[{"name":"SP-240193","title":"TR 22.848 on FS_ISN for one-step approval","source":"SA WG1","contact":"Alain Sultan","contact-id":10343,"tdoctype":"draft TR","for":"Approval","abstract":"Abstract of document: TR 22.848 v.1.0.0 captures the outcome of the SA WG1 Rel-19 Study on Interconnect of SNPN (FS_ISN) aiming at identifying use cases and potential new requirements related to the interconnect of SNPNs with two aspects: - Groups of interconnected SNPNs - SNPN cellular hotspots After finalizing the consolidated requirements, the study has concluded and is provided to TSG SA for one-step approval. Changes since last presentation to SA: This is the first presentation to TSG SA. 100% completion. Outstanding Issues: None Contentious Issues: None","secretary_remarks":"This DRAFT TR was approved","agenda_item_sort_order":85,"ainumber":"6.10.1","ainame":"SA WG1 Specifications for Approval \/ for Information and Approval","tdoc_agenda_sort_order":11870,"status":"approved","reservation_date":"2024-03-06 09:35:25","uploaded":"2024-03-12 15:02:51","revisionof":"","revisedto":"","release":"Rel-19","crspec":22.848,"crspecversion":"1.0.0","workitem":[{"winame":"FS_ISN"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_103_Maastricht_2024-03\/Docs\/SP-240193.zip","group":"SP","meeting":"SP-103","year":2024,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]