[{"name":"R4-1911939","title":"Correction on scope of interruption requirements of EN-DC in TS 38.133","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":190,"ainumber":"6.10.7.6","ainame":"Maintenance for other requirements [NR_newRAT-Core]","tdoc_agenda_sort_order":193900,"status":"endorsed","reservation_date":"2019-10-04 13:37:08","uploaded":"2019-10-04 14:32:23","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.7.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_92Bis\/Docs\/R4-1911939.zip","group":"R4","meeting":"R4-92","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-1911944","title":"Editorial CR on section 8.2","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":190,"ainumber":"6.10.7.6","ainame":"Maintenance for other requirements [NR_newRAT-Core]","tdoc_agenda_sort_order":194400,"status":"endorsed","reservation_date":"2019-10-04 13:37:08","uploaded":"2019-10-04 14:32:23","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.7.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_92Bis\/Docs\/R4-1911944.zip","group":"R4","meeting":"R4-92","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]