[{"name":"SP-180003","title":"LS from 5GAA WG2: LS on V1 and V2 reference points","source":"5GAA WG2","contact":"Heejin Kim","contact-id":71611,"tdoctype":"LS in","for":"Action","abstract":"5GAA WG2 discussed how to provision PC5 parameters for V2X operations using 3GPP LTE Rel-14 standards, and have reached the consensus that, in addition to the methods currently specified in 3GPP standards, it is beneficial to support an option for a V2X application server to provision PC5 parameters via V1 interface. 5GAA understands that the current 3GPP standards do not support this option, and would like to recommend making corresponding specification support. 5GAA WG2 have also reached the consensus that, in addition to the methods currently specified in 3GPP standards, it is beneficial to support an option for a V2X application server to provision PC5 parameters to the V2X Control Function via V2 interface. 5GAA understands that the current 3GPP standards do not support this option, and would like to recommend making corresponding specification support. It is 5GAA WG2's understanding that a UE is configured with a single set of PC5 parameters at a given time, either using V1 or V3","secretary_remarks":"Postponed SP-170846 from TSG SA#78. Response drafted in SP-180126. Final response in SP-180233","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10480,"status":"replied to","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"SP-170846","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"SA WG2, SA WG6, TSG CT","lsoriginalls":"5GAA_A-170278","lsreply":"SP-180233","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180003.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180004","title":"LS from NGMN: NGMN White Paper on Service-based Architecture in 5G","source":"NGMN","contact":"Klaus Moschner","contact-id":59428,"tdoctype":"LS in","for":"Information","abstract":"Intention of the LS and required actions: NGMN is pleased to inform the recipients of this liaison statement that the White Paper of the NGMN Service-based Architecture in 5G has been published. The deliverable has been created by NGMN Mobile Network Operator-Partners. The document describes a service framework including service registration, service authorization, and service discovery. Service-based Architecture for 5G is designed in a forward-looking manner, such that the functionalities in 5G Core Network (CN) consist of services, the interface between Control Plane (CP) and User Plane (UP) should be Service Based Interface (SBI) and the Data Service should be used. The deployment aspects of SBA are explored along with the gap analysis and recommendations for related SDOs. NGMN kindly requests the recipients of this liaison to take the content of this White Paper and the recommendations into account for their ongoing work on the industry-wide 5G architecture.","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10390,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, SA WG5, ETSI ISG NFV, GSMA","Cc":"TSG SA, SA WG3, TSG CT, CT WG4","lsoriginalls":"180105 LS NGMN SBA in 5G","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180004.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180005","title":"LS from BBF: 5G-FMC - First release of BBF study results","source":"BBF","contact":"Michael Fargano","contact-id":57382,"tdoctype":"LS in","for":"Information","abstract":"Dear colleagues, BBF has progressed its study of converged wireline-wireless networks that use the 5G Core Network (5GC). BBF SD-420, attached to this liaison, contains a first set of results from the BBF study (an extract of SD-406 and SD-407 which may impact 3GPP), including principle\/architectural design guidelines, key issues, preliminary gap analysis for architectural models identified regarding identifiers, functions and procedures concerning the 5G AN-CN interfaces N1, N2, N3 and N4. We are interested in your feedback as we develop resolution of the issues identified. According to the understanding of the joint 3GPP-BBF Workshop in February 2017 and in line with our ongoing cooperation on 5G-FMC, we are sharing these outcomes to facilitate 5G system architectural and functional integration. We recommend that 3GPP considers these results in related studies and specification work. Where the outcomes of the BBF study identify aspects of concern to the BBF, including the fixed broad","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10430,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA, SA WG2","Cc":"SA WG5","lsoriginalls":"BBF LIAISE-120","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180005.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180010","title":"LS from NGMN:  Architectural Proposal for the Handling of Network Operations Data with Specific Focus on Virtualized Networks","source":"NGMN","contact":"Klaus Moschner","contact-id":59428,"tdoctype":"LS in","for":"Information","abstract":"Intention of the LS and required actions As network operators move towards 5G, the challenges associated with accessing and storing network data, especially from highly virtualized networks, are expected to increase significantly. The white paper 'Architectural Proposal for the Handling of Network Operations Data with Specific Focus on Virtualized Networks' proposes a technical solution how to capture and process network data such that many different use cases, both for virtualized and legacy scenarios, can be fulfilled. The purpose of this liaison paper is to draw vendors' attention to a new technical direction which operators are keen to explore and develop further. In particular, the paper proposes an architectural solution which outlines operators' desires to achieve improved access to network data in order to broaden analytics capabilities and overcome some of today's functional limitations. The NGMN Network Management and Orchestration Working Group requests vendors and probe sup","secretary_remarks":"This LS was noted and forwarded to SA WG5.","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10400,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"3GPP, ETSI, TM Forum","Cc":"","lsoriginalls":"NGMN_LS_Future_Network_Tracing","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180010.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180011","title":"LS from oneM2M: Supporting 3GPP V2X service in oneM2M","source":"oneM2M","contact":" Anonymous","contact-id":4132,"tdoctype":"LS in","for":"Information","abstract":"Overview: The Vehicle-to-Everything (V2X) services have been identified as one of the key enabler for autonomous driving and intelligent transport systems. oneM2M, develops a horizontal service layer for the Internet of Things (IoT), and has published technical standards for interoperability via a common service layer architecture and APIs, for various vertical industries including vehicular domain. oneM2M recognizes that both 3GPP and 5GAA are working on the V2X area from the connectivity access network and the business perspectives. In order to enable an efficient interworking of IoT applications across different verticals, compatibility and interoperability with 3GPP defined V2X and the 5GAA reference architecture is of interest to oneM2M members. In oneM2M Release 4, a new Work Item 'Interworking with 3GPP V2X' has been approved. This WI is targeted to support end-to-end V2X services via the oneM2M common service layer based on the 3GPP V2X network services. The standardized horizo","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10440,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA, 5GAA","Cc":"","lsoriginalls":"TP-2018-0057R01","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180011.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180012","title":"LS from ETSI ISG ZSM: Formation of a new ETSI ISG for Zero Touch Network and Service Management (ZSM)","source":"ETSI ISG ZSM","contact":"Nurit Sprecher","contact-id":68467,"tdoctype":"LS in","for":"Information","abstract":"The recently formed ETSI Industry Specification Group (ISG) Zero-Touch Network and Service Management (ZSM) aims to produce a new, future-proof, horizontal and vertical end-to-end operability architecture and solutions which enable agile, efficient and qualitative management and operational automation of emerging and future networks and services. In this context, horizontal end-to-end refers to cross-domain, cross-technology aspects, while vertical end-to-end refers to cross-layer aspects, from the resource-oriented layers up to the customer-oriented service layers. The goal is to have all operational processes and tasks (e.g., planning and design, delivery, deployment, provisioning, monitoring and optimisation) executed automatically, ideally with 100% automation and without human intervention. Existing solutions will be leveraged wherever applicable. The ISG ZSM aims to work with and facilitate the coordination and cooperation between relevant standardization bodies and open source p","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10450,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"ZSM(18)000046 r5","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180012.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180013","title":"LS from SA WG1: Reply LS to establish collaboration between IIC and 3GPP","source":"SA WG1","contact":"Amar Deol","contact-id":21463,"tdoctype":"LS in","for":"Information","abstract":"SA WG1 thanks IIC LSWG for their liaison dated 7 December 2017 for establishing liaison between IIC and 3GPP. SA WG1 agrees that establishing a liaison relationship between our organizations would be mutually beneficial and agree with the suggested areas and methods of collaboration indicated in the IIC liaison.","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10460,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"IIC Liaison Working Group","Cc":"TSG SA","lsoriginalls":"S1-180299","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180013.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180018","title":"LS from SA WG6: Reply LS on V1 and V2 reference points","source":"SA WG6","contact":"Niranth Amogh","contact-id":39608,"tdoctype":"LS in","for":"Information","abstract":"SA WG6 thanks 5GAA WG2 for the LS on V1 and V2 reference points. SA WG6 would like to inform 5GAA WG2 that 3GPP has approved a study item on application layer support for V2X services. This study will be conducted in SA WG6. The attached WID is for your reference which provides the details of the study.","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10490,"status":"noted","reservation_date":"2018-02-22 10:44:39","uploaded":"2018-02-23 08:10:15","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"5GAA WG2","Cc":"TSG SA, SA WG2","lsoriginalls":"S6-180196","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180018.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180088","title":"1 CR to 23.285 (V2XARC, Rel-14)","source":"SA WG2","contact":"Maurice Pope","contact-id":648,"tdoctype":"CR pack","for":"Approval","abstract":"23.285 CR0039R1","secretary_remarks":"Approved","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10510,"status":"approved","reservation_date":"2018-03-12 14:29:06","uploaded":"2018-03-14 14:07:56","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180088.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":[{"crtdoc":"S2-181087","crwgdecision":"agreed","crtsgdecision":"approved","crspec":23.285,"crnumber":39,"crrevision":1.0,"crcategory":"F","crrelease":"Rel-14","crspecversion":"14.5.0","crtitle":"Clarification on PC5 parameters from V2X Application Server"}],"crsinpacknumber":1},
{"name":"SP-180126","title":"[DRAFT] Reply LS on V1 and V2 reference points","source":"LG Electronics","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"LS out","for":"Approval","abstract":"Reply LS to 5GAA on V1 and V2 reference points (SP-180003)","secretary_remarks":"Response to SP-180003. Revised to SP-180214.","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10520,"status":"revised","reservation_date":"2018-03-13 06:56:47","uploaded":"2018-03-15 01:39:39","revisionof":"","revisedto":"SP-180214","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"V2XARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"5GAA WG2","Cc":"SA WG2, SA WG6, TSG CT","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180126.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180175","title":"LS from NGMN: NGMN Paper on 5G End-to-End Architecture Framework","source":"NGMN","contact":"Klaus Moschner","contact-id":59428,"tdoctype":"LS in","for":"Information","abstract":"NGMN 5G Work-Programme, Requirements and Architecture (P1): In February 2015 the NGMN Alliance published its 5G White Paper providing consolidated 5G operator requirements. In June 2016 NGMN launched the second phase of its 5G-focused work-programme and in September 2017 the first version of the NGMN End-to-End Architecture Framework was published, building on and developing end-to-end architecture principles from the 2015 5G White Paper and the first phase of work in project P1, which can support the standardisation and subsequent availability of 5G for 2020 and beyond. Intention of the LS and required actions: NGMN is pleased to inform the recipients of this liaison statement that the second version of the NGMN 5G End-to-End Architecture Framework has been published. The Security and Identity Management sections have been further developed by the NGMN Security Competence Team whilst leaving the other sections untouched. As such the attached version will be of especial interest to tho","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10410,"status":"noted","reservation_date":"2018-03-14 13:05:01","uploaded":"2018-03-14 13:35:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG3, ETSI SAGE, ETSI TC CYBER, ISO\/IEC JTC1\/SC 27, FIDO Alliance","Cc":"TSG SA, TSG RAN, SA WG1, SA WG2, SA WG3-LI, 3GPP TG SA WG5, ETSI ISG NFV, ETSI ISG MEC, ETSI TC LI, Broadband Forum, Wireless Broadband Alliance, IEEE LAN\/MAN, MEF, TM Forum","lsoriginalls":"Liaison NGMN P1_to_SDOs","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180175.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180176","title":"LS from RAN WG4: Reply LS on NR interworking with GSM and UMTS","source":"RAN WG4","contact":"Qiming Li","contact-id":61879,"tdoctype":"LS in","for":"Information","abstract":"RAN WG4 thanks RAN plenary for the LS on interworking mechanisms between 5G System and legacy RATs with actions to RAN WG4 that: To RAN WG4 Action: TSG RAN asks RAN WG4 to ensure that for EN-DC (Option 3), legacy EPS\/E-UTRA interworking with GSM\/UMTS is fully supported. To SA WG1, SA WG2, RAN WG2, RAN WG3, RAN WG4, RAN WG5, RAN WG6 Action: TSG RAN asks to take this RAN decision into account when considering interworking mechanisms between 5G System and legacy RATs, and update specifications accordingly if needed. Additionally, according to RAN #78 meeting chairman note RAN WG4 is also encouraged to provide feedback to RAN #79 in case this requires unreasonable work amount and in such a case RAN plenary has to take corresponding actions. In RAN WG4 AH-1801 RAN WG4 studied the feasibility and estimated the work load to support legacy EPS\/E-UTRA interworking with GSM\/UMTS in EN-DC operation, and reached the following agreement. Agreement: ? RAN WG4 confirms that legacy EPS\/E-UTRA interwor","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10470,"status":"noted","reservation_date":"2018-03-14 13:05:01","uploaded":"2018-03-14 13:35:15","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG RAN","Cc":"SA WG1, SA WG2, RAN WG2, RAN WG3, RAN WG4, RAN WG5, RAN WG6, TSG SA, TSG CT","lsoriginalls":"R4-1802691","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180176.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180177","title":"LS from SA WG2: Reply LS on V1 and V2 reference points","source":"SA WG2","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"LS in","for":"Action","abstract":"With respect to the 5GAA WG2 requests on provision PC5 parameters for V2X operations via V1 and V2 reference points in S2-181421, SA WG2 discussed and agreed that the following points need to be captured in TS 23.285:  1) The parameters for V2X communications over PC5 reference point may be also provisioned to the UE from the V2X Application Server via V1 reference point.  2) The parameters for V2X communications over PC5 reference point may be also provided to the V2X Control Function from the V2X Application Server via V2 reference point.  3) The parameters for V2X communications over PC5 reference point from V2X Control Function always takes precedence.  The related changes can be seen in the attached CR to TS 23.285 and this CR is submitted to SA#79 for approval.  SA WG2 kindly asks TSG SA to send 5GAA a reply LS in order to inform them regarding the approved CR to TS 23.285.  Action: SA WG2 kindly asks TSG SA to take the information above into account and to send 5GAA a reply LS i","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10500,"status":"noted","reservation_date":"2018-03-14 13:05:01","uploaded":"2018-03-14 13:35:15","revisionof":"","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"V2XARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"S2-182579","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180177.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180183","title":"[DRAFT] Reply LS on Establishment of SAE Cellular V2X Technical Committee and Associated Task Forces","source":"LG Electronics Mobile Research","contact":"Ki-Dong Lee","contact-id":58978,"tdoctype":"LS out","for":"Approval","abstract":"[DRAFT] Reply LS on Establishment of SAE Cellular V2X Technical Committee and Associated Task Forces, including some 3GPP-related information\/view on eV2X for them to consider;","secretary_remarks":"Revised to SP-180215.","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10550,"status":"revised","reservation_date":"2018-03-15 03:29:16","uploaded":"2018-03-15 15:10:57","revisionof":"","revisedto":"SP-180215","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SAE Cellular V2X Technical Committee","Cc":"SAE DSRC TC, NGMN Alliance V2X Task-Force, TSG RAN, SA WG1","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180183.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180189","title":"LS from GSMA: Statement on urgency of alignment of ETSI SSP with 3GPP Release 15","source":"GSMA","contact":"Ian Pannell","contact-id":45503,"tdoctype":"LS in","for":"Information","abstract":"Summary: The GSMA Technology Group wish to inform ETSI TC SCP and TSG SA that it is the collective view of the mobile operator community that the ETSI Smart Secure Platform (SSP) specification is not a prerequisite for 3GPP release 15, and therefore linkage between 3GPP release 15 and ETSI TC SSP is not necessary. SSP is not a prerequisite for operators to launch 5G network services. Smart Secure Platform (SSP) Specification: Operator members of the GSMA strongly believe that SSP can create value through increased and simplified usage of cellular communications and services, especially for the Internet of Things (IoT). However, the GSMA is concerned that insufficient time has been afforded to the process of understanding the impacts of SSP on all stakeholder groups to examine its potential and also identify challenges that need to be addressed. Therefore, it is recommended more time is taken to understand and resolve these challenges, in particular the issues around introduction of mul","secretary_remarks":"Revised, to corret recipients and editorial changes, to SP-180192","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10570,"status":"revised","reservation_date":"2018-03-16 06:33:20","uploaded":"2018-03-16 06:41:09","revisionof":"","revisedto":"SP-180192","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ETSI TC SCP, TSG SA","Cc":"","lsoriginalls":"TG Doc 07_022","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180189.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180192","title":"LS from GSMA: Statement on urgency of alignment of ETSI SSP with 3GPP Release 15","source":"GSMA","contact":"Ian Pannell","contact-id":45503,"tdoctype":"LS in","for":"Information","abstract":"Summary: The GSMA Technology Group wish to inform ETSI TC SCP and 3GPP that it is the collective view of the mobile operator community that the ETSI Smart Secure Platform (SSP) specification is not a prerequisite for 3GPP release 15, and therefore linkage between 3GPP release 15 and ETSI TC SSP is not necessary. SSP is not a prerequisite for operators to launch 5G network services. Smart Secure Platform (SSP) Specification: Operator members of the GSMA strongly believe that SSP can create value through increased and simplified usage of cellular communications and services, especially for the Internet of Things (IoT). However, the GSMA is concerned that insufficient time has been afforded to the process of understanding the impacts of SSP on all stakeholder groups to examine its potential and also identify challenges that need to be addressed. Therefore, it is recommended more time is taken to understand and resolve these challenges, in particular the issues around introduction of multi","secretary_remarks":"Revision of SP-180189. Response drafted in SP-180216. Final response in SP-180240","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10580,"status":"replied to","reservation_date":"2018-03-18 11:56:54","uploaded":"2018-03-18 11:57:32","revisionof":"SP-180189","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ETSI TC SCP, TSG SA, TSG CT, SA WG3, CT WG6","Cc":"","lsoriginalls":"TG Doc 07_022","lsreply":"SP-180240","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180192.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180200","title":"LS from NGMN: Liaison Statement from the NGMN Alliance to 3GPP on the 5G trials framework","source":"NGMN","contact":"Klaus Moschner","contact-id":59428,"tdoctype":"LS in","for":"Information","abstract":"NGMN 5G Work-Programme and the NGMN Trial and Testing Initiative with the Pre-Commercial Networks Trials phase: In February 2015 the NGMN Alliance published its 5G White Paper providing a consolidated view of the 5G requirements from operators. Subsequently in 2016, NGMN published a number of deliverables that detail the requirements and architecture as well as business principles, including views on the vertical industry applications. In June 2016, NGMN started a further extension of its 5G-focused work-programme with the launch of new additional work-items for the coming years: 5G Trial & Testing Initiative, End-to-end Architecture Framework, and the V2X Task-Force. The mission of the Trial and Test Initiative can be summarized as below: - Enable global collaboration of testing activities to support an efficient, successful, and in-time 5G technology and service introduction - Consolidate contributions and report on industry progress in order to ensure the development of globally ali","secretary_remarks":"Noted","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10420,"status":"noted","reservation_date":"2018-03-20 14:04:42","uploaded":"2018-03-20 14:06:11","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"3GPP","Cc":"-","lsoriginalls":"180320_Liaison Statement NGMN TTI PCNT TSG SA.","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180200.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180214","title":"Reply LS on V1 and V2 reference points","source":"TSG SA","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"LS out","for":"Approval","abstract":"To: 5GAA WG2. CC: SA WG2, SA WG6, TSG CT. Attachments: SP-180088 (TS 23.285 CR#0039)","secretary_remarks":"Revision of SP-180126. Revised to SP-180233.","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10530,"status":"revised","reservation_date":"2018-03-21 12:12:03","uploaded":"2018-03-22 12:27:55","revisionof":"SP-180126","revisedto":"SP-180233","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"V2XARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"5GAA WG2","Cc":"SA WG2, SA WG6, TSG CT","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180214.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180215","title":"Reply LS on Establishment of SAE Cellular V2X Technical Committee and Associated Task Forces","source":"TSG SA","contact":"Ki-Dong Lee","contact-id":58978,"tdoctype":"LS out","for":"Approval","abstract":"To: SAE C-V2X TC. CC: SAE DSRC TC, NGMN Alliance V2X Task-Force, TSG RAN, SA WG1, SA WG6","secretary_remarks":"Revision of SP-180183.. Approved","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10560,"status":"approved","reservation_date":"2018-03-21 12:12:03","uploaded":"2018-03-22 12:27:55","revisionof":"SP-180183","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SAE C-V2X TC","Cc":"SAE DSRC TC, NGMN Alliance V2X Task-Force, TSG RAN, SA WG1, SA WG6","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180215.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180216","title":"Reply LS on Statement on urgency of alignment of ETSI SSP with 3GPP Release 15","source":"TSG SA","contact":"David Hutton","contact-id":33294,"tdoctype":"LS out","for":"Approval","abstract":"To: GSMA Technology Group, SA WG3. CC: ETSI TC SCP, TSG CT, CT WG6. Attachment: SP-180056","secretary_remarks":"Created at meeting. Response to SP-180192. Revised to SP-180232.","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10590,"status":"revised","reservation_date":"2018-03-21 12:12:03","uploaded":"2018-03-22 12:27:55","revisionof":"","revisedto":"SP-180232","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GSMA Technology Group, SA WG3","Cc":"ETSI TC SCP, TSG CT, CT WG6","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180216.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180232","title":"Reply LS on Statement on urgency of alignment of ETSI SSP with 3GPP Release 15","source":"TSG SA","contact":"David Hutton","contact-id":33294,"tdoctype":"LS out","for":"Approval","abstract":"To: GSMA Technology Group, SA WG3. CC: ETSI TC SCP, TSG CT, CT WG6. Attachment: SP-180056","secretary_remarks":"Revision of SP-180216. Revised to SP-180240.","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10600,"status":"revised","reservation_date":"2018-03-23 02:47:29","uploaded":"2018-03-23 07:37:54","revisionof":"SP-180216","revisedto":"SP-180240","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"GSMA Technology Group, SA WG3","Cc":"ETSI TC SCP, TSG CT, CT WG6","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180232.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180233","title":"Reply LS on V1 and V2 reference points","source":"TSG SA","contact":"Laeyoung Kim","contact-id":40613,"tdoctype":"LS out","for":"Approval","abstract":"To: 5GAA WG2. CC: SA WG2, SA WG6, TSG CT. Attachments: SP-180088 (TS 23.285 CR#0039)","secretary_remarks":"Revision of SP-180214.. Approved","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10540,"status":"approved","reservation_date":"2018-03-23 02:47:29","uploaded":"2018-03-23 07:37:54","revisionof":"SP-180214","revisedto":"","release":"Rel-14","crspec":"","crspecversion":"","workitem":[{"winame":"V2XARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SP-180003","lsto":"5GAA WG2","Cc":"SA WG2, SA WG6, TSG CT","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180233.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-180240","title":"Reply LS on Statement on urgency of alignment of ETSI SSP with 3GPP Release 15","source":"TSG SA","contact":"David Hutton","contact-id":33294,"tdoctype":"LS out","for":"Approval","abstract":"To: GSMA Technology Group, SA WG3. CC: ETSI TC SCP, TSG CT, CT WG6. Attachment: SP-180056","secretary_remarks":"Revision of SP-180232. Approved","agenda_item_sort_order":9,"ainumber":"6","ainame":"General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item)","tdoc_agenda_sort_order":10610,"status":"approved","reservation_date":"2018-03-23 07:25:12","uploaded":"2018-03-23 07:37:54","revisionof":"SP-180232","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"SP-180192","lsto":"GSMA Technology Group, SA WG3","Cc":"ETSI TC SCP, TSG CT, CT WG6","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180240.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]