813347.zip","group":"S2","meeting":"S2-129","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]