[{"name":"R5-226001","title":"GCF 3GPP TCL after GCF CAG#72","source":"Ericsson","contact":"Leif Mattisson","contact-id":10602,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.5.3","ainame":"\tOther open issues from joint sessions - original A.I. retained","tdoc_agenda_sort_order":60010,"status":"noted","reservation_date":"2022-10-26 07:59:35","uploaded":"2022-11-05 06:22:25","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_97_Toulouse\/Docs\/R5-226001.zip","group":"R5","meeting":"R5-97","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R5-226038","title":"MCC TF160 ToR 2023","source":"MCC TF160","contact":"Olivier Genoud","contact-id":58316,"tdoctype":"ToR","for":"Agreement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.5.3","ainame":"\tOther open issues from joint sessions - original A.I. retained","tdoc_agenda_sort_order":60380,"status":"endorsed","reservation_date":"2022-10-27 14:02:17","uploaded":"2022-11-16 07:51:13","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_97_Toulouse\/Docs\/R5-226038.zip","group":"R5","meeting":"R5-97","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R5-226331","title":"Discussion on handling of PRD21 v130","source":"CMCC, Ericsson, Huawei, Hisilicon, Nokia, DISH","contact":"Dan Song","contact-id":86282,"tdoctype":"discussion","for":"Endorsement","abstract":"Some Bands\/Configurations may have NO \u201cInterested Operators\u201d\nObservation 1: Some Bands\/Configurations (e.g. railway bands n100 and n101) have been introduced into 3GPP without \u201cInterested Operators\u201d but with \u201cInterested Deployer\u201d. These \u201cInterested Deployer\u201d may be organizations (e.g. railway union) OR a V2X company OR an industry company (e.g. agriculture company, power company) interested in deploying these Bands\/Configurations.\nProposal 1: In PRD21 v130, to introduce a new term of \u201cInterested Deployer\u201d in Section \u201c3.1 Terms\u201d, and to update the whole PRD21 with \u201cInterested Deployer\u201d accordingly.\nInterested Deployer: An organization (e.g. railway union) interested in deploying a 5G NR band or 5G NR CADC configuration (e.g. 5G NR railway band or 5G NR railway CADC configuration), or a V2X company interested in deploying a 5G NR V2X band or 5G NR V2X\u00a0CADC configuration, or an industry company (e.g. agriculture\u00a0company, power company) interested in deploying a 5G NR band or 5G NR CADC configuration.\n\nSome Terms are missing in Section 3.1\n Observation 2: Some terms are missing in Section \u201c3.1 Terms\u201d, including \u201cAssigned band\u201d, \u201cCompleted band\u201d, \u201cInterested Operator\u201d, \u201c Ongoing band\u201d, \u201cPending band\u201d and \u201cResponsible Company\u201d.\nProposal 2: In PRD21 v130, to introduce the missing terms into Section \u201c3.1 Terms\u201d.\nAssigned band: A 5G NR band is assigned to a company volunteering to take responsibility to make sure that the necessary contributions to include the band into RAN5 conformance test specifications are prepared, submitted and agreed in RAN5.\nCompleted band: All CRs required to make the 5G NR band completed have been agreed by RAN5 for inclusion in next version of impacted RAN5 conformance test specifications.\nInterested Operator: An mobile network operator interested in deploying a 5G NR band or 5G NR CADC configuration.\nOngoing band: A 5G NR band that has been interested by at least one \"Interested Operator\" or \"Interested Deployer\" and is open for assignment or contributions in RAN5. As long as a 5G NR band has been interested by at least one \"Interested Operator\" or \"Interested Deployer\", it can be regarded as an Ongoing band no matter it has been assigned to a volunteering company or not.\nPending band: A 5G NR band that has not been interested by any operator or deployer yet in RAN5.\nResponsible Company: A company that volunteers to take responsibility to make sure that the necessary contributions to include a 5G NR band or configuration into RAN5 conformance test specifications are prepared, submitted and agreed in RAN5.\n\nA new 5G NR Rel-17 WI has been introduced at RAN5#96e\nObservation 3: A new 5G NR Rel-17 WI \u201cFurther enhancements of NR RF requirements for frequency range 2 (FR2) (UID-970070)\u201d has been introduced at RAN5#96e.\n Proposal 3: In PRD21 v130, to introduce the new 5G NR Rel-17 WI \u201cFurther enhancements of NR RF requirements for frequency range 2 (FR2) (UID-970070)\u201d into the tables of the following Sections,\nSection \u201c1 Scope\u201d\nSection \u201c4.3 Guidelines to handle the 5G NR feature specific WIs impacting 5G NR CADC configurations\u201d.\n\nThe deadline for operators\/deployers to show \u201cinterest\u201d to bands\/configurations needs FFS\nObservation 4: In PRD21 v120, the deadline for operators\/deployers to show \u201cinterest\u201d to the bands\/configurations is no later than \u201c3GU Opening\u201d which is floating and not easy to anticipate. Meanwhile, \u201cGrace Period\u201d is needed for companies to prepare Tdocs for the newly picked \u201cOngoing\u201d bands\/configurations for the upcoming RAN5 meeting.\nProposal 4: In PRD21 v130, to revise the configuration taking deadline from \u201c3GU Opening\u201d into \u201cTdoc number reservation deadline\u201d, and to update the related guidance in Section 4.1 of PRD21 v130 as follows.","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.5.3","ainame":"\tOther open issues from joint sessions - original A.I. retained","tdoc_agenda_sort_order":63310,"status":"revised","reservation_date":"2022-01-11 07:05:42","uploaded":"2022-11-04 12:01:52","revisionof":"","revisedto":"R5-227525","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_97_Toulouse\/Docs\/R5-226331.zip","group":"R5","meeting":"R5-97","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0},
{"name":"R5-227525","title":"Discussion on handling of PRD21 v130","source":"CMCC, Ericsson, Huawei, Hisilicon, Nokia, DISH","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"discussion","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.5.3","ainame":"\tOther open issues from joint sessions - original A.I. retained","tdoc_agenda_sort_order":63311,"status":"noted","reservation_date":"2022-11-23 15:39:18","uploaded":"2022-11-23 15:41:18","revisionof":"R5-226331","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_97_Toulouse\/Docs\/R5-227525.zip","group":"R5","meeting":"R5-97","year":2022,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]