[{"name":"R4-2514874","title":"Draft big CR on performance requirements for NR_RRM_Ph5","source":"Ericsson, CATT","contact":"Jin Lian","contact-id":107778,"tdoctype":"draftCR","for":"Endorsement","abstract":"","secretary_remarks":"for email approval","agenda_item_sort_order":224,"ainumber":"6.10.2","ainame":"RRM performance requirements of FR2-1 SSB based L3 measurement delay reduction for connected mode","tdoc_agenda_sort_order":0,"status":"endorsed","reservation_date":"2025-09-10 09:50:40","uploaded":"2025-10-24 13:57:10","revisionof":"","revisedto":"","release":"Rel-19","crspec":"38.133","crspecversion":"19.2.0","workitem":[{"winame":"NR_RRM_Ph5-Perf"}],"crnumber":"","crrevision":"","crcategory":"B","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_ran\/WG4_Radio\/TSGR4_116bis\/Docs\/R4-2514874.zip","group":"R4","meeting":"R4-116-bis","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]