[{"name":"R5-220010","title":"RAN5#94-e LS Template","source":"WG Chairman","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Information","abstract":"","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.3","ainame":"\tRAN5 PRDs\/Templates","tdoc_agenda_sort_order":100,"status":"noted","reservation_date":"2021-12-26 08:07:27","uploaded":"2022-02-10 15:33:01","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_94_Electronic\/Docs\/R5-220010.zip","group":"R5","meeting":"R5-94-e","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-220451","title":"RAN5 PRD12 version 6.8","source":"MCC TF160","contact":"Olivier Genoud","contact-id":58316,"tdoctype":"other","for":"Approval","abstract":"This PRD covers the process to agree the TTCN of new test cases and to maintain the TTCN of previously approved test cases, using the 3GPP_TSG_RAN_WG5_SIG (RAN5_SIG) email reflector. The protocol test cases from the following 3GPP test specification series are within scope:\n?\tTS 34.123, \n?\tTS 34.229, \n?\tTS 36.523, \n?\tTS 36.579, \n?\tTS 37.571, \n?\tTS 38.523, \n?\tTS 51.010 (note: only the GERAN to UTRAN Inter-RAT test cases).","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.3","ainame":"\tRAN5 PRDs\/Templates","tdoc_agenda_sort_order":4510,"status":"approved","reservation_date":"2022-02-09 14:48:58","uploaded":"2022-02-10 16:19:11","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_94_Electronic\/Docs\/R5-220451.zip","group":"R5","meeting":"R5-94-e","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-220767","title":"PRD21 v0.1.0 on NR bands and 5G NR CADC configuration handling in RAN5","source":"CMCC","contact":"Dan Song","contact-id":86282,"tdoctype":"other","for":"Approval","abstract":"PRD21 describes handling and tracks completion status of RAN5 work items introducing new NR bands, new channel bandwidth extensions of existing NR bands and 5G NR CADC configurations. This also covers handling and tracking of RAN5 work items for introducing new power classes for NR bands and 5G NR CADC configurations.  \nPRD21 is based on the RAN5 agreements in [1-10]. In case of any deviations between PRD21 and the agreements in [1-10], PRD21 takes precedence.\nClause 4 provides RAN5 agreed guidelines for the different areas covered by PRD21: \n-\t5G NR CADC configurations (sub-clasue 4.1)\n-\tNew NR bands and CBW extensions (sub-clasue 4.2)\n-\t5G NR feature specific WIs impacting 5G NR CADC configurations (sub-clasue 4.3)\n-\t5G NR High Power WIs impacting 5G NR CADC configurations (sub-clasue 4.4)\n-\t5G NR CADC fallback configurations without Interested Operator (sub-clasue 4.5)\nThe tracking of completion status, industry priorities and responsibility of NR bands and 5G NR CADC configurations is provided by the PRD21 attached Excel document \"5G NR bands and CADC configurations list\". Clause 5 gives an overview of the different work sheets in the Excel document. \nFor 5G NR CADC configuration work items the handling in RAN5 is based on the following principles endorsed by RAN5 at RAN5#94-e in [10]:\n-\tRAN5 5G NR CADC configuration work items should focus on updating existing test cases and\/or adding new test cases for the new type of 5G NR CADC configurations introduced by the work items. The status of the new 5G NR CADC configurations introduced by the work items shall be tracked in the 5G NR CADC configuration list, including \"Interested Operator\" and the status of \u201cPending\u201d, \u201cOngoing\u201d and \u201cCompleted\u201d.\n-\tThe minimum criteria for closing a RAN5 5G NR CADC work item is that the associated RAN4 core work item(s) are completed; that all required new or existing test cases have been completed for at least one representative 5G NR CADC configuration; and that PRD21 includes all the 5G NR CADC configurations introduced by the associated RAN4 core work items.\n-\tPRD21 is used to keep track of TS 38.101-1 [11], TS 38.101-2 [12] and TS 38.101-3 [13] 5G NR CADC configurations and the status of the configurations in RAN5 conformance test specifications.\n1\tScope\nThe scope of present document is to track status of for NR bands, NR band CBW extensions and 5G NR CADC configurations and its power classes covered by RAN5 work items and to provide a tool and guideline for companies volunteering to take responsibility to introduce new NR bands, NR band CBW extensions and 5G NR CADC configurations in 3GPP RAN5 test specifications.","secretary_remarks":"","agenda_item_sort_order":10,"ainumber":"4.3","ainame":"\tRAN5 PRDs\/Templates","tdoc_agenda_sort_order":7670,"status":"revised","reservation_date":"2022-02-10 14:53:34","uploaded":"2022-02-12 03:18:15","revisionof":"","revisedto":"R5-221398","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_94_Electronic\/Docs\/R5-220767.zip","group":"R5","meeting":"R5-94-e","year":2022,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]