[{"name":"R4-167256","title":"MIB acquisition delay simulation results for eMTC RRM","source":"Intel Corporation","contact":"Yang Tang","contact-id":56725,"tdoctype":"other","for":"Discussion","abstract":"Abstract: \nProposal 1: MIB acquisition delay = 40ms where window length=1 can satisfy the SNR=-6dB threshold in CE mode A EPA1 and ETU1 channel.\nProposal 2: MIB acquisition delay = 690ms where window length=17 can satisfy the SNR=-15dB threshold in CE m","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":7274000,"status":"noted","reservation_date":"2016-09-29 00:59:10","uploaded":"2016-09-30 22:34:59","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-167256.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-167274","title":"On handover intereruption time for eMTC","source":"Intel Corporation","contact":"Yang Tang","contact-id":56725,"tdoctype":"discussion","for":"Discussion","abstract":"Observation 1: Based on the above, it is our understanding that the Category M1 UE is required to obtain the MIB prior to performing RACH to the target cell.\nObservation 2: Tinterrupt for CE Mode A FD-FDD, HD-FDD, and TDD cases is not consistent with the","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":7807000,"status":"noted","reservation_date":"2016-09-29 00:59:10","uploaded":"2016-09-30 22:35:00","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-167274.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-167807","title":"Discussion on SI reading in CEModeB","source":"Huawei, HiSilicon","contact":"Xiang (Steven) Chen","contact-id":41576,"tdoctype":"discussion","for":"","abstract":"---","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8061000,"status":"noted","reservation_date":"2016-09-29 14:40:49","uploaded":"2016-09-30 18:52:56","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-167807.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-167833","title":"MIB acquisition delay for eMTC","source":"Ericsson","contact":"Santhan Thangarasa","contact-id":59137,"tdoctype":"other","for":"Discussion","abstract":"MIB acqusition delay requirement for eMTC","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8063000,"status":"noted","reservation_date":"2016-09-29 14:41:33","uploaded":"2016-09-30 19:40:37","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-167833.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168061","title":"eMTC MIB acquisition delay","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Ren Da","contact-id":45542,"tdoctype":"discussion","for":"Discussion","abstract":"---","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8062000,"status":"noted","reservation_date":"2016-09-29 20:22:22","uploaded":"2016-09-30 16:57:34","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":[{"winame":"LTE_MTCe2_L1"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168061.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168062","title":"CR: Cat-M1 Intra-frequency Handover Requirements for CEModeB","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Ren Da","contact-id":45542,"tdoctype":"CR","for":"Approval","abstract":"---","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8133000,"status":"noted","reservation_date":"2016-09-29 20:22:22","uploaded":"2016-09-30 16:57:34","revisionof":"","revisedto":"","release":"Rel-13","crspec":"36.133","crspecversion":"13.5.0","workitem":[{"winame":"LTE_MTCe2_L1"}],"crnumber":4080.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168062.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168063","title":"CR: Cat-M1 Intra-frequency Handover Requirements for CEModeB","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Ren Da","contact-id":45542,"tdoctype":"CR","for":"Approval","abstract":"---","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8134000,"status":"withdrawn","reservation_date":"2016-09-29 20:22:22","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-14","crspec":"36.133","crspecversion":"14.1.0","workitem":[{"winame":"LTE_MTCe2_L1"}],"crnumber":4081.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168128","title":"Modification to Handover Delay in CE ModeA","source":"Qualcomm Incorporated","contact":"Achaleshwar Sahai","contact-id":63246,"tdoctype":"CR","for":"Approval","abstract":"MIB acquistion delay needs to be taken into account at the time of Handover because SFN is not necessarily provided Handover Messsage and SFN is necessary for determining RACH resources in Rel-13 eMTC.\nT_MIB is added to T_interrupt.","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8128010,"status":"revised","reservation_date":"2016-09-29 23:46:12","uploaded":"2016-09-30 21:19:56","revisionof":"","revisedto":"R4-168649","release":"Rel-13","crspec":"36.133","crspecversion":"13.5.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4103.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168128.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168129","title":"Modification to Handover Delay in CE ModeA","source":"Qualcomm Incorporated","contact":"Achaleshwar Sahai","contact-id":63246,"tdoctype":"CR","for":"Approval","abstract":"MIB acquistion delay needs to be taken into account at the time of Handover because SFN is not necessarily provided Handover Messsage and SFN is necessary for determining RACH resources in Rel-13 eMTC.\nT_MIB is added to T_interrupt.","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8132000,"status":"revised","reservation_date":"2016-09-29 23:46:12","uploaded":"2016-10-18 10:27:28","revisionof":"","revisedto":"R4-1610415","release":"Rel-14","crspec":"36.133","crspecversion":"14.1.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4104.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168129.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168132","title":"Simulation results and discussion for MIB acquisition delay in eMTC","source":"Qualcomm Incorporated","contact":"Achaleshwar Sahai","contact-id":63246,"tdoctype":"discussion","for":"Approval","abstract":"---","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":7833000,"status":"noted","reservation_date":"2016-09-29 23:46:12","uploaded":"2016-09-30 21:19:56","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168132.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168133","title":"Modification to Handover Delay in CE ModeB","source":"Qualcomm Incorporated","contact":"Achaleshwar Sahai","contact-id":63246,"tdoctype":"CR","for":"Approval","abstract":"MIB acquistion delay needs to be taken into account at the time of Handover because SFN is not necessarily provided Handover Messsage and SFN is necessary for determining RACH resources in Rel-13 eMTC.\nT_MIB is added to T_interrupt.","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8565000,"status":"revised","reservation_date":"2016-09-29 23:46:12","uploaded":"2016-09-30 21:19:56","revisionof":"","revisedto":"R4-168712","release":"Rel-13","crspec":"36.133","crspecversion":"13.5.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4107.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168133.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168134","title":"Modification to Handover Delay in CE ModeB","source":"Qualcomm Incorporated","contact":"Achaleshwar Sahai","contact-id":63246,"tdoctype":"CR","for":"Approval","abstract":"MIB acquistion delay needs to be taken into account at the time of Handover because SFN is not necessarily provided Handover Messsage and SFN is necessary for determining RACH resources in Rel-13 eMTC.\nT_MIB is added to T_interrupt.","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8566000,"status":"revised","reservation_date":"2016-09-29 23:46:12","uploaded":"2016-10-18 10:27:28","revisionof":"","revisedto":"R4-1610416","release":"Rel-14","crspec":"36.133","crspecversion":"14.1.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4108.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168134.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168565","title":"Handover and RRC Re-establishment requirements for eMTC CEModeB","source":"Ericsson","contact":"Muhammad Kazmi","contact-id":31117,"tdoctype":"discussion","for":"Discussion","abstract":"This paper analysis eMTC handover requirements in CEModeB","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8128000,"status":"noted","reservation_date":"2016-09-30 18:30:34","uploaded":"2016-09-30 19:37:37","revisionof":"","revisedto":"","release":"Rel-13","crspec":"","crspecversion":"","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168565.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168566","title":"Correction to handover requirements in eMTC","source":"Ericsson","contact":"Muhammad Kazmi","contact-id":31117,"tdoctype":"CR","for":"Approval","abstract":"This CR updates eMTC handover requirements in CEModeB","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8567000,"status":"noted","reservation_date":"2016-09-30 18:30:34","uploaded":"2016-09-30 19:37:37","revisionof":"","revisedto":"","release":"Rel-13","crspec":"36.133","crspecversion":"13.5.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4145.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168566.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168567","title":"Correction to handover requirements in eMTC","source":"Ericsson","contact":"Muhammad Kazmi","contact-id":31117,"tdoctype":"CR","for":"Approval","abstract":"This CR updates eMTC handover requirements in CEModeB","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8648000,"status":"withdrawn","reservation_date":"2016-09-30 18:30:34","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-14","crspec":"36.133","crspecversion":"14.1.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4146.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168648","title":"Summary of simulation results for MIB acquistion","source":"Intel","contact":"Juha Korhonen","contact-id":21609,"tdoctype":"other","for":"Discussion","abstract":"This contribution provides the way forward on XXX","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":7256000,"status":"noted","reservation_date":"2016-10-19 13:27:22","uploaded":"2016-10-19 13:37:27","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168648.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168649","title":"Modification to Handover Delay in CE ModeA","source":"Qualcomm Incorporated","contact":"Juha Korhonen","contact-id":21609,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8129000,"status":"revised","reservation_date":"2016-10-19 13:27:22","uploaded":"2016-10-19 13:37:27","revisionof":"R4-168128","revisedto":"R4-1610417","release":"Rel-13","crspec":"36.133","crspecversion":"13.5.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4103.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168649.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168712","title":"Modification to Handover Delay in CE ModeB","source":"Qualcomm Incorporated","contact":"Juha Korhonen","contact-id":21609,"tdoctype":"CR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":8565001,"status":"agreed","reservation_date":"2016-10-19 13:27:51","uploaded":"2016-10-19 13:37:28","revisionof":"R4-168133","revisedto":"","release":"Rel-13","crspec":"36.133","crspecversion":"13.5.0","workitem":[{"winame":"LTE_MTCe2_L1-Core"}],"crnumber":4107.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-162431","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168712.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-168971","title":"WF on MIB acquisition delay","source":"Qualcomm","contact":"Juha Korhonen","contact-id":21609,"tdoctype":"discussion","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"5.5.3.1","ainame":"Handover requirement (MIB acquisition)[LTE_MTCe2_L1-Core]","tdoc_agenda_sort_order":897100,"status":"approved","reservation_date":"2016-10-19 13:29:09","uploaded":"2016-10-19 13:37:29","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_80Bis\/Docs\/R4-168971.zip","group":"R4","meeting":"R4-80","year":2016,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]