[{"name":"S2-172883","title":"LS from RAN WG2: LS Response to LS on SA WG2 involvement for the light connection","source":"RAN WG2","contact":"Marta Martinez Tarradell","contact-id":47010,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 thanks CT WG1 for their LS and provides their inputs on the identified issues with potential RAN\/CT impact based on RAN WG2#97 meeting agreements (which are also listed in the Annex for further reference):. [...] Action: RAN WG2 kindly asks SA WG2","secretary_remarks":"Postponed S2-171642 from S2#120. Postponed to SA WG2 meeting #122.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21360,"status":"postponed","reservation_date":"2017-04-25 07:36:06","uploaded":"2017-04-25 07:38:13","revisionof":"S2-171642","revisedto":"S2-174082","release":"Rel-14","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"CT WG1, RAN WG3","lsoriginalls":"R2-1702152","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-172883.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173016","title":"Paging issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"The RAN paging issue is updated and added additional issue","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20830,"status":"noted","reservation_date":"2017-05-08 07:37:22","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173016.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173017","title":"CDMA interworking issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Potential issues for CDMA interworking","secretary_remarks":"Merged into S2-173887","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20840,"status":"merged","reservation_date":"2017-05-08 07:37:22","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173017.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173018","title":"Implicit Detach issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Updated issues related to implicit detach","secretary_remarks":"Revised in parallel session to S2-173888.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20850,"status":"revised","reservation_date":"2017-05-08 07:37:22","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"S2-173888","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173018.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173019","title":"MT SMS delivery issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Potential issues for MT SMS delivery","secretary_remarks":"Revised in parallel session to S2-173890.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20930,"status":"revised","reservation_date":"2017-05-08 07:37:22","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"S2-173890","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173019.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173020","title":"Paging Priority for MT NAS issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Potential issues for paging priority at MT NAS","secretary_remarks":"Revised in parallel session, merging S2-173017, to S2-173887.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20880,"status":"revised","reservation_date":"2017-05-08 07:37:23","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"S2-173887","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173020.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173021","title":"LC state notification solution","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution with state notifications from RAN to CN","secretary_remarks":"Revised in parallel session to S2-173898.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21180,"status":"revised","reservation_date":"2017-05-08 07:37:23","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"S2-173898","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173021.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173022","title":"Solutions to issue #10 and #x","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution to Issue #10 and issue #x","secretary_remarks":"Revised in parallel session to S2-173899.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21220,"status":"revised","reservation_date":"2017-05-08 07:37:23","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"S2-173899","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173022.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173023","title":"Evaluations of solutions","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Evaluation of solution to Issue #10 and issue #x","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21240,"status":"not treated","reservation_date":"2017-05-08 07:37:23","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173023.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173024","title":"Overall Evaluation","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Overall evaluation and comparison of Light Connection with Connection Suspend-Resume","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21300,"status":"not treated","reservation_date":"2017-05-08 07:37:23","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173024.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173025","title":"Conclusion","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a final conclusion for Light Connection.","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21330,"status":"not treated","reservation_date":"2017-05-08 07:37:23","uploaded":"2017-05-09 14:57:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173025.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173053","title":"Proposes solutions to the identified issues in scope of SA2","source":"Qualcomm Incorporated, Intel, Huawei","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solutions to the identified issues in scope of SA WG2","secretary_remarks":"Revised in parallel session to S2-173895.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21090,"status":"revised","reservation_date":"2017-05-08 07:37:40","uploaded":"2017-05-09 13:57:56","revisionof":"","revisedto":"S2-173895","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173053.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173054","title":"Co-existence between Light Connection and UP optimisation","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"pCR","for":"Approval","abstract":"Analyses the coexistence between Light RRC Connection and User Plane CIOT EPS optimisation.","secretary_remarks":"Revised in parallel session to S2-173897.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21150,"status":"revised","reservation_date":"2017-05-08 07:37:40","uploaded":"2017-05-09 13:57:56","revisionof":"","revisedto":"S2-173897","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173054.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173336","title":"Solutions to identified issues 1, 3, 6, 15, 13 and 17","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solutions to the identified issues in scope of SA WG2. Resubmission of S2-172226.","secretary_remarks":"Revised in parallel session to S2-173896.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21120,"status":"revised","reservation_date":"2017-05-08 19:17:01","uploaded":"2017-05-09 14:27:54","revisionof":"","revisedto":"S2-173896","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173336.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173337","title":"Voiding of redundant issue #18","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to void clause 5.18 because issue #18 is now identical to issue #16","secretary_remarks":"Revised in parallel session to S2-173889.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20910,"status":"revised","reservation_date":"2017-05-08 19:17:01","uploaded":"2017-05-09 14:27:54","revisionof":"","revisedto":"S2-173889","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173337.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173338","title":"Overall evaluation and conclusion","source":"Intel, Qualcomm Incorporated, Huawei","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes overall evaluation and conclusion based on the input that was made available for the conference call on May 3rd.","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21320,"status":"not treated","reservation_date":"2017-05-08 19:17:01","uploaded":"2017-05-09 14:27:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173338.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173425","title":"Location reporting solutions for LC","source":"Samsung","contact":"Jungje Son","contact-id":45723,"tdoctype":"pCR","for":"Approval","abstract":"Propose solutions for key issue #21","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21250,"status":"not treated","reservation_date":"2017-05-09 07:59:16","uploaded":"2017-05-09 08:07:09","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173425.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173455","title":"Dual connectivity impact on RAT-BASED Charging in LC","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to address the issue of reporting dual connectivity charging data collection on different RATS and RAT reporting in LC state.","secretary_remarks":"Revised in parallel session to S2-173891.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20950,"status":"revised","reservation_date":"2017-05-09 07:59:17","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"S2-173891","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173455.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173456","title":"Solution: Handling Paging Policy Differentiation in dual connectivity 3a and 3x","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solution to Handling Paging Policy differentiation in dual connectivity 3a and 3x","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21260,"status":"not treated","reservation_date":"2017-05-09 07:59:17","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173456.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173457","title":"Solution: Handling Paging Priority Indication in dual connectivity 3a and 3x","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes Handling Paging Priority Indication in dual connectivity 3a and 3x","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21270,"status":"not treated","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173457.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173458","title":"Solution: extended DRX Coexistence with LC","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to consider a RAN-based decision on activation of eDRX for a UE that is LC enabled.","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21280,"status":"not treated","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173458.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173459","title":"issue on mobility handling and optimal features to address mobility patterns","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the best UE handling upon mobility characteristics transitions","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21080,"status":"noted","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173459.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173460","title":"support of dual connectivity scenarios: Inactivity detection","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of Inactivity detection in Dual connected LC UE","secretary_remarks":"Revised in parallel session to S2-173892.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20990,"status":"revised","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"S2-173892","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173460.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173461","title":"issue on Migration and Interworking.","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of migration","secretary_remarks":"Revised in parallel session to S2-173894.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21050,"status":"revised","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"S2-173894","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173461.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173462","title":"support of dual connectivity scenarios: Paging","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of Paging in dual connected UEs in LC","secretary_remarks":"Revised in parallel session to S2-173893.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21020,"status":"revised","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"S2-173893","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173462.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173463","title":"Overall LC evaluation","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes an overall LC evaluation","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21310,"status":"not treated","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173463.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173464","title":"[DRAFT] LS on RAT-based charging in Dual connectivity for Light Connection","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Alessio Casati","contact-id":68028,"tdoctype":"LS out","for":"Approval","abstract":"Asks guidance to SA WG5 on what approach to take for per RAT charging in DC for LC","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21340,"status":"not treated","reservation_date":"2017-05-09 07:59:18","uploaded":"2017-05-09 14:57:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG5-SWGB","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173464.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173476","title":"Discussion on Light Connection and CIoT UP optimization","source":"Huawei, HiSilicon","contact":"Qiang Deng","contact-id":61905,"tdoctype":"pCR","for":"Approval","abstract":"This paper is proposed to compare the Light Connection and CIoT UP optimization, including use case, paging load reduction, S1\/S11 signalling reduction and paging latency.","secretary_remarks":"Not Handled","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21290,"status":"not treated","reservation_date":"2017-05-09 13:41:44","uploaded":"2017-05-09 14:07:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173476.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173560","title":"LS from SA WG1: LS on Access Control for Light Connected state in LTE","source":"SA WG1","contact":"Mikko Kanerva","contact-id":69919,"tdoctype":"LS in","for":"Action","abstract":"SA WG1 thanks SA WG2 for its LS on Access Control for Light Connected state in LTE (S1-172181\/S2-172802). SA WG1 has not seen any work items or studies related to this topic but assumes that this is linked to Signalling reduction to enable light connectio","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21350,"status":"noted","reservation_date":"2017-05-14 02:49:32","uploaded":"2017-05-14 02:50:10","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG2, SA WG2","Cc":"CT WG1","lsoriginalls":"S1-172433","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173560.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173887","title":"Paging Priority for MT NAS issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Potential issues for paging priority at MT NAS","secretary_remarks":"Revision of S2-173020, merging S2-173017. Revised in parallel session to S2-173901.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20890,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173020","revisedto":"S2-173901","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173887.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173888","title":"Implicit Detach issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Updated issues related to implicit detach","secretary_remarks":"Revision of S2-173018. Revised in parallel session to S2-173900.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20860,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173018","revisedto":"S2-173900","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173888.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173889","title":"Voiding of redundant issue #18","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to void clause 5.18 because issue #18 is now identical to issue #16","secretary_remarks":"Revision of S2-173337. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20920,"status":"approved","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173337","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173889.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173890","title":"MT SMS delivery issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Potential issues for MT SMS delivery","secretary_remarks":"Revision of S2-173019. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20940,"status":"approved","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173019","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173890.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173891","title":"Dual connectivity impact on RAT-BASED Charging in LC","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to address the issue of reporting dual connectivity charging data collection on different RATS and RAT reporting in LC state.","secretary_remarks":"Revision of S2-173455. Revised in parallel session to S2-173902.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20960,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173455","revisedto":"S2-173902","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173891.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173892","title":"support of dual connectivity scenarios: Inactivity detection","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of Inactivity detection in Dual connected LC UE","secretary_remarks":"Revision of S2-173460. Revised in parallel session to S2-173903.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21000,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173460","revisedto":"S2-173903","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173892.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173893","title":"support of dual connectivity scenarios: Paging","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of Paging in dual connected UEs in LC","secretary_remarks":"Revision of S2-173462. Revised in parallel session to S2-173904.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21030,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173462","revisedto":"S2-173904","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173893.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173894","title":"issue on Migration and Interworking.","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of migration","secretary_remarks":"Revision of S2-173461. Revised in parallel session to S2-173905.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21060,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173461","revisedto":"S2-173905","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173894.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173895","title":"Proposes solutions to the identified issues in scope of SA2","source":"Qualcomm Incorporated, Intel, Huawei","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solutions to the identified issues in scope of SA WG2","secretary_remarks":"Revision of S2-173053. Revised in parallel session to S2-173906.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21100,"status":"revised","reservation_date":"2017-05-22 12:35:44","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173053","revisedto":"S2-173906","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173895.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173896","title":"Solutions to identified issues 1, 3, 6, 15, 13 and 17","source":"Intel, Huawei","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solutions to the identified issues in scope of SA WG2. Resubmission of S2-172226.","secretary_remarks":"Revision of S2-173336. Revised in parallel session to S2-173907.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21130,"status":"revised","reservation_date":"2017-05-22 12:35:45","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173336","revisedto":"S2-173907","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173896.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173897","title":"Co-existence between Light Connection and UP optimisation","source":"Qualcomm Incorporated","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"pCR","for":"Approval","abstract":"Analyses the coexistence between Light RRC Connection and User Plane CIOT EPS optimisation.","secretary_remarks":"Revision of S2-173054. Revised in parallel session to S2-173908.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21160,"status":"revised","reservation_date":"2017-05-22 12:35:45","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173054","revisedto":"S2-173908","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173897.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173898","title":"LC state notification solution","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution with state notifications from RAN to CN","secretary_remarks":"Revision of S2-173021. Revised in parallel session to S2-173909.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21190,"status":"revised","reservation_date":"2017-05-22 12:35:45","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173021","revisedto":"S2-173909","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173898.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173899","title":"Solutions to issue #10 and #x","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution to Issue #10 and issue #x","secretary_remarks":"Revision of S2-173022. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21230,"status":"approved","reservation_date":"2017-05-22 12:35:45","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173022","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173899.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173900","title":"Implicit Detach issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Updated issues related to implicit detach","secretary_remarks":"Revision of S2-173888. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20870,"status":"approved","reservation_date":"2017-05-22 12:36:00","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173888","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173900.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173901","title":"Paging Priority for MT NAS issues","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Potential issues for paging priority at MT NAS","secretary_remarks":"Revision of S2-173887. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20900,"status":"approved","reservation_date":"2017-05-22 12:36:00","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173887","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173901.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173902","title":"Dual connectivity impact on RAT-BASED Charging in LC","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to address the issue of reporting dual connectivity charging data collection on different RATS and RAT reporting in LC state.","secretary_remarks":"Revision of S2-173891. Revised in parallel session to S2-173910.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20970,"status":"revised","reservation_date":"2017-05-22 12:36:00","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173891","revisedto":"S2-173910","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173902.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173903","title":"support of dual connectivity scenarios: Inactivity detection","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of Inactivity detection in Dual connected LC UE","secretary_remarks":"Revision of S2-173892. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21010,"status":"approved","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173892","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173903.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173904","title":"support of dual connectivity scenarios: Paging","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of Paging in dual connected UEs in LC","secretary_remarks":"Revision of S2-173893. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21040,"status":"approved","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173893","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173904.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173905","title":"issue on Migration and Interworking.","source":"NOKIA, Alcatel-Lucent Shanghai Bell","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to analyse the topic of migration","secretary_remarks":"Revision of S2-173894. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21070,"status":"approved","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173894","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173905.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173906","title":"Proposes solutions to the identified issues in scope of SA2","source":"Qualcomm Incorporated, Intel, Huawei","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solutions to the identified issues in scope of SA WG2","secretary_remarks":"Revision of S2-173895. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21110,"status":"approved","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173895","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173906.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173907","title":"Solutions to identified issues 1, 3, 6, 15, 13 and 17","source":"Intel, Huawei","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes solutions to the identified issues in scope of SA WG2. Resubmission of S2-172226.","secretary_remarks":"Revision of S2-173896. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21140,"status":"approved","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173896","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173907.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173908","title":"Co-existence between Light Connection and UP optimisation","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Haris Zisimopoulos","contact-id":57197,"tdoctype":"pCR","for":"Approval","abstract":"Analyses the coexistence between Light RRC Connection and User Plane CIOT EPS optimisation.","secretary_remarks":"Revision of S2-173897. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21170,"status":"approved","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173897","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173908.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173909","title":"LC state notification solution","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution with state notifications from RAN to CN","secretary_remarks":"Revision of S2-173898. Revised in parallel session to S2-173911.","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21200,"status":"revised","reservation_date":"2017-05-22 12:36:01","uploaded":"2017-05-22 12:37:55","revisionof":"S2-173898","revisedto":"S2-173911","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173909.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173910","title":"Dual connectivity impact on RAT-BASED Charging in LC","source":"NOKIA, Alcatel-Lucent Shanghai Bell.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"Proposes to address the issue of reporting dual connectivity charging data collection on different RATS and RAT reporting in LC state.","secretary_remarks":"Revision of S2-173902. Agreed in parallel session Block approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":20980,"status":"approved","reservation_date":"2017-05-22 12:39:40","uploaded":"2017-05-22 12:47:54","revisionof":"S2-173902","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173910.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173911","title":"LC state notification solution","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution with state notifications from RAN to CN","secretary_remarks":"Revision of S2-173909. Approved","agenda_item_sort_order":40,"ainumber":"6.15","ainame":"Study on core network aspects of signalling reduction to enable light connection for LTE","tdoc_agenda_sort_order":21210,"status":"approved","reservation_date":"2017-05-22 12:39:40","uploaded":"2017-05-22 12:47:54","revisionof":"S2-173909","revisedto":"","release":"Rel-15","crspec":23.723,"crspecversion":"0.1.0","workitem":[{"winame":"FS_LTE_LIGHT_CON"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173911.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]