[{"name":"R5-201569","title":"Feature priority inputs for the RAN5 5GS work plan","source":"MCC TF160","contact":"Olivier Genoud","contact-id":58316,"tdoctype":"discussion","for":"Information","abstract":"NOTE: This paper is a re-submission of RAN5#86-e discussion document R5-200245, which had been postponed at RAN5#86-e. No change has been done to the content of the present document compared to the content of R5-200245.\nAt RAN5#84, discussion paper R5-196969 [1] on \u201cFeature priority inputs for the RAN5 5GS work plan\u201d was presented and noted, with inputs from this paper taken into account in the RAN5 5GS work plan.  \nIn the latest version R5-197892 [2] of the RAN5 5GS phasing & planning, post-RAN5#85, the following task was identified for 5GS deployment options 4, 5 & 7: \nTask\tTarget\nRe-confirming MNO earliest date for conformance test cases to support deployments \tJan-20 (send out request by Dec-19)\n\nThe purpose of present paper is to present the outcome of the above task, which was allocated to the MCC TF160 Project Manager.","secretary_remarks":"","agenda_item_sort_order":9,"ainumber":"4.2.1","ainame":"5GS","tdoc_agenda_sort_order":15690,"status":"noted","reservation_date":"2020-05-05 07:48:53","uploaded":"2020-05-05 09:37:15","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-201569.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-201706","title":"Proposing new test cases for small TEI-16 WIs - inter-RAT HO from NR to EN-DC","source":"China Telecommunications, China Unicom, Vodafone, China Mobile, NTT Docomo","contact":"JING ZHAO","contact-id":85327,"tdoctype":"discussion","for":"Endorsement","abstract":"1.\tIntroduction\nThe purpose of this document is to discuss about adding conformance test cases for RAN2's TEI16 small WIs - inter-RAT HO from NR to EN-DC.\n2.\tDiscussion\nThe most operators will deploy EN-DC to support eMBB service in their first stage of 5G deployment, and after that stage, new SA network may be deployed together with part of EN-DC base stations software upgraded to NSA\/SA dual mode. So there will be regions only support NSA co-existing with regions that support NSA\/SA or SA only. When NSA\/SA dual mode UE moves out of NR SA or NSA\/SA cell coverage to NSA cell coverage, direct configuration of EN-DC during inter-RAT handover can reduce the DC configuration latency and quickly recover service data rate after HO procedure. From the operator\u2019s point of view, it would be beneficial to support SA to EN-DC HO in NR practical network.\nR2-2002336 and R2-2002337 had been agreed by RAN2 for adding contents to support inter-RAT handover from NR to EN-DC into TS 38.331 and TS 36.331 in release16 versions:\n\n1.\tA new UE capability indicator nr-HO-ToEN-DC-r16 had been added to indicate the network whether the UE support inter-RAT handover from NR to EN-DC\n2.\t Include the NR SCG configuration and SN security parameters which needed to setup EN-DC in handover command \n3.\tAdd related content of scg-ConfigResponseNR in RRCConnectionReconfigurationComplete to setup EN-DC\n\nRelated additional conformance requirements should be covered in RAN5's spec 38.523 series.\n\n3.\tProposal\nAdding additional test cases into 38.523-1 as follow:\n8.1.4.2.1.2 Inter-RAT handover \/ From NR to EN-DC \/ Success\nRelated test applicability will be added into 38.523-2 as well.","secretary_remarks":"","agenda_item_sort_order":9,"ainumber":"4.2.1","ainame":"5GS","tdoc_agenda_sort_order":17060,"status":"noted","reservation_date":"2020-05-06 06:20:26","uploaded":"2020-05-06 06:41:29","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-201706.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-201955","title":"Check List for adding new NR bands and for new channel bandwidth to existing NR bands","source":"Ericsson","contact":"Leif Mattisson","contact-id":10602,"tdoctype":"other","for":"Endorsement","abstract":"\"The purpose of this document is to provide a check list for actions needed to introduced new NR bands or new channel bandwidths to existing NR bands into 3GPP RAN5 test specifications for 5G \/ NR. The document also calculates the overall completion status per TS that is to be included in the overall work plan. \n\nHow to use it:\n- Use applicable work sheet to identify what need to be added to 3GPP RAN5 TSs to introduce the configuration (You can remove the non-applicable work sheets). \n- Initially all action items are set to 0% in the status column.\n- For NOT applicable action items clear the cell in the status column (delete the 0% value).\n- For Applicable action items indicate use the drop down box in the status column to indicate current completion (values of 0% to 100% in steps of 10%).\n- The overall completion per TS is shown on rows 1 and 2 (columns I to P).\n\nNote! If the new band also introduces a new channel bandwidth then need also the check list for New CBW be considered.\n\nOn request You need to provide the overall completion values for the configuration in the format for inclusion in the relevant overall work plan (5GS_NR_LTE-UEConTest,  NR_bands_BW_R16-UEConTest).\"","secretary_remarks":"","agenda_item_sort_order":9,"ainumber":"4.2.1","ainame":"5GS","tdoc_agenda_sort_order":19550,"status":"revised","reservation_date":"2020-05-07 13:45:35","uploaded":"2020-05-08 05:01:36","revisionof":"","revisedto":"R5-202536","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-201955.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-202169","title":"Proposing new test cases for small TEI-16 WIs - voice fallback indication","source":"CATT","contact":"Xiaozhong Chen","contact-id":50266,"tdoctype":"discussion","for":"Endorsement","abstract":"1.\tIntroduction\nThe purpose of this document is to discuss about adding conformance test cases for RAN2's TEI16 small WIs - voice fallback indication.\n2.\tDiscussion\nCR \"R2-2002326 Introduction of voice fallback indication\" has been agreed by RAN2 for adding contents of voice fallback indication into 38.533 release16 versions:\n\n1.\tAdd voiceFallbackIndication in the MobilityFromNRCommand message\n2.\tIt is specified that in case of failing in inter-RAT handove from NR to E-UTRAN for the purpose of voice fallback, UE shall attempt to select a E-UTRA cell for IMS voice cell setup.\n3.\tAdd voiceFallbackIndication in RRCRelease.\n\nRelated additional conformance requirements should be covered in RAN5's spec 38.523 series.\n3.\tProposal\nAdding additional test cases into 38.523-1 as follow if the conclusion is made at RAN2#110:\n\n11.1.8\tMO MMTEL voice call setup from NR RRC_CONNECTED \/ EPS Fallback with handover \/ Single registration mode with N26 interface \/ Failure\n11.1.9 \tMO MMTEL voice call setup from NR RRC_CONNECTED \/ EPS Fallback with redirection \/ Single registration mode with N26 interface\n\nRelated test applicabilities will be added into 38.523-2 as well.","secretary_remarks":"","agenda_item_sort_order":9,"ainumber":"4.2.1","ainame":"5GS","tdoc_agenda_sort_order":21690,"status":"noted","reservation_date":"2020-05-08 03:35:52","uploaded":"2020-05-08 16:34:18","revisionof":"","revisedto":"","release":"Rel-16","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-202169.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0},
{"name":"R5-202536","title":"Check List for adding new NR bands and for new channel bandwidth to existing NR bands","source":"Ericsson","contact":"Ingbert Sigovich","contact-id":28887,"tdoctype":"other","for":"Endorsement","abstract":"","secretary_remarks":"","agenda_item_sort_order":9,"ainumber":"4.2.1","ainame":"5GS","tdoc_agenda_sort_order":19551,"status":"noted","reservation_date":"2020-06-01 16:30:21","uploaded":"2020-06-10 14:56:19","revisionof":"R5-201955","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_87_Electronic\/Docs\/R5-202536.zip","group":"R5","meeting":"R5-ah-38102","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]