[{"name":"S2-151438","title":"LS from GERAN WG2: LS on extended DRX in idle mode","source":"GERAN WG2","contact":"Nicklas Johansson","contact-id":47575,"tdoctype":"LS in","for":"Action","abstract":"GERAN WG2 is studying power savings for MTC devices within the scope of two ongoing study items, Power Savings for MTC devices (FS_uPOD) and the Cellular IoT study item (FS_IoT_LC) and has identified extended DRX in idle mode as a candidate solution. In t","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15690,"status":"postponed","reservation_date":"2015-05-04 13:12:03","uploaded":"2015-05-04 13:13:51","revisionof":"S2-150715","revisedto":"S2-152137","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"GP-150311","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151438.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151526","title":"Conclusion for connected mode e-DRX","source":"LG Electronics","contact":"Jinsook Ryu","contact-id":39022,"tdoctype":"pCR","for":"Approval","abstract":"This paper proposes the connected mode DRX cycle should be considered to be extended up to 10.24 seconds, instead of introduction of a new eDRX cycle\/state with unnecessary complexity in RAN\/CN.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15570,"status":"merged","reservation_date":"2015-05-18 00:35:43","uploaded":"2015-05-18 00:58:51","revisionof":"","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151526.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151536","title":"Solution evaluation for Idle Mode eDRX Issue 2","source":"LG Electronics","contact":"Jinsook Ryu","contact-id":39022,"tdoctype":"pCR","for":"Approval","abstract":"In this paper, it is proposed to adopt CN based solution for paging strategy on idle mode Issue 2. Therefore it is provided some explanations to resolve the raised concerns against CN based approach during second Conference Call. Further, some evaluation","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15430,"status":"available","reservation_date":"2015-05-18 05:40:10","uploaded":"2015-05-19 07:51:20","revisionof":"","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151536.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151583","title":"Update to eDRX in Idle Mode solution","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"pCR","for":"Approval","abstract":"Abstract of the contribution: This contribution points out at the need for synchronisation between the UE and the network in case of the extended DRX cycle length longer than the System Frame. Such a statement has already been captured in TR23.887. This c","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15350,"status":"revised","reservation_date":"2015-05-18 11:05:54","uploaded":"2015-05-18 15:55:27","revisionof":"","revisedto":"S2-151921","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151583.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151601","title":"MT SMS for Extended DRX","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Decision","abstract":"This contribution provides a solution for handling MT SMS for extended C-DRX","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15500,"status":"revised","reservation_date":"2015-05-18 13:51:57","uploaded":"2015-05-19 12:23:50","revisionof":"","revisedto":"S2-151926","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151601.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151602","title":"Extended DRX in Idle","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Decision","abstract":"This contribution provides details to the solution 5.2.1 Paging coordination between CN and UE","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15370,"status":"revised","reservation_date":"2015-05-18 13:51:57","uploaded":"2015-05-19 12:23:50","revisionof":"","revisedto":"S2-151922","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151602.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151605","title":"Evaluation of paging strategy solutions for Idle mode Issue 2","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Decision","abstract":"Evaluates paging strategy solutions for idle mode Issue 2, and concludes that coordinated UE and CN solution is more efficient and reliable.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15440,"status":"available","reservation_date":"2015-05-18 13:51:57","uploaded":"2015-05-19 12:23:50","revisionof":"","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151605.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151606","title":"GTP-C re-transmissions","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Decision","abstract":"This contribution updates a solution for GTP-C re-transmissions and provides an evaluation of the two available solutions","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15450,"status":"revised","reservation_date":"2015-05-18 13:51:57","uploaded":"2015-05-19 13:22:18","revisionof":"","revisedto":"S2-151924","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151606.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151647","title":"LS from RAN WG2: Reply LS on RAN assumptions from SA2 for FS_eDRX","source":"RAN WG2","contact":"Martin Van Der Zee","contact-id":58600,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 would like to thank SA WG2 for their LS on RAN assumptions for FS_eDRX. This reply LS is related to the HSPA study item 'Study on Small Data Transmission Enhancements for UMTS', i.e. does not apply to LTE. The LTE work item 'RAN enhancements for e","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15700,"status":"postponed","reservation_date":"2015-05-19 06:22:49","uploaded":"2015-05-19 06:30:14","revisionof":"","revisedto":"S2-152145","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"R2-151735","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151647.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151657","title":"On the e-CDRX period","source":"Alcatel-Lucent, Alcatel-Lucent Shanghai Bell","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"This paper addresses the need to identify the expected range of the e-CDRX before we move to normative phase, in order to have a stable selection criterion for solutions.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15540,"status":"revised","reservation_date":"2015-05-19 06:39:08","uploaded":"2015-05-19 08:22:10","revisionof":"","revisedto":"S2-151932","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151657.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151670","title":"solution evaluation on GTP-C retransmission","source":"Huawei","contact":"Runze Zhou","contact-id":60945,"tdoctype":"pCR","for":"Approval","abstract":"solution evaluation on GTP-C retransmission","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15480,"status":"revised","reservation_date":"2015-05-19 07:18:54","uploaded":"2015-05-19 11:10:51","revisionof":"","revisedto":"S2-151925","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151670.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151681","title":"Clean up and evaluation\/conclusion on issues with one solution","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Resolves editor's notes, general clean up and adds evaluation for issues that have only one solution captured in TR. Concludes that these solutions are feasible and target for normative work.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15330,"status":"revised","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 09:04:07","revisionof":"","revisedto":"S2-151920","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151681.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151682","title":"Evaluation of paging strategy solutions for Idle mode Issue 2","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Evaluates paging strategy solutions for idle mode Issue 2, and concludes that it is more efficient that a RAN based solution for determining the paging occasion is more efficient and should be adopted assuming RAN adopts a RAN based approach.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15410,"status":"revised","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 09:04:07","revisionof":"","revisedto":"S2-151923","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151682.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151683","title":"Update and Evaluation of extended C-DRX issues 2 and 3","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Evaluates the different solutions for extended C-DRX issues 2 and 3","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15580,"status":"revised","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 11:01:00","revisionof":"","revisedto":"S2-151983","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151683.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151684","title":"Overall conclusion","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Proposes an overall conclusion of feasibility","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15610,"status":"revised","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 11:01:00","revisionof":"","revisedto":"S2-151984","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151684.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151686","title":"Feasibility of Core Network restart handling with extended DRX","source":"Qualcomm Incorporated, Huawei","contact":"Miguel Griot","contact-id":42742,"tdoctype":"other","for":"Information","abstract":"This contribution shows some options for core network restart handling when Idle mode extended DRX is used. Although, Core Network restart is in the realm of CT WG4, and some more optimal\/detailed solutions could be adopted in CT WG4, it should be clear t","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15710,"status":"available","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 09:04:07","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151686.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151687","title":"3GPP Work Item Exception for eDRX","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"WI exception request","for":"Information","abstract":"Work item exception sheet for new proposed WID eDRX","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15670,"status":"revised","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 11:01:00","revisionof":"","revisedto":"S2-152055","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151687.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151688","title":"Cover sheet for FS_eDRX","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"TS or TR cover","for":"Information","abstract":"Proposed cover sheet for completion of TR 23.770","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15640,"status":"revised","reservation_date":"2015-05-19 07:30:53","uploaded":"2015-05-19 11:01:00","revisionof":"","revisedto":"S2-151985","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151688.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151762","title":"Solution for paging coordination between CN and UE","source":"Intel","contact":"Saso Stojanovski","contact-id":24932,"tdoctype":"pCR","for":"Approval","abstract":"Proposes a solution for paging coordination between CN and UE","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15400,"status":"merged","reservation_date":"2015-05-19 13:45:26","uploaded":"2015-05-19 13:47:42","revisionof":"","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151762.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151920","title":"Clean up and evaluation\/conclusion on issues with one solution","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Resolves editor's notes, general clean up and adds evaluation for issues that have only one solution captured in TR. Concludes that these solutions are feasible and target for normative work.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15340,"status":"approved","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:15","revisionof":"S2-151681","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151920.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151921","title":"Update to eDRX in Idle Mode solution","source":"NEC","contact":"Iskren Ianev","contact-id":59515,"tdoctype":"pCR","for":"Approval","abstract":"Abstract of the contribution: This contribution points out at the need for synchronisation between the UE and the network in case of the extended DRX cycle length longer than the System Frame. Such a statement has already been captured in TR23.887. This c","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15360,"status":"approved","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:16","revisionof":"S2-151583","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151921.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151922","title":"Extended DRX in Idle","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides details to the solution 5.2.1 Paging coordination between CN and UE","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15380,"status":"revised","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:17","revisionof":"S2-151602","revisedto":"S2-152102","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151922.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151923","title":"Evaluation of paging strategy solutions for Idle mode Issue 2","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Evaluates paging strategy solutions for idle mode Issue 2, and concludes that it is more efficient that a RAN based solution for determining the paging occasion is more efficient and should be adopted assuming RAN adopts a RAN based approach.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15420,"status":"approved","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:18","revisionof":"S2-151682","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151923.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151924","title":"GTP-C re-transmissions","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution updates a solution for GTP-C re-transmissions and provides an evaluation of the two available solutions","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15460,"status":"revised","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:19","revisionof":"S2-151606","revisedto":"S2-152025","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151924.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151925","title":"solution evaluation on GTP-C retransmission","source":"Huawei","contact":"Runze Zhou","contact-id":60945,"tdoctype":"pCR","for":"Approval","abstract":"solution evaluation on GTP-C retransmission","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15490,"status":"approved","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:19","revisionof":"S2-151670","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151925.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151926","title":"MT SMS for Extended DRX","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides a solution for handling MT SMS for extended C-DRX","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15510,"status":"revised","reservation_date":"2015-06-02 14:35:37","uploaded":"2015-06-02 15:18:20","revisionof":"S2-151601","revisedto":"S2-152026","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151926.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151932","title":"On the e-CDRX period","source":"Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Huawei, Qualcomm Inc.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"This paper addresses the need to identify the expected range of the e-CDRX before we move to normative phase, in order to have a stable selection criterion for solutions.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15550,"status":"revised","reservation_date":"2015-06-02 14:35:38","uploaded":"2015-06-02 15:18:25","revisionof":"S2-151657","revisedto":"S2-152027","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151932.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151983","title":"Update and Evaluation of extended C-DRX issues 2 and 3","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Evaluates the different solutions for extended C-DRX issues 2 and 3","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15590,"status":"revised","reservation_date":"2015-06-02 14:42:17","uploaded":"2015-06-02 15:18:55","revisionof":"S2-151683","revisedto":"S2-152104","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151983.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151984","title":"Overall conclusion","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Proposes an overall conclusion of feasibility","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15620,"status":"revised","reservation_date":"2015-06-02 14:42:17","uploaded":"2015-06-02 15:18:56","revisionof":"S2-151684","revisedto":"S2-152105","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151984.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-151985","title":"Cover sheet for FS_eDRX","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"TS or TR cover","for":"Information","abstract":"Proposed cover sheet for completion of TR 23.770","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15650,"status":"revised","reservation_date":"2015-06-02 14:42:17","uploaded":"2015-06-02 15:18:57","revisionof":"S2-151688","revisedto":"S2-152106","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-151985.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152025","title":"GTP-C re-transmissions","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution updates a solution for GTP-C re-transmissions and provides an evaluation of the two available solutions","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15470,"status":"approved","reservation_date":"2015-06-02 14:49:19","uploaded":"2015-06-02 15:19:21","revisionof":"S2-151924","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152025.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152026","title":"MT SMS for Extended DRX","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides a solution for handling MT SMS for extended C-DRX","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15520,"status":"revised","reservation_date":"2015-06-02 14:49:19","uploaded":"2015-06-02 15:19:21","revisionof":"S2-151926","revisedto":"S2-152103","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152026.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152027","title":"On the e-CDRX period","source":"Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Huawei, Qualcomm Inc.","contact":"Alessio Casati","contact-id":68028,"tdoctype":"pCR","for":"Approval","abstract":"This paper addresses the need to identify the expected range of the e-CDRX before we move to normative phase, in order to have a stable selection criterion for solutions.","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15560,"status":"withdrawn","reservation_date":"2015-06-02 14:49:19","uploaded":null,"revisionof":"S2-151932","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152055","title":"3GPP Work Item Exception for eDRX","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"WI exception request","for":"Information","abstract":"Work item exception sheet for new proposed WID eDRX","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15680,"status":"approved","reservation_date":"2015-06-02 14:52:16","uploaded":"2015-06-02 15:19:43","revisionof":"S2-151687","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152055.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152102","title":"Extended DRX in Idle","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides details to the solution 5.2.1 Paging coordination between CN and UE","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15390,"status":"approved","reservation_date":"2015-06-02 14:57:13","uploaded":"2015-06-02 15:20:13","revisionof":"S2-151922","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152102.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152103","title":"MT SMS for Extended DRX","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"pCR","for":"Approval","abstract":"This contribution provides a solution for handling MT SMS for extended C-DRX","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15530,"status":"approved","reservation_date":"2015-06-02 14:57:13","uploaded":"2015-06-02 15:20:14","revisionof":"S2-152026","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152103.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152104","title":"Update and Evaluation of extended C-DRX issues 2 and 3","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Evaluates the different solutions for extended C-DRX issues 2 and 3","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15600,"status":"revised","reservation_date":"2015-06-02 14:59:57","uploaded":"2015-06-02 15:20:15","revisionof":"S2-151983","revisedto":"S2-152129","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152104.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152105","title":"Overall conclusion","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Proposes an overall conclusion of feasibility","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15630,"status":"approved","reservation_date":"2015-06-02 14:59:57","uploaded":"2015-06-02 15:20:16","revisionof":"S2-151984","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152105.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152106","title":"Cover sheet for FS_eDRX","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"TS or TR cover","for":"Information","abstract":"Proposed cover sheet for completion of TR 23.770","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15660,"status":"approved","reservation_date":"2015-06-02 14:59:57","uploaded":"2015-06-02 15:20:17","revisionof":"S2-151985","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152106.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-152129","title":"Update and Evaluation of extended C-DRX issues 2 and 3","source":"Qualcomm Incorporated","contact":"Miguel Griot","contact-id":42742,"tdoctype":"pCR","for":"Approval","abstract":"Evaluates the different solutions for extended C-DRX issues 2 and 3","secretary_remarks":"","agenda_item_sort_order":35,"ainumber":"6.15","ainame":"Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX)","tdoc_agenda_sort_order":15601,"status":"approved","reservation_date":"2015-06-05 11:57:42","uploaded":"2015-06-05 11:55:35","revisionof":"S2-152104","revisedto":"","release":"Rel-13","crspec":23.77,"crspecversion":"0.2.0","workitem":[{"winame":"FS_eDRX"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_109_Fukuoka\/Docs\/S2-152129.zip","group":"S2","meeting":"S2-109","year":2015,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]