[{"name":"C4-194131","title":"Overload Control options","source":"Huawei Technologies Sweden AB","contact":"Giorgi Gulbani","contact-id":82292,"tdoctype":"discussion","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":25,"ainumber":"6.1.15","ainame":"Load and Overload Control of 5GC Service Based Interfaces [LOLC]","tdoc_agenda_sort_order":0,"status":"noted","reservation_date":"2019-09-25 08:02:13","uploaded":"2019-09-27 13:20:53","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":[{"winame":"LOLC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_ct\/WG4_protocollars_ex-CN4\/TSGCT4_94_Portoroz\/Docs\/C4-194131.zip","group":"C4","meeting":"C4-94","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"C4-194143","title":"Discussion on OCI conveyance solution","source":"China Mobile","contact":"Yue Song","contact-id":57977,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"","agenda_item_sort_order":25,"ainumber":"6.1.15","ainame":"Load and Overload Control of 5GC Service Based Interfaces [LOLC]","tdoc_agenda_sort_order":0,"status":"withdrawn","reservation_date":"2019-09-25 09:42:38","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"LOLC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"C4","meeting":"C4-94","year":2019,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]