[{"name":"SP-220379","title":"LS from TSG CT: LS on Priority given to Rel-17 LSs from CT","source":"TSG CT","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Information","abstract":"At CT#96, WI exceptions have been granted for Rel-17 WIs not completed yet. The target is to complete the Stage 3 work for CT#97 (Sept 2022). However, for some of these WIs, the stage 3 progress is dependent on required stage 2 clarifications and CT WGs are waiting for answers to LSs sent to SA WG2, SA WG4 and RAN WG2 in order to be able to complete the remaining work. In the next plenary cycle, CT WGs and SA WG2\/SA WG4\/RAN WG2 will have only one e-meeting and all these meetings will be held on the same dates in August. As CT WGs cannot wait for the end of the other working group meeting to receive the expected reply LSs, SA WG2\/SA WG4\/RAN WG2 are kindly asked to address in priority the Release 17 related LSs received from CT WGs at the beginning of their meeting and to provide CT WGs with the required clarifications as early as possible. This will let a chance to CT WGs to complete their stage 3 work before the end of their respective meeting.","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10490,"status":"noted","reservation_date":"2022-05-23 12:09:52","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"SA WG2, SA WG4, RAN WG2","Cc":"TSG SA, TSG RAN","lsoriginalls":"CP-221319","lsreply":"","link":"","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-220380","title":"LS from TSG CT: LS on CT specification on Control Plane based security procedures for 5G ProSe UE-to-network relay","source":"TSG CT","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"Regarding Control Plane based authentication\/authorization and PDU Session secondary authentication for 5G ProSe UE-to-Network Relay, the following is the update from CT#96:. {. . .} - 'how the UE determines whether to use UP based or CP based security procedure for 5G ProSe UE-to-Network Relay' is still open and listed as one uncompleted task in the CT WG1 5G_ProSe exception sheet (CP-221181). - based on the latest decision in SA WG3#107-e meeting, 5G_ProSe CT WID has been further revised to add a new TS for defining 5G ProSe Anchor Function (PAnF) service to support Control Plane based security procedure for 5G ProSe UE-to-Network Relay, and this is also listed as the only uncompleted task in the CT WG4 5G_ProSe exception sheet (CP-221086). CT has approved the CT WG1 and CT WG4 CRs related to Control Plane based authentication and Secondary Authentication\/Authorization for UE-to-Network Relay listed above, which are presently aligned with the Stage 2 work in SA WG3, and other CRs are expected in the next plenary cycle to complete the work. Should SA decide not to pursue these features in Rel-17, CT WG1 and CT WG4 would align their specifications at the August 2022 WG meetings. Action: CT kindly asks SA to take into account the above information and to inform CT and CT WGs should Control Plane based authentication and\/or Secondary Authentication\/Authorization for UE-to-Network Relay functionality not be pursued in Rel-17.","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10500,"status":"noted","reservation_date":"2022-05-23 12:09:52","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"SA WG2, SA WG3, CT WG1, CT WG3, CT WG4, CT WG6","lsoriginalls":"CP-221322","lsreply":"","link":"","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-220381","title":"LS from TSG CT: LS on allowing sufficient time for stage 3 work","source":"TSG CT","contact":"Maurice Pope","contact-id":648,"tdoctype":"LS in","for":"Action","abstract":"For the past couple of releases, a duration of 9 months between the stage 2 freeze date in SA WGs and the stage 3 freeze date in CT WGs has been strictly enforced during release schedule planning. This has in most cases worked well for the stage 2 requirements coming from SA WG2 and SA WG6, since 9 months generally allow sufficient time for CT WGs to specify the stage 3 and liaise with SA WG2 and SA WG6 for aspects which need clarification (even when multiple round-trips of LSs are required to reach a conclusion), although occasionally some SA WG2 or SA WG6 stage 2 requirements do get specified after the stage 2 freeze date. However, there has been more frequent occurences of stage 2 requirements coming from SA WG3, SA WG4 or SA WG5 very late, which puts CT WGs under significant stress to try and meet the stage 3 freeze date. In several cases, the stage 2 requirements even came after the Rel-17 stage 3 freeze date of March 2022 (for instance for the EVEX WI, the 5G_ProSe WI and the eNPN WI). CT believes that this stems from the fact that SA WG2 and SA WG6 are stage 2-only groups, while SA WG3, SA WG4 and SA WG5 produce both stage 2 and stage 3 specifications. As a result, SA WG2 and SA WG6 work toward a single deadline (the stage 2 freeze date) whereas many of the WIDs in SA WG3, SA WG4 and SA WG5 are approved with a target completion date set to the stage 3 freeze date. In other words, there is not enough visibility in the planning of the work into exactly when the stage 2 portion of it needs to be completed. CT would like SA to discuss possible solutions to this issue to ensure that stage 2 requirements which will have stage 3 impacts in CT WGs are made available in a timely manner. Action: CT kindly asks SA to discuss possible ways to improve work management to ensure timely completion of stage 2 work which has stage 3 impacts in CT WGs","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10510,"status":"noted","reservation_date":"2022-05-23 12:09:52","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"TSG RAN","lsoriginalls":"CP-221324","lsreply":"","link":"","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-220669","title":"IETF Status report","source":"TSG CT Chair","contact":"Lionel Morand","contact-id":25150,"tdoctype":"report","for":"Presentation","abstract":"IETF Status report","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10530,"status":"noted","reservation_date":"2022-06-08 12:48:51","uploaded":null,"revisionof":"","revisedto":"SP-220710","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-220670","title":"Draft report of TSG CT#96","source":"TSG CT Secretary (MCC)","contact":"Kimmo Kymalainen","contact-id":85426,"tdoctype":"report","for":"Information","abstract":"Draft report of TSG CT#96","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10540,"status":"noted","reservation_date":"2022-06-08 12:48:51","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-220671","title":"Status report of TSG CT#96","source":"TSG CT Chair","contact":"Lionel Morand","contact-id":25150,"tdoctype":"report","for":"Presentation","abstract":"Status report of TSG CT#96","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10520,"status":"noted","reservation_date":"2022-06-08 12:48:51","uploaded":null,"revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-220694","title":"OpenAPI specs management: Current status","source":"TSG CT Chair","contact":"Lionel Morand","contact-id":25150,"tdoctype":"report","for":"Presentation","abstract":"OpenAPI specs management status report","secretary_remarks":"Noted","agenda_item_sort_order":26,"ainumber":"4.8","ainame":"TSG CT reporting","tdoc_agenda_sort_order":10550,"status":"noted","reservation_date":"2022-06-09 09:35:23","uploaded":"2022-06-09 11:37:31","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_96_Budapest_2022_06\/Docs\/SP-220694.zip","group":"SP","meeting":"SP-96","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]