[{"name":"R4-2014237","title":"Discussion on RRC based BWP switch for Scell","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"discussion","for":"Discussion","abstract":"Observation #1: RRC based BWP switch by RRC re-configuration of firstActiveUplinkBWP-Id is not allowed for Scell.\n\nProposal #1: Update applicability of current RRC based BWP switch to only PCell or PScell.\n\nProposal #2: Discuss further on how to extend RRC based switching delay requirement to be applicable to SCell\n\nProposal#3: Send LS to RAN2 to clarify how RRC based BWP switch can be applicable to SCell.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3030,"status":"noted","reservation_date":"2020-10-21 14:01:42","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014237.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014238","title":"CR on Applicability of RRC based BWP switch requirements - Rel15","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"RRC based BWP switch is not allowed for SCell with change to firstActiveDownlinkBWP-Id via RRC configuration. The current requirements for RRC based TCI state switch are only applicable to PCell and PScell. We need to capture that current requirements are only applicable to PCell and PSCell. More details are captured in R4-2014237.\nRemove Editor\u2019s note.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3040,"status":"merged","reservation_date":"2020-10-21 14:01:42","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1141.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014238.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014239","title":"CR on Applicability of RRC based BWP switch requirements - Rel16","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3050,"status":"withdrawn","reservation_date":"2020-10-21 14:01:43","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1142.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014268","title":"CR on CSI-RS BW condition for BFD\/CBD R15","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"In Previous RAN4 discussion, the CSI-RS based CBD\/BFD requirement applies when CSI-RS BW=24 PRBs, however, this side condition has not been captured explicitly in the TS38.133. Some companies thought it\u2019s not necessary to capture this condition because the minimum configurable BW for CSI-RS BW is 24PRBs. However, it\u2019s not correct since RAN2 has clarification in the CSI-RS configuration IE, as duplicated below,\nRAN2 agreed that if the configured CSI-RS BW is larger than UE corresponding BWP size, UE shall assume the actual CSI-RS BW is same as the width of the that BWP; here the \u201ccorresponding BWP\u201d in CBD\/BFD scenario is the active BWP.\nBased on the above defintion, if we don\u2019t specify it explicitly in the spec, it would mislead engineers to assume that CSI-RS BW can be smaller than 24PRB for BFD\/CBD requirement in case the UE active BWP size is smaller than 24 PRBs. We need to solve this ambiguity in the spec.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3060,"status":"revised","reservation_date":"2020-10-21 15:08:24","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"R4-2017037","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1145.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014268.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014269","title":"CR on CSI-RS BW condition for BFD\/CBD R16","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3080,"status":"agreed","reservation_date":"2020-10-21 15:08:26","uploaded":"2020-11-16 17:32:54","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1146.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202444","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014269.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014270","title":"On AP-CSI-RS based L1-RSRP measurement","source":"Apple, Huawei, HiSilicon","contact":"Tang Yang","contact-id":83979,"tdoctype":"discussion","for":"Discussion","abstract":"Proposal 1: AP CSI-RS based L1-RSRP measurement shall not be performed within MG duration. But outside MG, if this AP CSI-RS for L1-RSRP measurement is overlapped with L3 RRM measurement RS, the AP CSI-RS based L1-RSRP measurement shall be prioritized.  \n\nProposal 2: \n-\tin TS38.133, RAN4 clarifies that scaling factor P=1 for AP CSI-RS based L1-RSRP measurement outside MG regardless of whether this AP CSI-RS is overlapped with L3 measurement RS or not.\n-\tin TS38.133, RAN4 clarifies that longer SSB based L3 measurement period would be expected if SSB symbols for L3 measurement are colliding with AP CSI-RS for L1-RSRP.\n-\tin TS38.133, RAN4 clarifies that AP CSI-RS based L1-RSRP measurement requirement is not applied for the case that AP CSI-RS is overlapped with MG.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3090,"status":"noted","reservation_date":"2020-10-21 15:08:27","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014270.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014271","title":"CR on AP-CSI-RS based L1-RSRP measurement R15","source":"Apple, Huawei, HiSilicon","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"The AP CSI-RS based L1-RSRP measurement delay requirement is not accurate, as discussed in R4-2014270.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3100,"status":"revised","reservation_date":"2020-10-21 15:08:27","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"R4-2017038","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1147.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014271.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014272","title":"CR on AP-CSI-RS based L1-RSRP measurement R16","source":"Apple, Huawei, HiSilicon","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3120,"status":"agreed","reservation_date":"2020-10-21 15:08:28","uploaded":"2020-11-16 17:32:54","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1148.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202444","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014272.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014273","title":"On CSSF for R15 EN-DC","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"discussion","for":"Discussion","abstract":"Proposal 1: the NR inter-RAT MO on NR serving CC configured by LTE MN shall be captured into CSSF outside MG:\n\nProposal 2: RAN4 CSSF outside MG design uses option 3, i.e., in EN-DC the CSSF without MG is determined by the number of MOs without MG configured from both LTE MN and NR SN, and if any two MOs from LTE MN and NR SN meet MO merging rule, they shall be counted as one single MO in MO number counting.\n\nProposal 3: the CSSF outside MG shall be updated as in this contribution.\n\nProposal 4: the NR inter-RAT MO configured by LTE MN shall be further divided into following types for CSSF inside MG,\n\nProposal 5: RAN4 CSSF inside MG design uses option 3, i.e., Mtot,i,j = Mintra,i,j + Minter,i,j : Total number of intra-frequency, inter-frequency and inter-RAT measurement objects which are candidates to be measured in gap j where the measurement object i is also a candidate. If any two MOs from LTE MN and NR SN meet MO merging rule, they shall be counted as one single MO in MO number counting. Otherwise Mtot,i,j equals 0.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3130,"status":"noted","reservation_date":"2020-10-21 15:08:29","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014273.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014274","title":"CR on CSSF for R15 EN-DC","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"The CSSF design for EN-DC shall consider the MOs configured from both LTE MN and NR SN in EN-DC.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3140,"status":"merged","reservation_date":"2020-10-21 15:08:29","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1149.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014274.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014565","title":"Discussion of RRC based BWP switching on single CC","source":"Intel Corporation","contact":"Andrey Chervyakov","contact-id":47232,"tdoctype":"discussion","for":"Discussion","abstract":"Proposal 1: Current single RRC based BWP switch delay requirement in Rel-15 is only applied for PCell or PScell.\n\nProposal 2: RRC based single BWP switch delay for SCell needs more discussion.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3150,"status":"noted","reservation_date":"2020-10-22 20:03:03","uploaded":"2020-10-23 23:26:03","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014565.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014693","title":"CR on carrier frequency range of PCell\/PSCell for the maximum number of RLM-RS resources","source":"CMCC","contact":"jingjing chen","contact-id":59689,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3160,"status":"agreed","reservation_date":"2020-10-23 02:38:46","uploaded":"2020-10-23 09:21:20","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1195.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014693.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014694","title":"CR on carrier frequency range of PCell\/PSCell for the maximum number of RLM-RS resources","source":"CMCC","contact":"jingjing chen","contact-id":59689,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3170,"status":"agreed","reservation_date":"2020-10-23 02:38:47","uploaded":"2020-11-16 17:32:54","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1196.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014694.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014760","title":"Remaining issues on RRM in R15","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"discussion","for":"Discussion","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3180,"status":"noted","reservation_date":"2020-10-23 03:26:37","uploaded":"2020-10-23 09:26:23","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014760.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014761","title":"CR on active BWP switch in R15","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"RRC-based BWP switch cannot apply for SCell.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3190,"status":"merged","reservation_date":"2020-10-23 03:26:37","uploaded":"2020-10-23 09:26:23","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1197.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014761.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014762","title":"CR on active BWP switch in R16","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"RRC-based BWP switch cannot apply for SCell.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3200,"status":"merged","reservation_date":"2020-10-23 03:26:38","uploaded":"2020-10-23 09:26:23","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1198.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014762.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014763","title":"CR on active TCI state switching delay in R15","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"On 8.10.3,\nThe requirement doesn\u2019t specify for L1-RSRP measurement once NW configures both SSB and CSI-RS for measurement.\nOn 8.10.6,\nFor active TCI state list update, TOk is redundant and equals to 1, because the new target TCI state should not be in the old active TCI state list. Otherwise, this update is not necessary.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3210,"status":"postponed","reservation_date":"2020-10-23 03:26:39","uploaded":"2020-10-23 09:26:24","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1199.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014763.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014764","title":"CR on active TCI state switching delay in R16","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"On 8.10.3,\nThe requirement doesn\u2019t specify for L1-RSRP measurement once NW configures both SSB and CSI-RS for measurement.\nOn 8.10.6,\nFor active TCI state list update, TOk is redundant and equals to 1, because the new target TCI state should not be in the old active TCI state list. Otherwise, this update is not necessary.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3220,"status":"withdrawn","reservation_date":"2020-10-23 03:26:40","uploaded":"2020-10-23 09:26:24","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1200.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014764.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014765","title":"CR on MO merge in R15","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"When both MN and SN configures MOs and the configured NR frequency layers shall be counted only once, UE will be confused on the Klayer1_measurement with different SSB-ToMeasure indications.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3230,"status":"revised","reservation_date":"2020-10-23 03:26:40","uploaded":"2020-10-23 09:26:24","revisionof":"","revisedto":"R4-2017336","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1201.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014765.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2014766","title":"CR on MO merge in R16","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"When both MN and SN configures MOs and the configured NR frequency layers shall be counted only once, UE will be confused on the Klayer1_measurement with different SSB-ToMeasure indications.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3250,"status":"withdrawn","reservation_date":"2020-10-23 03:26:41","uploaded":"2020-10-23 09:26:24","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1202.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2014766.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015159","title":"Addition of symbol definitions","source":"Ericsson","contact":"Christopher Callender","contact-id":58614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3270,"status":"agreed","reservation_date":"2020-10-23 08:47:05","uploaded":"2020-10-23 14:09:42","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1231.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015159.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015160","title":"Addition of symbol definitions","source":"Ericsson","contact":"Christopher Callender","contact-id":58614,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3280,"status":"agreed","reservation_date":"2020-10-23 08:47:06","uploaded":"2020-11-16 17:51:13","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1232.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015160.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015208","title":"CR on BWP switch","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3290,"status":"withdrawn","reservation_date":"2020-10-23 09:40:34","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1248.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015209","title":"CR on TCI state","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3300,"status":"withdrawn","reservation_date":"2020-10-23 09:40:35","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1249.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015210","title":"CR on MO merge","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3260,"status":"agreed","reservation_date":"2020-10-23 09:40:36","uploaded":"2020-11-16 17:51:13","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1250.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015210.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015300","title":"CR to TS 38.133 on DCI based BWP switch requirements applicability","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"DCI based BWP switch requirements are not applicable for DCI received through cross-carrier scheduling. This is not reflected in current specification.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3310,"status":"revised","reservation_date":"2020-10-23 10:24:24","uploaded":"2020-10-23 13:32:16","revisionof":"","revisedto":"R4-2017335","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1251.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015300.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015306","title":"CR to TS 38.133 on clarification of applicability of SCell activation requirements for  unknown FR1 cell","source":"NEC","contact":"Tetsu Ikeda","contact-id":58067,"tdoctype":"CR","for":"Agreement","abstract":"Applicability of SCell activation requirements for unknown FR1 cell are not clear in the specification as time for L1-RSRP measurement and report is NOT included in SCell activation requirements","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3330,"status":"merged","reservation_date":"2020-10-23 10:24:27","uploaded":"2020-10-23 13:32:15","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1253.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015306.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015445","title":"Correction to CSSF calculation R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"In TS 36.133 clause 8.17.4.1 it is specified that the when UE is configured with EN-DC the intra-RAT NR measurement on NR serving carrier should obey requirements for NR intra-frequency measurements. On the other hand. Intra-frequency measurement shall be performed without MG if SSB is completely contained by active BWP. As a result, it implies that intra-RAT measurement on NR serving carrier shall also be performed without MG in some cases.\nHowever, It conflicts with the calculation of CSSFoutside_gap given in 38.133. cl. 9.1.5.1. One can observe that in RAN4\u2019s understanding only intra-frequency meansurements are considered in CSSFoutside_gap in Rel-15. Then UE don\u2019t know how to calculate CSSF for inter-RAT NR measurments on serving carriers. Measurement delay requirement for inter-RAT measurement on serving carrier is unclear.\nThe carrier-specific scaling factor CSSFoutside_gap,i for measurement object i derived in this chapter is applied to following measurement types:\n-Intra-frequency measurement with no measurement gap in clause 9.2.5, when none of the SMTC occasions of this intra-frequency measurement object are overlapped by the measurement gap.\n-Intra-frequency measurement with no measurement gap in clause 9.2.5, when part of the SMTC occasions of this intra-frequency measurement object are overlapped by the measurement gap.\nUE is expected to conduct the measurement of this measurement object i only outside the measurement gaps.\nFor UE configured with the E-UTRA-NR dual connectivity operation, the carrier-specific scaling factor CSSFoutside_gap,i for intra-frequency SSB-based measurements performed outside measurements gaps will be as specified in Table 9.1.5.1.1-1.\nTable 9.1.5.1.1-1: CSSFoutside_gap,i scaling factor for EN-DC mode\nScenario\nCSSFoutside_gap,i for FR1 PSCC\nCSSFoutside_gap,i for FR1 SCC\nCSSFoutside_gap,i for FR2 PSCC\nCSSFoutside_gap,i for FR2 SCC where neighbour cell measurement is required Note 2\nCSSFoutside_gap,i for FR2 SCC where neighbour cell measurement is not required\nEN-DC with FR1 only CA\n1\nNumber of configured FR1 SCell(s)\nN\/A\nN\/A\nN\/A\nEN-DC with\nFR2 only intra band CA\nN\/A\nN\/A\n1\nN\/A\nNumber of configured FR2 SCells\nEN-DC with\nFR1 +FR2 CA (FR1 PSCell) Note 1\n1\n2\u00d7(Number of configured SCell(s)-1)\nN\/A\n2\n2\u00d7(Number of configured SCell(s)-1)\nEN-DC with\nFR1 +FR2 CA (FR2 PSCell) Note 1\nN\/A\nNumber of configured SCell(s)\n1\nN\/A\nNumber of configured SCell(s)\nNote 1:Only one NR FR1 operating band and one NR FR2 operating band are included for FR1+FR2 inter-band EN-DC.\nNote 2:Selection of FR2 SCC where neighbour cell measurement is required follows clause 9.2.3.2.\nSo we purpose to take inter-RAT measurement on serving carrier into account in the calculation of CSSFoutside_gap. To be more specific, the baseline assumption for CSSFoutside_gap calculation is changed to:\nUE equips two searchers;\nOne searcher is dedicated for intra-frequency measurement on PSCC if no inter-RAT measurement is configured on PSCC. If both inter-frequency and inter-RAT measurement on PSCC are configured, searcher is equally shared between intra-frequency and inter-RAT measurement on PSCC;\nIf a FR2 SCC is configured to UE and it is the first activated serving carrier in that band, it will use half the measurement capability of the second searcher.\nAll the intra-frequency measurements on other SCells and inter-RAT measurements on SCCs equally share the rest measurement capability of the second searcher.\nIn EN-DC, inter-frequency measurement and inter-RAT measurement on the same frequencies are always counted as two candidates when calculating CSSF_within_gap. However, when MO merging condition are satisfied they shall only be counted once. CSSF_within_gap is unneccessarily relexed. Same issue also exists in NR-DC when PCell and PSCell both configure inter-frequency measurements on the same frequency.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3340,"status":"postponed","reservation_date":"2020-10-23 11:24:45","uploaded":"2020-10-23 16:01:48","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1256.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015445.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015446","title":"Correction to CSSF calculation R16","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"In TS 36.133 clause 8.17.4.1 it is specified that the when UE is configured with EN-DC the intra-RAT NR measurement on NR serving carrier should obey requirements for NR intra-frequency measurements. On the other hand. Intra-frequency measurement shall be performed without MG if SSB Is completely contained by active BWP. As a result, it implies that intra-RAT measurement on NR serving carrier shall also be performed without MG in some cases.\nHowever, It conflicts with the calculation of CSSFoutside_gap given in 38.133. cl. 9.1.5.1. One can observe that in RAN4\u2019s understanding only intra-frequency meansurements are considered in CSSFoutside_gap in Rel-15. Then UE don\u2019t know how to calculate CSSF for inter-RAT NR measurments on serving carriers. Measurement delay requirement for inter-RAT measurement on serving carrier is unclear.\nThe carrier-specific scaling factor CSSFoutside_gap,i for measurement object i derived in this chapter is applied to following measurement types:\n-Intra-frequency measurement with no measurement gap in clause 9.2.5, when none of the SMTC occasions of this intra-frequency measurement object are overlapped by the measurement gap.\n-Intra-frequency measurement with no measurement gap in clause 9.2.5, when part of the SMTC occasions of this intra-frequency measurement object are overlapped by the measurement gap.\nUE is expected to conduct the measurement of this measurement object i only outside the measurement gaps.\nFor UE configured with the E-UTRA-NR dual connectivity operation, the carrier-specific scaling factor CSSFoutside_gap,i for intra-frequency SSB-based measurements performed outside measurements gaps will be as specified in Table 9.1.5.1.1-1.\nTable 9.1.5.1.1-1: CSSFoutside_gap,i scaling factor for EN-DC mode\nScenario\nCSSFoutside_gap,i for FR1 PSCC\nCSSFoutside_gap,i for FR1 SCC\nCSSFoutside_gap,i for FR2 PSCC\nCSSFoutside_gap,i for FR2 SCC where neighbour cell measurement is required Note 2\nCSSFoutside_gap,i for FR2 SCC where neighbour cell measurement is not required\nEN-DC with FR1 only CA\n1\nNumber of configured FR1 SCell(s)\nN\/A\nN\/A\nN\/A\nEN-DC with\nFR2 only intra band CA\nN\/A\nN\/A\n1\nN\/A\nNumber of configured FR2 SCells\nEN-DC with\nFR1 +FR2 CA (FR1 PSCell) Note 1\n1\n2\u00d7(Number of configured SCell(s)-1)\nN\/A\n2\n2\u00d7(Number of configured SCell(s)-1)\nEN-DC with\nFR1 +FR2 CA (FR2 PSCell) Note 1\nN\/A\nNumber of configured SCell(s)\n1\nN\/A\nNumber of configured SCell(s)\nNote 1:Only one NR FR1 operating band and one NR FR2 operating band are included for FR1+FR2 inter-band EN-DC.\nNote 2:Selection of FR2 SCC where neighbour cell measurement is required follows clause 9.2.3.2.\nSo we purpose to take inter-RAT measurement on serving carrier into account in the calculation of CSSFoutside_gap. To be more specific, the baseline assumption for CSSFoutside_gap calculation is changed to:\nUE equips two searchers;\nOne searcher is dedicated for intra-frequency measurement on PSCC if no inter-RAT measurement is configured on PSCC. If both inter-frequency and inter-RAT measurement on PSCC are configured, searcher is equally shared between intra-frequency and inter-RAT measurement on PSCC;\nIf a FR2 SCC is configured to UE and it is the first activated serving carrier in that band, it will use half the measurement capability of the second searcher.\nAll the intra-frequency measurements on other SCells and inter-RAT measurements on SCCs equally share the rest measurement capability of the second searcher.\nIn EN-DC, inter-frequency measurement and inter-RAT measurement on the same frequencies are always counted as two candidates when calculating CSSF_within_gap. However, when MO merging condition are satisfied they shall only be counted once. CSSF_within_gap is unneccessarily relexed. Same issue also exists in NR-DC when PCell and PSCell both configure inter-frequency measurements on the same frequency.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3360,"status":"postponed","reservation_date":"2020-10-23 11:24:46","uploaded":"2020-10-23 16:01:48","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1257.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015446.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015527","title":"CR on BFD and CBD requirements","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"Compared with the CSI-RS based RLM requirements, the condition that the CSI-RS resources are over the bandwidth = 24 PRBs is missing. We had submitted corresponding CRs in RAN4#94-e-bis meeting, and some companies pointed that the minimum configurable BW of CSI-RS resource is 24 PRBs. In RAN4#95e meeting, the similar discussion was triggered and companies argued that the condition was needed to guaranteed that the CSI-RS resource for BFD and CBD within the active BWP is at least  over 24 PRBs not only the configured CSI-RS BW. Thus, we propose the changes for CSI-RS based BFD and CBD to clarify the condtion.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3370,"status":"merged","reservation_date":"2020-10-23 11:25:24","uploaded":"2020-10-23 16:09:53","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1293.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015527.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015528","title":"CR on BFD and CBD requirements_R16","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3380,"status":"withdrawn","reservation_date":"2020-10-23 11:25:25","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1294.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015529","title":"CR on RRC-based BWP switch requirements","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"One of the remaining issues in the RAN4#96-e about BWP switching requirements is whether it is applicable for RRC-based BWP switch on SCell with more than one BWP configurations. After check the TS 38.133, it is only possible for an sPCell to change the active BWP by the firstActiveDownlinkBWP-Id or firstActiveUplinkBWP-Id via the RRC reconfiguration. For a actived SCell, the active BWP could be changed by RRC reconfiguration by reconfiguring the parameters of the active BWP without changing the ID. Thus, it is also applicable for an SCell to change the acitve BWP through RRC with more than one BWP configurations.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3390,"status":"revised","reservation_date":"2020-10-23 11:25:26","uploaded":"2020-10-23 16:09:53","revisionof":"","revisedto":"R4-2017342","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1295.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015529.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015530","title":"CR on RRC-based BWP switch requirements_R16","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3410,"status":"agreed","reservation_date":"2020-10-23 11:25:27","uploaded":"2020-11-16 17:51:13","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1296.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015530.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015570","title":"CR to 38.133: Correction to SCell activation delay requirements","source":"ZTE","contact":"Qian Yang","contact-id":45032,"tdoctype":"CR","for":"Agreement","abstract":"It is based on mandatory UE capability whether UE supports configuration of SCell without SSB.\nscellWithoutSSB\nDefines whether the UE supports configuration of SCell that does not transmit SS\/PBCH block. This is conditionally mandatory with capability signalling for intra-band CA but not supported for inter-band CA.\nThe UE capability has no differentiation of FR1 and FR2. However in TS38.133, the requirements for SCell activation without SSB are only specified for FR2 intra-band CA. So the corresponding requirements for FR1 intra-band CA should be added either.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3420,"status":"postponed","reservation_date":"2020-10-23 11:41:43","uploaded":"2020-10-23 13:10:00","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1301.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015570.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015571","title":"CR to 38.133 correction to SCell activation delay requirements","source":"ZTE","contact":"Qian Yang","contact-id":45032,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3430,"status":"withdrawn","reservation_date":"2020-10-23 11:41:44","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1302.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015572","title":"CR to 38.133: Correction to RRC based BWP switch requirements","source":"ZTE","contact":"Qian Yang","contact-id":45032,"tdoctype":"CR","for":"Agreement","abstract":"In TS38.133 the requirements for RRC based BWP switch delay are specified for BWP switch triggered by RRC reconfiguration. However, according to TS38.331, the BWP switch can be triggered by RRC reconfiguration and RRC configuration (including RRCsetup message and RRCresume message).\nThe BWP switch delay, excluding RRC processing time, should be the same for both RRC configuration and RRC reconfiguration. So the current requirements are applicable to BWP switch triggered RRC configuration.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3440,"status":"postponed","reservation_date":"2020-10-23 11:41:45","uploaded":"2020-10-23 13:10:00","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1303.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015572.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015573","title":"CR to 38.133 correction to RRC based BWP switch requirements","source":"ZTE","contact":"Qian Yang","contact-id":45032,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3450,"status":"withdrawn","reservation_date":"2020-10-23 11:41:46","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1304.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015672","title":"[CR] Specify RRC processing delay in TCI state switching delay","source":"ZTE Corporation","contact":"Richie Leo","contact-id":83463,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3460,"status":"agreed","reservation_date":"2020-10-23 12:00:39","uploaded":"2020-10-23 12:19:20","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1310.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015672.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015673","title":"[CR] Specify RRC processing delay in TCI state switching delay (Cat A)","source":"ZTE Corporation","contact":"Richie Leo","contact-id":83463,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3470,"status":"agreed","reservation_date":"2020-10-23 12:00:40","uploaded":"2020-11-17 09:07:20","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1311.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015673.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015731","title":"CR to remove intra-frequency ECID requirements for NE-DC 36133 R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"In current 36.133 measurement requirements are defined for Intra-frequency E-CID when UE is under NE-DC. However, in NE-DC NGC is connected to NR MN, and there is no LPP or NRPPa between NGC and LTE SN. In addition, in clause 5.5.3 of 36.331 it is specified that LTE UE Rx-Tx time difference measurement is only measured for PCell. Therefore, the Intra-frequency E-CID measurement requirements for NE-DC should be removed.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3480,"status":"postponed","reservation_date":"2020-10-23 12:09:34","uploaded":"2020-10-23 16:03:22","revisionof":"","revisedto":"","release":"Rel-15","crspec":"36.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":6974.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015731.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015732","title":"CR to remove intra-frequency ECID requirements for NE-DC 36133 R16","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3500,"status":"withdrawn","reservation_date":"2020-10-23 12:09:35","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"36.133","crspecversion":"16.7.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":6975.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015733","title":"CR to remove inter-RAT ECID requirements for NE-DC 38133 R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"In clause 9.4.1 of 38.133, the applicabalbe requirements for NR \u2013 LTE inter-RAT ECID measurement are defined. For measurements performed on LTE serving frequency, the intra-frequency requirements defined in 8.19.5 of 36.133 apply. However, there is no intra-frequency E-CID measurement that can be configured by LTE SN in NE-DC. Therefore, applicable requirements should be updated.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3510,"status":"revised","reservation_date":"2020-10-23 12:09:36","uploaded":"2020-10-23 16:03:22","revisionof":"","revisedto":"R4-2017344","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1314.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015733.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015734","title":"CR to remove inter-RAT ECID requirements for NE-DC 38133 R16","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3530,"status":"withdrawn","reservation_date":"2020-10-23 12:09:37","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1315.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015735","title":"Discussion on remaining issues in Rel-15 SCell activation requirements","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"discussion","for":"Discussion","abstract":"Proposal 1: The current FR1 SCell activation requirements apply provided that\n-\t\u2018ssb-PositionInBurst\u2019 indicates only one SSB is being actually transmitted, or\n-\t\u2018ssb-PositionInBurst\u2019 indicates multiple SSBs and TCI indication is provided in same MAC PDU with SCell activation, or\n-\tthe SCell is known and UE has reported the SCell with SSB index before the activation, or\n-\tthe Es\/Iot for at least one CSI-RS for CSI that UE is configured to measure is >= -2dB.\n\nProposal 2: The current SCell activation requirements apply provided that the SSB of the to-be-activated SCell is within the first active DL BWP of the SCell.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3540,"status":"noted","reservation_date":"2020-10-23 12:09:38","uploaded":"2020-10-23 16:03:22","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015735.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015736","title":"CR on SCell activation requirements R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"As agreed in R4-2012240, RAN4 needs to capture the applicability of FR1 SCell activation requirements. In addition, the scenario where Scell SSB is outside SCell first active BWP needs to be addressed.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3550,"status":"revised","reservation_date":"2020-10-23 12:09:38","uploaded":"2020-10-23 16:03:22","revisionof":"","revisedto":"R4-2017036","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1316.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015736.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015737","title":"CR on SCell activation requirements R16","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3570,"status":"agreed","reservation_date":"2020-10-23 12:09:39","uploaded":"2020-11-16 17:51:14","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1317.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015737.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015876","title":"Introducing reference to the source of the Lmax and NRLM.","source":"Nokia, Nokia Shanghai Bell","contact":"Lars Dalsgaard","contact-id":69933,"tdoctype":"CR","for":"Agreement","abstract":"The number of RLM-RS resources UE is required to be able to monitor is specified in TS38.213. Also the Lmax value for different frequency ranges is specified in 38.213. These numbers have been copied to RAN4 specification in Table 8.1.1-2. Currently there is no reference to the source of these numbers resulting risk of ambiquity on the requirement..  As defined in TR21.801, Annex C.1.4, duplication of concepts is not preferred and if cannot be avoided, reference should be provided. .\nThis change is not changing any UE requirement or behaviour.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3580,"status":"revised","reservation_date":"2020-10-23 13:47:04","uploaded":"2020-10-23 19:06:10","revisionof":"","revisedto":"R4-2017338","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1335.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015876.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2015877","title":"Introducing reference to the source of the Lmax and NRLM.","source":"Nokia, Nokia Shanghai Bell","contact":"Lars Dalsgaard","contact-id":69933,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3600,"status":"agreed","reservation_date":"2020-10-23 13:47:05","uploaded":"2020-11-16 17:51:14","revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1336.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2015877.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016022","title":"CR 36.133 Removal of brackets for SFTD measurements","source":"Ericsson","contact":"Joakim Axmon","contact-id":62375,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3610,"status":"agreed","reservation_date":"2020-10-23 14:59:04","uploaded":"2020-10-23 16:00:21","revisionof":"","revisedto":"","release":"Rel-15","crspec":"36.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":6989.0,"crrevision":"","crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016022.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016023","title":"CR 36.133 Removal of brackets for SFTD measurements (Rel-16)","source":"Ericsson","contact":"Joakim Axmon","contact-id":62375,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3620,"status":"agreed","reservation_date":"2020-10-23 14:59:06","uploaded":"2020-11-16 17:51:14","revisionof":"","revisedto":"","release":"Rel-16","crspec":"36.133","crspecversion":"16.7.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":6990.0,"crrevision":"","crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016023.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016162","title":"HARQ delay during RRC based BWP, CBW and TCI switching procedures","source":"Ericsson","contact":"Muhammad Kazmi","contact-id":31117,"tdoctype":"other","for":"Discussion","abstract":"The paper discussed impact of ACK delay on RRC based switching delay requirements (BWP, CBW and TCI state change).\n\n\tObservation 1: RRC based BWP switching and UE specific CBW are serving cell procedure performed typically under higher SNR. Therefore, HARQ ACK may be delayed in rare circumstances.\n\n\tProposal 1: Clarify in the core requirement that if the ACK transmission for the received RRC takes longer than the RRC procedure delay for a procedure then the overall switching delay for that procedure may be extended.\n\n\tProposal 2: Proposal 1 is applicable for the following requirements:\n-\tRRC based BWP switching delay \n-UE specific CBW change delay and\n-\tRRC based active TCI state switching delay.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3630,"status":"noted","reservation_date":"2020-10-23 16:02:17","uploaded":"2020-10-23 17:16:07","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016162.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016373","title":"CR to 38.133 on Active BWP switch and Active TCI State Switching requirements - Rel15","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"Currently during RRC based active BWP switch and TCI state switch UE behavior for case when THARQ > TRRCProcessing is not captured. When THARQ > TRRCProcessing , UE might need additional time to send ACK\/NACK and network might wait to switch BWP or TCI state after ACK is received. A longer switching delay is expected in this case.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3640,"status":"revised","reservation_date":"2020-10-23 18:20:11","uploaded":"2020-10-23 21:15:08","revisionof":"","revisedto":"R4-2017041","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1371.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016373.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016374","title":"CR to 38.133 on Active BWP switch and Active TCI State Switching requirements - Rel16","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3670,"status":"revised","reservation_date":"2020-10-23 18:20:13","uploaded":"2020-11-16 17:51:15","revisionof":"","revisedto":"R4-2017380","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1372.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016374.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016580","title":"CR to TCI activation in FR1","source":"Qualcomm Incorporated","contact":"CH Park","contact-id":84478,"tdoctype":"CR","for":"Agreement","abstract":"\u2018TCI indication\u2019 is not included in FR1 SCell activation procedure and time for \u2018L1-RSRP measurement and report\u2019 is not include in unknown FR1 SCell activation requirement in the current version 38.133 spec.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3690,"status":"merged","reservation_date":"2020-10-23 23:39:10","uploaded":"2020-10-23 23:58:20","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1398.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016580.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2016581","title":"CR to SSB-less SCell activation delay requirement for deactivated FR1 SCell","source":"Qualcomm Incorporated","contact":"CH Park","contact-id":84478,"tdoctype":"CR","for":"Agreement","abstract":"SSB-less SCell activation delay requirement for deactivated FR1 SCell is not defined in the current version 38.133 spec, whereas FR2 SCell activation requirements include SSB-less SCell activation latency.","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3700,"status":"postponed","reservation_date":"2020-10-23 23:39:11","uploaded":"2020-10-23 23:58:20","revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1399.0,"crrevision":"","crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2016581.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017000","title":"Email discussion summary for [97e][201] NR_NewRAT_RRM_Core","source":"Moderator (Huawei)","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"other","for":"Discussion","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":2970,"status":"revised","reservation_date":"2020-11-16 09:51:15","uploaded":"2020-11-16 17:51:17","revisionof":"","revisedto":"R4-2017271","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017000.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017034","title":"Correction to CSSF calculation R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3350,"status":"withdrawn","reservation_date":"2020-11-16 09:51:40","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1256.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017035","title":"WF on SSB-less SCell activation delay requirement","source":"Qualcomm","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"other","for":"Discussion","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":2990,"status":"noted","reservation_date":"2020-11-16 09:51:15","uploaded":"2020-11-16 17:51:17","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017035.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017036","title":"CR on SCell activation requirements R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3560,"status":"agreed","reservation_date":"2020-11-16 09:51:59","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2015736","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1316.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017036.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017037","title":"CR on CSI-RS BW condition for BFD\/CBD R15","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3070,"status":"agreed","reservation_date":"2020-11-16 09:51:18","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2014268","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1145.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017037.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017038","title":"CR on AP-CSI-RS based L1-RSRP measurement R15","source":"Apple, Huawei, HiSilicon","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3110,"status":"agreed","reservation_date":"2020-11-16 09:51:20","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2014271","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1147.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017038.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017039","title":"WF on RRC based BWP switching for SCell","source":"Apple","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"other","for":"Discussion","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3000,"status":"approved","reservation_date":"2020-11-16 09:51:15","uploaded":"2020-11-16 17:51:17","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017039.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017040","title":"LS on RRC based BWP switching for SCell","source":"RAN4","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"LS out","for":"Approval","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3010,"status":"approved","reservation_date":"2020-11-16 09:51:15","uploaded":"2020-11-16 17:51:17","revisionof":"","revisedto":"","release":"Rel-15","crspec":"","crspecversion":"","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"RAN2","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017040.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017041","title":"CR to 38.133 on Active BWP switch and Active TCI State Switching requirements - Rel15","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3650,"status":"revised","reservation_date":"2020-11-16 09:52:07","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2016373","revisedto":"R4-2017377","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1371.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017041.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017271","title":"Email discussion summary for [97e][201] NR_NewRAT_RRM_Core","source":"Moderator (Huawei)","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"other","for":"Discussion","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":2980,"status":"noted","reservation_date":"2020-11-16 09:51:15","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2017000","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017271.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017307","title":"CR to SSB-less SCell activation delay requirement for deactivated FR1 SCell","source":"Qualcomm","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3710,"status":"withdrawn","reservation_date":"2020-11-16 09:52:12","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1408.0,"crrevision":"","crcategory":"A","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017331","title":"WF on CSSF calculation for Inter-RAT MO","source":"Huawei, HiSilicon","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"other","for":"Discussion","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3020,"status":"approved","reservation_date":"2020-11-16 09:51:15","uploaded":"2020-11-16 17:51:17","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017331.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017335","title":"CR to TS 38.133 on DCI based BWP switch requirements applicability","source":"NEC","contact":"Kai-Erik Sunell","contact-id":74524,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3320,"status":"agreed","reservation_date":"2020-11-16 09:51:37","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2015300","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1251.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017335.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017336","title":"CR on MO merge in R15","source":"MediaTek inc.","contact":"Zhixun Tang","contact-id":79330,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3240,"status":"agreed","reservation_date":"2020-11-16 09:51:29","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2014765","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1201.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017336.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017338","title":"Introducing reference to the source of the Lmax and NRLM.","source":"Nokia, Nokia Shanghai Bell","contact":"Lars Dalsgaard","contact-id":69933,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3590,"status":"agreed","reservation_date":"2020-11-16 09:52:02","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2015876","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1335.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017338.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017342","title":"CR on RRC-based BWP switch requirements","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3400,"status":"agreed","reservation_date":"2020-11-16 09:51:44","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2015529","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1295.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017342.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017343","title":"CR to remove intra-frequency ECID requirements for NE-DC 36133 R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3490,"status":"withdrawn","reservation_date":"2020-11-16 09:51:53","uploaded":null,"revisionof":"","revisedto":"","release":"Rel-15","crspec":"36.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":6974.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017344","title":"CR to remove inter-RAT ECID requirements for NE-DC 38133 R15","source":"Huawei, HiSilicon","contact":"Jing Han","contact-id":47284,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3520,"status":"postponed","reservation_date":"2020-11-16 09:51:56","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2015733","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1314.0,"crrevision":1.0,"crcategory":"F","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017344.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017377","title":"CR to 38.133 on Active BWP switch and Active TCI State Switching requirements - Rel15","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3660,"status":"agreed","reservation_date":"2020-11-16 09:52:08","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2017041","revisedto":"","release":"Rel-15","crspec":"38.133","crspecversion":"15.11.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1371.0,"crrevision":2.0,"crcategory":"F","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017377.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R4-2017380","title":"CR to 38.133 on Active BWP switch and Active TCI State Switching requirements - Rel16","source":"Apple","contact":"Tang Yang","contact-id":83979,"tdoctype":"CR","for":"Agreement","abstract":"","secretary_remarks":"[97e][201] NR_NewRAT_RRM_Core","agenda_item_sort_order":39,"ainumber":"4.7","ainame":"RRM core requirements maintenance (38.133\/36.133) [NR_newRAT-Core]","tdoc_agenda_sort_order":3680,"status":"agreed","reservation_date":"2020-11-16 09:52:10","uploaded":"2020-11-16 17:51:17","revisionof":"R4-2016374","revisedto":"","release":"Rel-16","crspec":"38.133","crspecversion":"16.5.0","workitem":[{"winame":"NR_newRAT-Core"}],"crnumber":1372.0,"crrevision":1.0,"crcategory":"A","tsg_crp":"RP-202486","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG4_Radio\/TSGR4_97_e\/Docs\/R4-2017380.zip","group":"R4","meeting":"R4-97-e","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]