[{"name":"SP-200917","title":"DRAFT Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 5 of Rec. ITU-R M.2012, 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)'","source":"TSG RAN","contact":"Magnus Stattin","contact-id":35800,"tdoctype":"LS in","for":"Action","abstract":"This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: February 15th, 2021 (16:00 hours UTC) way to make this document available for ITU (see Art.51 of 3GPP working procedures): [v] a. via OPs as a deliverable from their organizations (for PCG review only) [ ] b. via Individual Members (for PCG or TSG review) coordinated by ITU sector convener [ ] c. via 3GPP LS coordinator (for TSG or WG review)","secretary_remarks":"For 3GPP review: in: TSG SA feedback LS before: December 11, 2020 to: PCG. CC#4: Endorsed and will be forwarded to the PCG","agenda_item_sort_order":25,"ainumber":"4.7","ainame":"TSG RAN reporting and RAN ITU-R Ad Hoc Matters (will be handled on Monday 14 December in separate call)","tdoc_agenda_sort_order":10410,"status":"endorsed","reservation_date":"2020-11-26 08:38:01","uploaded":"2020-12-10 12:08:58","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"TSG SA","Cc":"","lsoriginalls":"RP-202861","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGs_90E_Electronic\/Docs\/SP-200917.zip","group":"SP","meeting":"SP-90-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-200918","title":"LS from TSG RAN: Reply LS to ITU-R WP4B on the integration of satellite solutions into 5G networks","source":"TSG RAN","contact":"Munira Jaffar","contact-id":77683,"tdoctype":"LS in","for":"Information","abstract":"TSG RAN would like to thank ITU-R Working Party 4B for the incoming liaison (LS in) RP-202150 [1], requesting updates on the progress of activities pertaining to solutions for 5G NR to support Non-Terrestrial Networks including satellite. In relation to the above, TSG RAN took two decisions during its RAN#86 Plenary in December 2019: - Approval of the TR 38.821'Solutions for NR to support non-terrestrial networks (NTN)' [2] which concluded the study phase on the subject. - Approval of a new Work Item on 'Solutions for NR to support non-terrestrial networks (NTN)' [3] as part of the Release 17 which corresponds to the normative phase. This Work Item, which is currently on-going in Release 17, is to develop technical specifications to support transparent payload based NGSO & GEO scenarios addressing UE with GNSS capability. This normative phase is expected to contribute to the integration of satellite\/NTN in the 3GPP specifications.","secretary_remarks":"CC#4: This LS was noted.","agenda_item_sort_order":25,"ainumber":"4.7","ainame":"TSG RAN reporting and RAN ITU-R Ad Hoc Matters (will be handled on Monday 14 December in separate call)","tdoc_agenda_sort_order":10420,"status":"noted","reservation_date":"2020-11-26 08:38:01","uploaded":"2020-12-10 12:08:58","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"ITU-R WP4B.","Cc":"TSG SA","lsoriginalls":"RP-202862","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGs_90E_Electronic\/Docs\/SP-200918.zip","group":"SP","meeting":"SP-90-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"SP-201126","title":"Status Report of TSG RAN#90-e","source":"TSG RAN Chair","contact":"Balazs Bertenyi","contact-id":23377,"tdoctype":"report","for":"Presentation","abstract":"Chairmans Report of TSG RAN#90-e.","secretary_remarks":"CC#5: Noted","agenda_item_sort_order":25,"ainumber":"4.7","ainame":"TSG RAN reporting and RAN ITU-R Ad Hoc Matters (will be handled on Monday 14 December in separate call)","tdoc_agenda_sort_order":10430,"status":"noted","reservation_date":"2020-12-13 08:26:38","uploaded":"2020-12-14 12:59:16","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGs_90E_Electronic\/Docs\/SP-201126.zip","group":"SP","meeting":"SP-90-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]