[{"name":"S2-172917","title":"LS from RAN WG2: Reply LS on UE Radio Capability handling for Option 3\/3a\/3x","source":"RAN WG2","contact":"Wuri Hapsari","contact-id":33742,"tdoctype":"LS in","for":"Action","abstract":"RAN WG2 thanks SA WG2 for their LS on UE Radio Capability handling for Option 3\/3a\/3x. RAN WG2 would like to provide the following answer to the SA WG2 question: Question: RAN WG2\/RAN WG3 to confirm that the MME will not be required to store separate E-UT","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20590,"status":"noted","reservation_date":"2017-04-25 07:36:08","uploaded":"2017-04-25 07:38:13","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG3","lsoriginalls":"R2-1703953","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-172917.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-172918","title":"LS from RAN WG1: LS reply to SA WG2 on maximum data rate","source":"RAN WG1","contact":"Tao Chen","contact-id":56050,"tdoctype":"LS in","for":"Action","abstract":"RAN WG1 would like to thank SA WG2 for its liaison statement on data rates and latency with NR, E-UTRA, EPS and 5GS in S2-172398\/R1-1706186. From a physical layer design perspective, NR targets 20Gbps for downlink and 10Gbps for uplink per UE according to","secretary_remarks":"Response drafted in S2-173512. Final response in S2-173685","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20620,"status":"replied to","reservation_date":"2017-04-25 13:35:05","uploaded":"2017-04-25 13:36:43","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, RAN WG2","Cc":"RAN WG3, SA WG1, CT WG4, CT WG1","lsoriginalls":"R1-1706857","lsreply":"S2-173685, S2-173685","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-172918.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173132","title":"Secondary RAT and data volume reporting for dual connectivity with NR","source":"Qualcomm incorporated","contact":"Stefano Faccin","contact-id":57487,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Performs changes to allow reporting of 'Secondary RAT' 'data volume' for secondary RAT being 5G NR","secretary_remarks":"WI Code should be TEI14, EDCE5 for Rel-14 CR. Postponed in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20770,"status":"postponed","reservation_date":"2017-05-08 07:38:02","uploaded":"2017-05-09 13:57:57","revisionof":"","revisedto":"","release":"Rel-14","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"TEI14"},{"winame":"EDCE5"}],"crnumber":3241.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173132.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173133","title":"Network selection in 5G deployments","source":"SK Telecom","contact":"Runze Zhou","contact-id":60945,"tdoctype":"discussion","for":"Discussion","abstract":"It is proposed to consider core network selection in NSA deployments","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20700,"status":"noted","reservation_date":"2017-05-08 07:38:05","uploaded":"2017-05-09 14:27:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173133.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173134","title":"Core network selection for 5G subscribers","source":"SK Telecom","contact":"Runze Zhou","contact-id":60945,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduced SGW\/PGW selection in consideration of the use of NR as a secondary RAT. Also introduced D\u00c9COR\/eDECOR to support DCN selection with NR access.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20710,"status":"noted","reservation_date":"2017-05-08 07:38:05","uploaded":"2017-05-09 14:27:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3242.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173134.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173324","title":"Support of DC for NR\/LTE and usage information collection","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"discussion","for":"Agreement","abstract":"Provides technical solution to getting NR usage information in EPC, the CR will be written if way forward agreed.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20730,"status":"noted","reservation_date":"2017-05-08 16:45:39","uploaded":"2017-05-09 15:27:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173324.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173509","title":"Updated scope for Dual Connectivity with other RATs","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Adds: 'The Evolved Packet System also provides support for the E-UTRAN to control a Dual Connectivity radio connection that uses a combination of E-UTRA and another radio access technology (e.g. NR). ' to the end of the Scope.","secretary_remarks":"Not Handled","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20820,"status":"not treated","reservation_date":"2017-05-09 13:41:56","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"S2-174378","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3255.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173509.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173510","title":"Subscription control for EPC_DC_NR after handover from UTRAN\/GERAN","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: After a successful handover from GERAN\/UTRAN to E-UTRAN, the UE will perform a TAU, and then the HSS can update the MME Subscription Data. The MME will then send the updated Handover Restriction List to the E-UTRAN.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20780,"status":"noted","reservation_date":"2017-05-09 13:41:59","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3256.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173510.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173511","title":"UE capability handling for EPC_DC_NR","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Text is added to the 'UE Radio Capability Handling' clause 5.11.2 to indicate that the NR capabilities are embedded within the existing IE that the MME stores.","secretary_remarks":"Revised in parallel session to S2-173586.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20600,"status":"revised","reservation_date":"2017-05-09 13:42:02","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"S2-173586","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3257.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173511.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173512","title":"[DRAFT] Request to update maximum data rate values in EPS","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"LS out","for":"Approval","abstract":"Asks RAN WG3 and CT WG4 to update their specifications. Suggest that they align with the CT WG1 value.","secretary_remarks":"Response to S2-172918. Revised in parallel session to S2-173587.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20630,"status":"revised","reservation_date":"2017-05-09 13:42:05","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"S2-173587","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, CT WG4, CT WG1","Cc":"SA WG1, RAN WG2","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173512.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173513","title":"Thoughts on latency related updates for EPC_DC_NR","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"discussion","for":"Approval","abstract":"Discusses the 'low latency' related work that is needed as part of the EPC_DC_NR work item.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20690,"status":"noted","reservation_date":"2017-05-09 13:42:05","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173513.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173514","title":"HSS or PGW control of 'per RAT data volume reporting'","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"discussion","for":"Approval","abstract":"Builds on agreements at the last meeting documented in S2-172322. Discusses aspects of how the functionality is activated.","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20720,"status":"noted","reservation_date":"2017-05-09 13:42:06","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173514.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173515","title":"Per EPS bearer, RAN selection of DC (or non-DC) usage","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Text is added to clarify that: - the E-UTRAN controls whether to use DC or not. - the E-UTRAN makes a per-EPS bearer choice on the type of bearer ('locked to master cell's RAT'; 'locked to secondary cell', 'bearer split in the RAN betwe","secretary_remarks":"Not Handled","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20810,"status":"not treated","reservation_date":"2017-05-09 13:42:06","uploaded":"2017-05-09 16:57:54","revisionof":"","revisedto":"S2-174380","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3258.0,"crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173515.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173557","title":"LS from SA WG1: Reply LS on Data rates and Latency with NR, E-UTRA, EPS and 5GS","source":"SA WG1","contact":"Alice Li","contact-id":62675,"tdoctype":"LS in","for":"Action","abstract":"SA WG1 thanks SA WG2 for their LS on data rates and latency with NR, E-UTRA, EPS and 5GS. SA WG1 would like to provide the following answers: ACTION A: SA WG2 would like to ask SA WG1 whether for the 5G System a more stringent packet delay budget range th","secretary_remarks":"Noted in parallel session","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20680,"status":"noted","reservation_date":"2017-05-14 02:49:32","uploaded":"2017-05-14 02:50:10","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2","Cc":"RAN WG1, RAN WG2, RAN WG3, CT WG1, CT WG4","lsoriginalls":"S1-172409","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173557.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173586","title":"UE capability handling for EPC_DC_NR","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Text is added to the 'UE Radio Capability Handling' clause 5.11.2 to indicate that the NR capabilities are embedded within the existing IE that the MME stores.","secretary_remarks":"Revision of S2-173511. Agreed in parallel session Block approved","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20610,"status":"agreed","reservation_date":"2017-05-22 12:22:07","uploaded":"2017-05-22 12:27:54","revisionof":"S2-173511","revisedto":"","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3257.0,"crrevision":1.0,"crcategory":"B","tsg_crp":"SP-170375","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173586.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173587","title":"[DRAFT] Request to update maximum data rate values in EPS","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"LS out","for":"Approval","abstract":"Asks RAN WG3 and CT WG4 to update their specifications. Suggest that they align with the CT WG1 value.","secretary_remarks":"Revision of S2-173512. Revised in parallel session to S2-173685.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20640,"status":"revised","reservation_date":"2017-05-22 12:22:09","uploaded":"2017-05-22 12:27:54","revisionof":"S2-173512","revisedto":"S2-173685","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN WG3, CT WG4, CT WG1","Cc":"SA WG1, RAN WG2","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173587.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173588","title":"[DRAFT] LS on CN aspects for low latency for EPC_DC_NR","source":"Vodafone","contact":"Chris Pudney","contact-id":1122,"tdoctype":"LS out","for":"Approval","abstract":"To: TSG RAN, TSG SA. CC: SA WG1, TSG CT","secretary_remarks":"Created in parallel session. Revised in parallel session to S2-173686.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20660,"status":"revised","reservation_date":"2017-05-22 12:22:09","uploaded":"2017-05-22 12:27:54","revisionof":"","revisedto":"S2-173686","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN, TSG SA","Cc":"SA WG1, TSG CT","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173588.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173589","title":"[DRAFT] LS on Support of NR using Dual Connectivity using EPC","source":"Ericsson","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG5-CH","secretary_remarks":"Created in parallel session. Revised in parallel session to S2-173688.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20740,"status":"revised","reservation_date":"2017-05-22 12:22:09","uploaded":"2017-05-22 12:27:54","revisionof":"","revisedto":"S2-173688","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG5-CH","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173589.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173590","title":"TS 23.401 Subscription Control for EPC_DC_NR","source":"[rev 3 was Nokia, Alcatel-Lucent Shanghai Bell], Vodafone, DoCoMo","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduced subscription parameter for EPC_DC_LTE_NR to indicate whether UE has subscription for obtaining user plane connectivity via NR while camping in LTE\/EPC. Also introduced it is a parameter for signaling from HSS to MME, MME to e","secretary_remarks":"Revision of (agreed) S2-172397 from S2#120. Created in parallel session. Revised in parallel session to S2-173687.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20790,"status":"revised","reservation_date":"2017-05-22 12:22:09","uploaded":"2017-05-22 12:27:54","revisionof":"S2-172397","revisedto":"S2-173687","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3225.0,"crrevision":4.0,"crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173590.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173685","title":"Request to update maximum data rate values in EPS","source":"SA WG2","contact":"Chris Pudney","contact-id":1122,"tdoctype":"LS out","for":"Approval","abstract":"To: RAN WG3, CT WG4, CT WG1, CT WG3, SA WG5. CC: SA WG1, RAN WG2","secretary_remarks":"Revision of S2-173587. Agreed in parallel session Block approved","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20650,"status":"approved","reservation_date":"2017-05-22 12:28:37","uploaded":"2017-05-22 12:37:54","revisionof":"S2-173587","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"S2-172918","lsto":"RAN WG3, CT WG4, CT WG1, CT WG3, SA WG5","Cc":"SA WG1, RAN WG2","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173685.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173686","title":"EPC QoS aspects for TSG RAN's lower latency features","source":"SA WG2","contact":"Chris Pudney","contact-id":1122,"tdoctype":"LS out","for":"Approval","abstract":"To: TSG RAN, TSG SA. CC: SA WG1, TSG CT","secretary_remarks":"Revision of S2-173588. Agreed in parallel session Block approved","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20670,"status":"approved","reservation_date":"2017-05-22 12:28:37","uploaded":"2017-05-22 12:37:54","revisionof":"S2-173588","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN, TSG SA","Cc":"SA WG1, TSG CT","lsoriginalls":"","lsreply":"RP-171217","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173686.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173687","title":"TS 23.401 Subscription Control for EPC_DC_NR","source":"Nokia, Alcatel-Lucent Shanghai Bell, Vodafone, DoCoMo, AT&T","contact":"Chris Pudney","contact-id":1122,"tdoctype":"CR","for":"Approval","abstract":"Summary of change: Introduced subscription parameter for EPC_DC_LTE_NR to indicate whether UE has subscription for obtaining user plane connectivity via NR while camping in LTE\/EPC. Also introduced it is a parameter for signaling from HSS to MME, MME to e","secretary_remarks":"Revision of S2-173590. Agreed in parallel session Block approved","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20800,"status":"agreed","reservation_date":"2017-05-22 12:28:37","uploaded":"2017-05-22 12:37:54","revisionof":"S2-173590","revisedto":"","release":"Rel-15","crspec":23.401,"crspecversion":"14.3.0","workitem":[{"winame":"EDCE5"}],"crnumber":3225.0,"crrevision":5.0,"crcategory":"B","tsg_crp":"SP-170375","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173687.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-173688","title":"[DRAFT] LS on Support of NR using Dual Connectivity using EPC","source":"SA WG2","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG5-CH","secretary_remarks":"Revision of S2-173589. Revised to S2-174068.","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20750,"status":"revised","reservation_date":"2017-05-22 12:28:38","uploaded":"2017-05-22 12:37:54","revisionof":"S2-173589","revisedto":"S2-174068","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG5-CH","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-173688.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"S2-174068","title":"LS on Support of NR using Dual Connectivity using EPC","source":"SA WG2","contact":"Shabnam Sultana","contact-id":21207,"tdoctype":"LS out","for":"Approval","abstract":"To: SA WG5-CH","secretary_remarks":"Revision of S2-173688. Approved","agenda_item_sort_order":39,"ainumber":"6.14","ainame":"EPC support for Option 3\/3a\/3x Dual Connectivity with New Radio (EDCE5)","tdoc_agenda_sort_order":20760,"status":"approved","reservation_date":"2017-05-22 12:51:49","uploaded":"2017-05-22 12:57:54","revisionof":"S2-173688","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG5-CH","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_121_Hangzhou\/Docs\/S2-174068.zip","group":"S2","meeting":"S2-121","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]